Ack Receipt of NRC SER on Deferred WNP-1 Project Conformance to Reg Guide 1.97.Facility Conformance W/Design & Development Deferred Until After Const Restart
ML20151L382
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/28/1988
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GO1-88-0055, GO1-88-55, NUDOCS 8808040026
Download: ML20151L382 (2)


Text

- _ _ _ _ _ _

I 6

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

  • 3000 George \\Yashington \\Vay
  • Richland, \\Yashington 99352 Docket No. 50-460 July 28, 1988 C01-88-0055 l

Document Control Desk U. S. Nuclear Regulatory Commission Mail Station P1-137 Washington D.C.

20555

Subject:

NUCLEAR PROJECT NO. 1 EMERGENCY RESPONSE CAPABILITY CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 3

Reference:

1) Letter, G. C. Sorensen (Supply System) to J. F. Stolz, Project Director, PWR Licensing-8, USNRC, "Response to Requests for Information Regarding Regulatory Guide 1.97,"

(G01-86-0035), dated February 6, 1986.

2) Letter, Lester S. Rubenstein (USNRC) to D.W. Mazur (Supply System), "Emergency Response Capability - Conformance to Regulatory Guide 1.97, Revision 3 for Washington Public Power Supply System Nuclear Project No. 1 (WNP-1)," (GIl-88-0098),

dated June 1, 1988.

This letter is to acknowledge receipt of the NRC Safety Evaluation Report on the deferred WNP-1 Project Conformance to Regulatory Guide 1.97 (Reference 2).

Because of the long term deferred status of WNP-1 and the limited engineering resources applied to the projecc since early 1986, the Regulatory Guide 1.97 conformance design has not advanced. As a result, we are unable, at this time, to commit to installation of category 2 instrumentation to monitor the pressurizer heater status, emergency ventilation damper position, condenser air removal system exhaust and gland steam exhaust.

The WNP-1 Regulatory Guide 1.97 conformance design and development of applicable commitments has been deferred until after construction restart.

When construction resumes we will develop a schedule for the complete Regulatory Guide 1.97 conformance effort.

[00) 8808040026 880728 I

l

[DR ADOCK 05000460 PDC 3

..=

j

  • te NRC-EMERGENCY RESPONSE CAPABILITY Page 2 Should you have any questions, please contact Mr. D. W. Coleman, WNP-1. Licensing Manager.

GR G. C. Sorensen, Man g r Regulatory Programs (280)

GCS/GKD/llw cc:

J. B. Martin / NRC Region V G. S. Vissing/ NRC L. S. Rubenstein/ NRC N. S. Reynolds/ BCP&R D. Smithpeter/ BPA J. R. Lewis / BPA i

. ~.

..