AUG 0 31988 SGTB:CEW 71-9163 Amersham Corporation ATTN: Ms. Cathleen M. Roughan 40 North Avenue Burlington, MA 01803
Dear Ms. Roughan:
This refers to your application dated June 8, 19t,3, requesting renewal of Certificate of Compliance No. 9163 for the Model No. GNG-20.
In connection with our review, we need the information identified in the enclosure to this letter.
The information requested should be submitted within 60 days from the date of this letter. The additional information requested should be submitted in the form of revised pages.
If you have any questions regarding thii; matter, we would be pleased to meet with you and your staff.
Sincerely, o n e 3. e,4 1,y SM W M B. EniuGalhas Charles E. MacDonald, Chief Transportation Branch Division of Safeguards and Transportation, HMSS j
Enclosure:
C As stated j
DISTRIBUTION:
goo NRC l11e Center; PDR
$s@
CEWilliams RChappell g3 NMSS r/f SGTB r/f on pP 1 co x 60 oO ll l
n +l?
,,r om 8
/50 0FC: SGTB
- SGTB
- 5GTB gg
..... _ _. grg ]
gag NAME:CEWilliams/cb:RChaprWil:CEM Donald:
DATE:08/of/88
- 08/6W88:08/7J88 OFFICIAL RECORD COPY
Amersham Corporation Mooel No. GNG-20 Docket No. 71-9163 l
Encl to ltr dtd:
1 1.
Drawings should be revised to eliminate inconsistencies in the construction l
details of the internal cavity.
Drawing No. R-116 does not agree with Dra,' No. NS-GH20-A and Drawing No. NS-GH20-C does not agree with either drav Inconsistencies also exist in other details of construction.
2.
Drawing No. NS-GH2O should show either by note or by detail, the marking and identification requirements of 10 CFR 671.85(c).
3.
The requirements for all packaging weld joints should be reviewed and where appropriate the weld symbol should be corrected to reflect the weld joint geometry pictured on the drawing.
4.
The drawing should state the material specification for each part of the packaging,10CFR671.33(a)(5).
5.
The acceptance tests, maintenance program, and operating procedures for the package should be revised to reflect current programs, procedures, and regulations and current package ownership.
_.