Text
-
Etscraic s
Callaway Plant August 2, 1988 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-1816 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 SPECIAL REPORT 87-12 RESULTS OF THIRD STEAM GENERATOR TUBE INSERVICE INSPECTION Ref: ULNRC-1651, dated 10/15/87 The enclosed Special Report is submitted pursuant to the requirements of Callaway Technical Specification 4.4.5.5.b concerning the third Inservice Eddy Current Inspection of Steam Generators 'A' and
'D' performed from 9/15/87 to 10/2/87 during Calleway Plant's second refueling outage.
This report includes the final Westinghouse results of the inspection, l
IAwsw
. D. Blosser Manager, Callaway Plant JAM / S/ P:jlh
Enclosures:
Special Report 87-12 09 Westinghouse Field Service Report t
ec: Distribution attached f
l 8808090002 880802 PDR ADOCK 05000403 G
PNU Mahng Aadress' P.O. Box 620 Fulton, MO Em51 a
m
cc distribution for ULNRC-1816 Mr. A. Bert Davis Mr. Thomas-Alexion _(2 copies)
Regional Administrator Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Ccemission U. S. Nuclear Regulatory Commission Region III Mail Stop 13-E-21 799 Roosevelt Road Washington, D.C.
20555 Glen Ellyn, IL 60137 American Nuclear Insurers Mr. O. Maynard c/o Dottie Sherman, Library Wolf Creek Nuclear Operating Corp.
The Exchange Suite 245
'P. O. Box 411 270 Farmington Avenue Burlington, KS 66839 Farmington, CT 06032 Mr. Merlin Williams Manager, Electric Department Supt. of Regulatory Quality &
Missouri Public Service Commission Administrati're Services.
P. O. Box 360 Wolf Creek Nuclear Operating Corp.
Jefferson City, M0 65102 P. O. Box 411 Burlington, KS 66839 Records Center Institute of Nuclear Pouer Operations Mr. R. W. DeFayette Suite 1500 Chief, Project Section 3A 1100 Circle 75 Parkway U.S. Nuclear Regulatory Commission Atlanta, GA 30339 Region III 799 Roosevelt Road NRC Resident Inspector Glen Ellyn, IL 60137 D. F. Schnell (400)
G. L. Randolph W. R. Campbell R. P. Wendling (470)
A. P. Neuhalfen A. C. Passwater/D. E. Shafer/D. J. Walker (470)
G. A. Hughes Z170.05 (QA Record) 240SR (Z170.09 Commercial Record)
M. E. Evans M. E. Taylor H. Wuertenbaecher, Jr. (100)
S. L. Auston (470)(N3RB)
S. J. Bellers/J. D. Schnack 3456-0021.6 3456-0260 Z40ULNRC A160.761 N. Date (Sandra Auston) (470)
SPECIAL REPORT ~ 87 -12 RESULTS OF THIRD STEAM GENERATOR TUBE INSERVICE INSPECTION This report is submitted in accordance with Technical Specification (T/S) 4.4.5.5.b which states:
"The complete results of the steam. generator tube inservice inspection shall be submi ted to the Commission in a Special Report. pursuant to Specification 6.9.2 within 12 months following the completion of the inspection.
This Special Report shall include:
(1) Number and extent of tubes inspected, (2) Location and percent of wall-thickness penetration for each indication of an imperfection, and (3)
Identification of tubes plugged."
From 9/15/87 to 10/2/87 with the plant in Mode 6 - Pefueling for the second refueling outage, the third plant Steam Generator (S/G) Eddy Current Inservice Inspection was performed.
S/G's 'A' and 'D' were inspected. The inspection was performed by Westinghouse Electric Corporation and their formal results are detailed in the Field Service Report (FSR) which is submitted with this Special Report.
Although the Westinghouse FSR provides details on the inspection, the results are summarized below and are numbered to correspond with the information requested by T/S 4.4.5.5.b:
(1) Number / Extent of Inspected Tubec (a) Steam Generator 'A':
A total of 3507 tubes were tested. Three thousand one hundred forty-eight (3148) were tested full length, 204 to the 1st support Hot Leg side, and 155 tested through the U-bend.
Three (3) tubes were plugged as a result of eddy current in9.ications.
One (1) of these tubes was an Anti-Vibration Bar indication, one tube as a result of a dent signal at the top of the tubesheet, and one was a support plate indication, (b)
Steam Generator 'D':
A total of 3508 tubes were tested.
Three thousand one hundred forty-four (3144) were tested full length, 209 to the 1st support Hot Leg side and 155 tested through the U-bend.
Five (5) tubes were plugged as a result of eddy current indications.
Four (4) of these tubes were Anti-Vibration Bar indications.
Page 1 of 2
(2) Location / Percent of Wall-Thickness Penetration for Each Indication of Imperfection See Tables 1 and 2 (3)
Identification of Tubes Plugged From the Third Inservice Inspection S/G 'A' S/G 'D' Row Column Row Column 3
44 46 72 51 60 56 81 17 55 33 12 43 21 47 86 (4) Additional Information: Cumulative Tube Plugging for S/G's
'A' and 'D' S/G 'A' S/G 'D' Row Co'1umn Row Column Manufacturirg 28 80 49 75 28 93 11 19 10 28 9
27 Preservice 49 40 34 51 Inspection 28 90 44 68 36 109 1
42 1
65 13 104 6
114 2nd Refueling 3
44 46 72 Outage 51 60 56 81 17 55 33 12 43 21 47 86 Page 2 of 2
SPECIAL REPORT 87-12 TABLE 1 TUBE IMPERFECTIONS - STEAM GENERATOR 'A' Indication Inch (+)
(% of Wall (From Row Column Thinning)
Location Location) 9 3
11 1C 2.3 32 10 32 AV5 0.0 32 10 31 AV5 0.0 39 16 12 AV4 0.0 40 17 15 AV3 0.0 29 21 26 AV2 0.0 29 21 25 AV2 0.0 29 21 BD 0.0 42 21 12 TSC 7.9 32 22 19 AV2 0.0 27 23 15 IC 35.3 27 25
'3 6C 35.6 27 26 14 2C 17.0 27 26 14 BPC 8.2 42 26 D
3H 14.0 42 26 22 3H 14.4 l
42 26 28 2C 25.4 42 26 SCM 3H 14.7 j
43 28 22 2C 13.6 l
27 30 INR 7H 12.4 27 30 INR 7H 30.5 KEY - Tables 1 and 2 AV1,2,3,4,5,6 - Anti-Vibration Bars IC, 6C, 7H, etc. - Tube Support Plate Numbers / Cold Leg (C), Hot Leg (H)
BD - Bad Data BPC - Baffle Plate Cold BPH - Baffle Plate Hot D - Dent DI - Distorted Indication INF - Indication Not Found INR - Indication Not Recordable (<10%)
SCM - See Comment (Manufacturer's Burnish Mark)
TSC - Tubesheet Cold TSH - Tubesheet Hot UDS - Undefined Signal (plugging not required)
Page 1 of 7
SPECIAL REPORT 87-12 TABLE 1 (continusd)
TUBE IMPERFECTIONS - STEAM GENERATOR 'A' Indication Inch (+)
(% of Wall (From Row Column Thinning)
Location Location) 30 31 31 SC 15.8 40 32 11 TSC 6.5 53 33 24 AV5 0.0 53 33 27 AV5 0.0 43 34 D
TSH 4.4 43 34 UD3 TSC 0.4 52 34 15 AV5 0.0 54 36 D
7H 0.0 54 36 16 AV3 0.0 54 36 34 AV4 0.0 54 36 D
7H 0.0 54 36 25 AV4 0.0 23 37
<20 5H 5.1 27 39 22 1C 34.3 27 41 16 SH 13.7 19 42 30 BPC 12.6 3
44 45 7H 0.1 3
44 INF 7H 0.0 35 44 23 3C 4.8 9
45 UDS TSH 14.6 39 45 22 AV2 0.0 39 45 28 AV6 0.0 39 45 20 AV2 0.0 39 45 23 AV6 0.0 36 46 18 4C 7.7 49 48 24 6C 3.7 21 49 23 SC 28.1 40 49 DI 3C 2.0 44 51 DI 7l1 7.4 44 51 SCM 7H 7.3 Page 2 of 7
SPECIAL REPORT 87-12 TABLE 1 (continued)
TUBE IMPERFECTIONS - STEAM GENERATOR 'A' Indication Inch (+)
(% of Wall (From Row Column Thinning)
Location Location) 5 52 15 2H 29.2 9
53 16 1C 29.3 47 53 10 AV3 0.0 49 53 17 2H 7.0 36 55 13 SC 18.5 48 55 11 2H 14.3 48 55 24 2H 11.8 48 55 SCM 2H 11.7 55 56 23 3C 3.4 45 57 17 3H 39.2 45 57 19 3H 34.2 49 57 22 AV3 19.0 49 57 SCM AV3 19.0 54 57 29 1H 20.3 54 57 SCM IH 20.5 55 58 27 4H 18.4 55 58 SCM 4H 18.5 30 60 19 TSH 16.3 48 60 13 1C 0.0 51 60 15 AV2 0.0 51 60 38 AV3 0.0 51 60 15 AV4 0.0 51 60 16 AV5 0.0 51 60 33 AV3 0.0 54 60 15 AV5 0.0 54 60 23 3C 37.9 l
6 61 27 3C 20.4 47 61 21 2H 15.1 47 61 SCM 2H 15.0 51 61 36 4C 36.3 56 61 19 TSH 15.8 Page 3 of 7
.. =. = _ - -
l SPECIAL REPORT 87-12 TABLE 1 (continued)
TUBE IMPERFECTIONS'- STEAM GENERATOR 'A' Indication Inch (+)
(% of_ Wall (From Row Column Thinning)
Location Location) 40 62 18-6H 27.6 37 63 18 IH 16.3 37 63 22
' 1H 13.5 37 63 SCM 1H 13.2 53 64 18 1H 34.6 26 65 17 4C 3.0 26 65 12 4C 13.0 26 65 21 40 6.4 26 65 11 3C 39.5 44 65 27 TSH 8.4 44 65 19 4C 6.1 44 65 SCM TSH 8.4 30 66 12 AV6 1.8 44 68 DI 7H 22.7 44 68 SCM 7H 22.4 1
70 UDS 2H 38.5/45.2 32 70 17 1H 8.0 1
71 UDS 1H 11.4/13.6 1
72 UDS 2H 38.5/43.5 3
72 UDS 1H 1.8 42 74 UDS 2C 35.9 33 79 DI IH 23.9 33 79 SCM IH 23.9 3
80 UDS 1H 39.6/45.4 27 80 17 7H 37.4 31 80 18 AV5 6.0 38 80 17 2H 17.7 Page 4 of 7
, - - - i w-n,3,w-,
---ww+-
ww-rw--tv--r w ' -e " rt - v ~
e--
-+
c,-~
e wr--4 re*<-
-F P-*5 - e- ~ rw = 7 +r'w-w- - -
TrTT-~~-eF"*rv**-M'*-F'*e'
"^"T-**--
w=
- ~ ' ' * ' "M" * ' ' '
4 SPECIAL P'DORT 87-12 TABLE 1
..)ntinued)
TUBE IMPERFECTIONS - STEAM GENERATOR 'A' Indication Inch (+)
(% of Wall (From Row Column Thinning)
Location Location) 49 80 27 BPH 10.9' 49 80 SCM BPH 10.9
- 38 83
~22 TSH 2.2 38 83 SCM TSH.
2.2 43 83 17 TSH 11.7 43 83 D
SC 4.9 28 84 15 3C 36.1 28 84 11 2C 9.9 55 84 11 2C 34.8 50 85 17 4H 35.6 50 85 16 5H 4.4 50 85 19 SH 37.3 5'
85 19 4C 17.4 50 86 19 3C 16.1 53 87 18 1H 27.6 53 87 18 1H 29.4 46 88 20 AV3
- 0. 0 -
46 88 15 AV3 0.0 53 88 15 1H 37.0 40 89 16 1C 25.2 49 89 15 SC 25.7 15 91 BD 0.0 15 91 27 3H 15.8 15 91 22 3H 21.2 15 91 SCM 3H 15.8 15 91 SCM 3H 21.1 j
45 91 DI 3H 32.1 45 91 SCM 3H 31.8 40 92 UDS 6H 27.0 37 93 13 60 0.0 i
49 93 16 4C 15.9 Page 5 of 7
SPECIAL REPORT 87-12 i
-TABLE 1 (continued) l TUBE IMPERFECTIONS - STEAM GENERATOR 'A' Indication Inch (+)
(% of Wall (From Row Column Thinning).
Location 1.ocation) 33 94 17 IH 37.7 i
. 45 94
'D 7H 0.0 45 94 19 AV6 10.0 45 94 D
7H 0.0 49 94 3
AV5 0.5 26 95 15 AV1 2.2 26 95~
17 AV1 2.2 37 95 12 6H 29.4 44 95 18 1 11 9.3 33 96 12 3C 36.9 d
40 96 15 2C 7.9 40 96 10 2C 9.2 33 97 14 SH 32.4 36 97 17 5C 7.4 44 97 11 3C 23.1 l
42 98 17 3C 9.3 28 99 15 7H 7.4 33
.100 30 5H 6.6 33 100 SCM 5H 6.7=
4 37 100 12 3H-23.3 42 100 19 3C 24.0 44 100 11 1H 12.2 44 100 D
7C 0.0 42 101 14 TSH 9.2 44 102 15 6H 11.2 44 102 D
70 0.0 44 102 D
7C 1.0 37 103 22 3C 2.7 41
'103 14 6C 26.6 Page 6 of'7
SPECIAL REPORT 87-12 TABLE 1 (continusd)
TUBE IMPERFECTIONS - STEAM GENERATOR 'A' Indication Inch (+)
(% of Wall (From Row Column Thinning)
Location Location) 41 104 11 6H 36.3 28 110 24 TSH 14.2 28 110 15 6H 16.9 28 110 SCM TSH 14.3 28 111 6
AV1 3.9 32 111 17 1H 6.3 32 111 17 IH 9.8 32 111 12 IH 12.3 26 116 D
1H 0.0 26 116 D
4H 0.0 26 116 16 3C 21.2 Page 7 of 7
SPECIAL REPORT 87-12' TABLE 2 TUBE IMPERFECTIONS - STEAM GENERATOR 'D' Indication Inch.(+)
.(% of Wall (From Row Column
' Thinning)
Location
. Location) 13 5
19 1H 3.8 33 12 36 AV5
.0.0 33
-12 26 AV5 0.0 13 14 17 6H 15.9 25 14 16 2H 38.6 25 14 13 4H 3.6 36 15 15 AV4 0.0' 37 15 17 BPH 9.5 37 17 21 AV3 0.0 37 17 19 AV3 0.0 41 19 16 2H 23.1 41 19
<20 2H 33.1 41 19 16 3H 3.0 l
41 21 19 AV4 0.0 41 21 30 AV5 0.0 i
41 21 16 AV4 0.0 41 21 23 AV5 0.0 43 21 23 AV4 0.0 43 21 39 AV5 0.0 43 21 25 AV4 0.0 43 21 39 AV5 0.0
^
40 22
<20 3H 16.3 l
1 23 15 6H 33.7 1
23 18 6H 33.7 28 23 30 AV6 3.3 28 23 SCM 0.0 40 23 19 AV5 0.0 41 23 18 5H 21.7 41 25 15 3H 32.7 48 25 13 AV4 0.0 41 26 15 BPH 7.4 Page 1 of 7
..-,...m~.
--..,..,-----.,-,...z.,,...,,-.
,.m_-.,_..-,,--.._,..-.,
, _.. _,, _.., _ _ _. - ~. -.. -,. -
,,7._..
SPECIAL REPORT 87-12 TABLE 2 (continued)
TUBE IMPERFECTIONS - STEAM GFNERATOR 'D' l
Indication Inch (+)
(% of Wall (From
)
Row Column Thinning)
Location Location) j 5
27 UDS 6H 22.1 i
5 27 UDS 6H 6.2/9.5 19 27 DI IH 29.0 44 28 13 AV2 0.0 47 28 16 AV2 0.0 47 28 33 AV4 0.0 47 28 26 AV4 0.0 49 28
<20 SC 27.5 43 31 DI SH 6.9 45 33 15 AV2 0.0 45 33 14 AV3 0.0 45 33 29 AV5 0.0 45 33 20 AV5 0.0 47 33 21 AV3 0.0 47 33 INF AV3 0.0 47 34 17 AV4 0.0 47 35 14 AV4 0.0 47 35 26 AVS 0.0 47 35 23 AV5 0.0 l
53 35 16 4H 22.7 1
53 35 D
AV6 18.2 53 35 D
6C 29.3
)
13 36 11 2H 36.8 l
39 36 12 3H 33.8 45 37 14 AV4 0.0 45 37 27 AV5 0.0 45 37 25 AV5 0.0 47 38 21 AV4 0.0 47 38 23 AV4 0.0 35 40 15 BPH 10.1 35 40 16 4H 24.3 50 40 15 2H 1.7 Page 2 of 7
SPECIAL REPORT'87-12 TABLE 2 (continued)
TUBE-IMPERFECTIONS - STEAM GENERATOR 'D' i
LIndication Inch (+)
(% of Wall (From Row Column Thinning)
Location Location) 4 27 41 DI 3H 25.3 27 41 DI 3H' 18.9 47 41 18 AV3 0.0 47 41 27 AV4 0.0 47 41 20 AV4 0.0 37 43 14 20 31.3 17 44 35 4H 28.4 17 44 SCM 0.0 28-44 BD 0.0 28 44 13
~4H 19.8 28 44 25 5H 28.6 28 44 SCM 0.0 43 49 12 2'
19.7 43 49 12 2H 17.3 43 49 13 2H 4.0 43 49 13 6C 10.2 46 49 19 3C
-39.3 36 50 17 3H 23.8 43 50 13 BPC 14.5 46 50 19 AV3 0.0 46 50 D
7C 0.0 47 50 15 AVS 0.0 i
25 52 19 SC 18.7 9
53 DI AVI 3.9 9
53 SCM 0.0 41 56 BD 0.0 41 56 29 1H 16.2 41 56 SCM 0.0 28 57 12 6H 19.5 34 59 14 1C 20.1
'44 61 14 50 4.8 13 62 19 7H 2.9 j-Page 3 of 7
~,
SPECIA1 REPORT 87-12 TABLE 2-(continusd)
TUBE IMPERFECTIONS - STEAM GENERATOR 'D' Indication Inch (+)
(% of Wall (From Row Column Thinning)
Location Location) 50 62 11 4H 16.7 50 62 11 4H 28.9 50 62 15 2C 18.0 5
64 UDS SC 37.2/41.9 49 64 22 2H 23.6 49 64 SCM 0.0 42 65 8
AV2 0.0 42 65 18 AV5 0.0 52 65 10 AV4 0.0 52 66 14 AV2 0.0 52 66 10 AV3 0.0 52 66 9
AV4 0.0 52 66 22 AV2 0.0 45 68 12 BPC 4.6 52 68 11 AV2 0.0 52 68 18 AV3 0.0 52 68 11 AV5 0.0 53 69 15 5H 3.0 17 71 17 TSH 6.1 17 71 18 1H 8.1 I
30 71 17 4H 32.6 43 71 18 4H 32.6 43 71 11 5H 1.8 45 71 3
AV1 2.9 45 71 SCM 0.0 17 72 12-TSH 6.4 17 72 18 1H 8.4 37 72 14 AV4 0.0 46 72 11 AV2 0.0 46 72 46 AV3 0.0 46 72 18 AV4 0.0 i
46 72 22 AV5 0.0 a
46 72 5
AV6 0.0 46 72 43 AV3 0.0 i
Page 4 of 7
'+
n.
SPECIAL REPORT 87-12.
1 TABLE 2 (continued)-
TUBE IMPERFECTIONS - STEAM GENERATOR 'D' i
Indication Inch (+)
-(% of. Wall-(From i
Row Column Thinning)
Location Location) l 40 74 13 AV5 0.0 1
52 74 9
AV1 0.0 52 74 8
AV2 0.0 52 74 18 AV3 0.0 52 74 11-AV4 0.0
.52 74 16 AVS 0.0 52 74 6
AV6 0.0 52 74 19 AV3 0.0 39 76 11 AV4 0.0-47 76 18 3C 7.1 39 77 13 AVS 0.0 j
33 79 12 4H
'14.5 45 79 19 BPC 17.2 49 79 18 2C 11.9 33 80 15 3H 12.1 56 81 46 TSil 4.3 56 81 D
6H 0.0 56 81 41 TSH 5.1 33 82 19 1C 4.7 33 82 13 10 12.0 1
48 82 10 AV3 0.0 48 82 18 AV4 0.0 l
48 83 14 1C 31.2 j
5 84 UDS 3C 36.0/45.8 36 84 10 AV3 0.0 47 84 D
7H 0.0 47 84 19 AV4 0.0 47 84 D
7C 0.0 49 84 15 AV3 0.0 49 84 19 AV4 0.0 49 84 17 AVS 0.0 Page 5 of 7
.o, SPECIAL REPORT 87-12 TABLE 2 (continued)
TUBE IMPERFECTIONS - STEAM GENERAT02 'D' 4
Indication Inch (+)-
(% of Wall
-(From' Row Column Thinning)
Location Location) 49 85 23 AV2 0.0 49 85 13 AV3 0.0 49 85 32 AV4 0.0 l
49 85 27 AVS 0.0 49 85 27 AV2 0.0-49 85 38 AV4 0.0 l
50 85 27 AV2 0.0 50 85 16 AV3 0.0 50 85
.9 AV4 0.0 50 85 21 AV5 0.0~
50 85 31 AV2 0.0 50 85 18 AV3' O.0.
50 85 22 AV5 0.0 39 86 10 AV4 0.0 47 86 37 AV4 0.0 47 86 22 AV5 0.0 47 86 32 AV4 0.0 39 87 14 AV4 0.0-39 87 12 AV5 0.0 i
40 87 DI BPC 5.3 41 87 17 IC 31.0 51 87 12 2C 34.9 51 88
-15 10 10.9 49 90 15 AV2 0.0 i
49 90 16 AV4 0.0 27 91 19 4C 25.0-35 91 19 AV2 6.1 39 91 13 AV4 0.0 43 94 14 3H 5.2 1
96 28 6H 24.0 l
30 96 17 4C 25.5 Page 6 of 7
_...,--- - -..._ _ a
c SPECTAL REPORT 87-12 TABLE 2 (continued)
TUBE IMPERFECTIONS - STEAM GENERATOR 'D' Indication Inch (+)
(% of Wall (From Row Col'jan Thinning)
Location Location) 30 103 25 3H 37.5 30 103 SCM 0.0 40 104 14 3H 14.3 40 104 19 AV4 5.2 35 110 25 AV4 0.0 35 110 17 AV4 0.0 5
115 17 2C 14.5 22 117 18 4H 6.0 1
121 27 7H 0.6 Page 7 of 7
- ~
/,.
s dx b U, Westinghouse Power Systems p hyjgg,,y, Bc Electric Corporation SCP-87-306 December 11, 1987 Mr. A. C. Passwater REF: UE P0 95118
)
Union Electric Company 1901 Gratiot Street St. Louis, MO 63166 Union Electric Company Callaway Nuclear Plant,,
Refuel 2 Steam Generator Eddy Current Insoection
Dear Mr. Passwater:
The purpose of this transmittal is to provide the attached Westinghouse NSID Primary Services Field Services Report for Eddy Current Inspection and Mechanical Plugging of Steam Generators A and D at the Callaway plant.
This document is provided for your records and includes inspection data,
(").
plugging summary, field procedures, process control and data sheets, personnel V
documentation and equipment documentation.
If you have any questions regarding this report, please contact us.
Yo rs ver truly,
. h.
G. A. Blasfold, Project Engineef Callaway Projdct U.S. Nuclear Projects b
'~
L. R. Benson, Manager Mid West Area f
U.S. Nuclear' Projects cc:
T. Herrmann T. Pettus W. Campbell O
O Steam Generator Primary Services t
Field Service Report 1
\\
O w,
I Westinghouse Nuclear Energy Systems Nuclear Services Integration Division l
-