ML20151L910
| ML20151L910 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/05/1997 |
| From: | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Hagan J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20151L913 | List: |
| References | |
| 50-416-97-14, NUDOCS 9708080015 | |
| Download: ML20151L910 (6) | |
See also: IR 05000416/1997014
Text
.
.
..
.
-
.
.
.
.
-
-
--
' .
{h
,jv WW
UNITE D ST ATES
/'
ft
NUCLEAR REGULATORY COMMISSION
'
-
>c<
q
{.f
,
REGION 4V
^* ,
3
S,
f
611 RYAN PL AZA DRIVE, SUIT E 400
I
b
'#
/
AR LINGTON, TE X AS 76011 8064
I
y
....*
f
August 5,1997
I
.
Joseph J. Hagan, Vice President
Operations - Grand Gulf Nuclear Station
.
Entergy Operations, Inc.
!
P.O. Box 756
Port Gibson, Mississippi 39150
,
SUBJECT: NRC INSPECTION REPORT 50-416/97-14 AND NOTICE OF VIOLATION-
'
Dear Mr. Hagan:
i
An NRC inspection was conducted July 14-17,1997, at your Grand Gulf Nuclear Station
j
reactor facility. The enclosed report presents the scope and results of that inspection.
j
A violation of NRC requirements was identified. The violation involved two examples of
j'
failures to control personnel access to high radiation areas in accordance with the technical
'
specification requirements. The NRC is concerned because the corrective actions taken
after the first example were not effective in preventing the second example.
i
f
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detailin the enclosed report. Please note that
'
you are required to respond to this letter and should follow the instructions specified in the
,
"
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
i
regulatnry requirements.
E
'In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
j
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response should not include any personal privacy,
1
proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
Should you have any questions concerning this inspection, we will be pleased to discuss
,them with you.
/
Sincerely,
'
,
Arthur T. Howell lit, Director
9708000015 970005
'
Division of Reactor Safety
ADOCK 05000416
kkl!khkkhh!k
,
,
,
.
. . _ . _ .
_ . _ _ _ .
_.. _._. _ -
___
_ . . _ - . . . _ _ . . _ . - -
_ . _ . _ _ . _ _ . . - . _
_ .- .. ._
,
i
l
i
!
b-
!
i
-
i
Entergy Operations, Inc.
-2-
,
I
!
l
l
'
!.
!
l
Docket No.: 50-416
l
License No.: NPF-29
,
l
Enclosures:
l
l
2. NRC Inspection Report
50-416/97-14
'
I
cc w/ enclosures
'
Executive Vice President .
+
and Chief Operating Officer
Entergy Operations, Inc.
t
'
P.O. Box 31995
Jackson, Mississippi 39286-1995
-
Wise, Carter, Child & Caraway
P.O. Box 651
Jackson, Mississippi 39205
i
t
i
Winston & Strawn
l
1400 L Street, N.W. - 12th Floor
Washington, D.C. 20005-3502
l
Sam Mabry, Director
Division of Solid Waste Management
Mississippi Department of Natural
Resources
P.O. Box 10385
Jackson, Mississippi 39209
President
-
.
Claiborne County Board of Supervisors
Port Gibson, Mississippi 39150
Manager of Operations
Bechtel Power Corporation
P.O. Box 2166
,
Houston, Texas 77252-2166
General Manager
.
Grand Gulf Nuclear Station
i
Entergy Operations, Inc.
j
i
P.O. Box 756
'
l
Port Gibson, Mississippi 39150
.
.
-
-
-
. -
.
-.
._
..
i
.
.
l
~
,
I
Entergy Operations, Inc.
-3-
,
i
.
1
The Honorable William J. Guste, Jr.
Attorney General
Department of Justice
l
State of Louisiana
P.O. Box 94005
)
l
Baton Rouge, Louisiana 70804-9005
Office of the Governor
State of Mississippi
Jackson, Mississippi 39201
Mike Moore, Attorney General
Frank Spencer, Asst. Attorney General
State of Mississippi
P.O. Box 22947
Jackson, Mississippi 39225
l
Dr. F. E. Thompson, Jr.
,
State Health Officer
1
State Board of Health
P.O. Box 1700
Jackson, Mississippi 39205
i
Eddie S. Fuente, Director
State Liaison Officer
Division of Radiation Health
Mississippi Department of Health
-
P.O. Box 1700
'
Jackson, Mississippi 39215-1700
Vice President
Operations Support
Entergy Operations, Inc.
i
P.O. Box 31995
Jackson, Mississippi 39286-1995
Director, Nuclear Safety
and Regulatory Affairs
Entergy Operations, Inc.
!
P.O. Box 756
[
Port Gibson, Mississippi 39150
!
l
!
!
- - - -
.
l-
.
-4-
Entergy Operations, Inc.
Vice President, Operations
Grand Gulf Nuclear Station
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
-
--
-_
__
-
- ]
'
,
-
i
1
Entergy Operations, Inc.
-5-
l
'
,
'
/
1
/
l
E-Mail report to T. Boyce (THB)
'
E-Mail report to NRR Event Tracking System (IPAS)
/
j
E-Mail report to Document Control Desk (DOCDESK)
'
'
/
bec to DCD (IE06)
i
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (River Bend)
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
Senior Resident inspector (Grand Gulf)
,
!
,
i
DOCUMENT NAME:
,
To receive copy of documer3. Indicate in box:"C" = Copy without enclosure
" = Copy with enclosures "N" = No copy
RIV:SRS:PSB
C:PSB
D:DRP
,.FW$RM
/o
&
,
LTRicketson/Imbj472 BMurray
P
TPGwynnTV,gVAJHowell llP
07 &/97
'N
07tD97
O$'//97Q W
01/f/97
OFFICIAL RECORD COPY
f'
1
y
-j
Q
,'
I
Entergy Operations, Inc.
-5-
.
t
-
-
E-Mail' report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE06)
bec distrib by RIV:
Regional Administrator -
Senior Resident inspector (River Bend)
DRP Director
DRS-PSB
Branch Chief (DRP/D)
MIS System
Project Engineer (DRP/D)
RIV File
Branch Chief (DRP/TSS)
Senior Resident inspector (Grand Gulf)
.
.
-
i
1
!
DOCUMENT NAME:
.
To receive copy of document, indicate in box:"C" = Copy without enclosure
" = Copy with enclosures "N" = No copy
l
RIV:SRS:PSB
C:PSB
D:DRP
,.V'LQ@RM
[
l
x
,
LTRicketson/im@ BMurray
P
TPGwynn7,gA$Howell llP
I
07p/97
N .07Q97
0$'//97b @
03/fl97
..
I
OFFICIAL RECORD COPY
,
i
'
i
l
l^
.
.