Forwards Insp Rept 99901023/85-01 on 850715-19 & Notice of Nonconformance
ML20151N777
Person / Time
Issue date: 12/31/1985
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Clark R
JOHNSTON PUMP CO.
Shared Package
ML20151N783 List:
References
REF-QA-99901023 NUDOCS 8601030114
Download: ML20151N777 (2)


Text

4

[Q Wtt 'e, UNITED STATES l I NUCLEAR REGULATORY COMMISSION g E WASHINGTON, D. C, 20555 o #

% **** /

December 31, 1985 Docket No. 99901023/85-01 Johnston Pump Company Nuclear Services Division ATTN: Mr. Raymond L. Clark 2601 East 34th Street Chattanooga, Tennessee 37407 Gentlemen:

This refers to the inspection conducted by Mr. E. H. Trottier of this office on July 15-19, 1985, of your facility at Chattanooga, Tennessee and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.

The purpose of this inspection was to review fabrication and repair activities that Johnston Pump Co. has proposed to undertake on safety related pump components manufactured by others. In addition, selected portions of your Quality Assurance Program were reviewed to ensure adequate controls are established and implemented. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection cons.isted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The most significant findings involve inadequate control of special processes (welding) and the failure to technically justify nonconformances that are dispositioned by repair. Specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please ~ provide us within 30 days from the date of this letter, a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response tJme for cause.

yem

~8601030114 851231 PDR GA999EMy%C 99901023

'I

I Johnston Pump Corrpany December 31, 1985 The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, gY gd, inal s$necl Ellis (A). merschoff Gary G. Zech, Chief Vendor Program Branch

{

Division of Quality Assurance, Vendor, and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1. Appendix A-Notice of Nonconformance
2. Appendix B-Inspection Report 99901023/85-01
3. Appendix C-Inspect r n Data Sheets (4 pages)

DISTRIBUTION:

A:VPBIE:09 Reading DQAV7 N ' c RVol ' .. e .

JTCollins JStone GHolahan, NRR/0RAB EWMers.'off EHTrottier Region 11 Bl .

  • Se vious concu ences.

.yPIN ?QAVJr PB:DQAVT B:DQAVT T

Merschoff*

/)11TIrit' tie r*

g,nGGZech ir mes 12/ 3 /85 i/(,/85 82./z 7/85 /q/85