_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _

' AVERAGE DAILY LHIT PCHER LEVEL -

DOCKET No. 50 - 277 (MIT PEACH BOTTall LNIT. 2 DATE APRIL 15, 1988 C0t9ANY PHILADELPHIA ELECTRIC COMPANY L. L. MIDOLETON TECl#ticAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (215) 841-6374 MONTH MARCH 1988 DAY AVERAGE DAILY POE R LEVEL DAY AVERAGE DAILY P0HER LEVEL IM4E-E T3 iP94E-NET 1 1

0 17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

0 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

I['/(

8804220040 880331

[l PDR AnOCK 05000277 R

DCD

/.

  • ~

, ' AVERAGE DAILY LNIT PODER LEVEL' DOCKET NO. 5J - 278 UNIT PE!.CH BOTTOM LMIT 3 DATE APRIL 15, 1988 COMPANY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETCH TECINICAL ASSISTANT LICENSING SECTION P4) CLEAR SUPPORT DEPARTMENT TELEPHONE i215) 841-6374 HONTH MARCtl 1988 DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY P0HER LEVEL IP91E M TI

( t91E-NET )

1 0

17 0

2 0

18 0

3 0

19 0

0 0

20 0

5 0

21 0

6 0

22 0

l 7

0 23 0

l l

8 0

24 0

t i

9 0

25 0

l

' 10 0

26 0

11 0

27 0

i 12 0

28 0

h 13 0

29 0

14 0

a 0

15 0

31 0

I i

1 l

_;,_ z..7o.,

-p-OPERATING DATA REPORT c

2 4

w DOCKET NO. 50 - 277 DATE APRIL *,5e 1968 ~

~,< x ColWLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION' i

IEJCLEAR SUPPORT DFPARTMENT TELEPHONE (215) 841-4374 OPERATING STATUS

- 1. tMIT NAPEI PEACH BOTTOM LMIT 2 1 NOTESI.LNIT 2 REPA1HED SHUTD0lN l

l l

2. REPORTING PERIDOI MARCH, 1988 l

WER NRC ^RDER MITH l

i l

3. 8.ICENSED THEllMaL PONERil9ff):

3293 l

RESTART ACTIVITIES l

l l

' 4. HAPEPL/TE RATING (GRO*S 99tE ll.

1152 l

CONTINUING.

l l

l

5. DESIGN ELECTRICAL RATING INET PteE)*

1065 l

l s

l l

6. MAXIPRM 9EPEteABLE CAPACITY (GROSS P9tEli 1098 l

l l

l T. MAXIttJM DEPENDABLT CAPACITY INET t9tE):

1051 l

l

........~.............................

4. If CHANGES OCCUR 7M CAPACITY RATINGC (ITEttS NUPEER 3 THROUGH 71 SINCE LAST REPORTS GIVE REASONSI i

t=

9. PrW R LEVEL TO MtICH RESTRICitDe IF ANY INET t9tF18
10. PJASONS FOR RESTRICTIch3e IF ANY 6

1rtIS MONTH YR-TO-DATE CLMULATIW

.1.

HOURS IN REPORTING PERICO 744 2,184 120456

12. PAftf A 0F HOURS REACTOR 81AS CRITICAL 0

0 74,196.8

13. REACTOR RE7'c ra f SHL.TMN HOURS C.0 0.0 0.0

...........m 14.' HOURS.

-Vii DN-LIF' O.0 0.0 71eP6..A

15. J4!T 4 4 c' '

O.0 0.0 0.0

16. ItPOE# Th

'P W

e a ttet )

0 0

21t.S10,745 4

~ -

NTFD IPtet) 0 0

70.019,230

17. GROSS ELEC TJC(,

iLECTRICAL ENEASY MtERT.TED (19#t1

-4.064 m

-13:127 (7.027.969 e

b PAGd 1 OF 2

.?

y.~__,,e

.,,~,.,,,.m.

s

-~.n

---.m,

,._y

.w

_ _,,. - ~ - _. -,.. -.,,,, _

m-.-

y

9 c

..o OPERATING DATA REPORT (CCHTIMJED)

DOCKET NO. 50 - 277 DATE APRIL 15, 1988 THIS HONTH YR-TO-DATE CIA 9X ATIVE

19. WIT SERYICE FACTOR 0.0 0.0 59,7
20. WIT AVAILASILITY FACTOR 00 0.0 59.7

....e......

21. WIT CAPACITY FACTOR (USING HrA: NET) 0.0 0.0 52.9
22. WIT CAPACITY FACTOR (USINJ OER N6T) 0.0 0.0 52.2
23. WIT FORCED OUTAGE RATE 0.0 0.0 14.6
24. SHUTD0DNS SCHEDULED DVER NEXT 6 HONTHS (TYPE, DATL AND DURATION OF EACHit REFUELING OUTAGE s-
25. IF Sm/TDo m AT END OF REPORT PERIOO, ESTIMATED DATE OF STARTUPI
26. If4ITS IN TES* STATUS (PRIOR TO Cott1ERCIAL DPERATION):

FORECAST ACHIEVED INITIAL CRITICALsTY 09/16/73 INITIAL ELECTRICITY.

02/18/74 CotNERCIAL CPERATION 07/05/74 l

t t

l i

i l

l l

l t

i l

PAGE 2 0F 2 l

O. NEGATIVE VALUE REPORTED FOR Col 5ISTENCY MITH FEDERAL LNERGY MGULATORY CottuSS10N REPORTS.

l r

I l

l*

r l

c.

e OPERATING DATA REPORT -

DOCKET No. 50 - 278 DATE APRIL 15, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPMN L. L. HIDDLETON TECHNICAL-ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (215) 8416374 OPERATING STATUS

1. UNIT NAME: PEACH BOTT0t' UNIT 3 i NOTESI UNIT 3 REMAINID SHUTDODN l

l l

' 2. REPORTING PERI 001 MARCH, 1988 l

LNDER NRC ORDER MITH l

l l

3. LICENSED THERHAL PONERitMTlt 3293 l

REFUEL AND P7PE REPLACEMENT l

l l

4. NAMEPLATE RATING IGROSS t94E )I 1152 l

IN PROGRESS.

l l

l

- 5. DESIGN ELECTRICAL RATING INET 194E) 1065 l

l l

l

6. HAXIttJH DEPENDA8LE CAPACITY IGROSS t94E ) 1098 l

l l

l

7. HAXIHUH DEPENDABLE CAPACITY INET PNE):

1035 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS PAkBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI
5. PONER LEVEL TO NHICH RESTRICTED, IF At# INIT PNEls
10. REASONS FOR RESTRICTIONS, IF ANYI THIS HONTH YR-TO-DATE CUttJLATIVE
11. HOURS IN 'tEPORTING PERIOD 744 2,184 116,352
12. NWBEP OF hCURS REACTOR HAS CRITICAa, 0

0 76,357.4

13. REACTDR RESERVE SHUTD0DN HOURS 0.0 0.0 0.0
10. HOURS GENERATOR ON-Lite 0.0 0.0 73,929.3 6
15. UNIT MMRVE StRITDOFN HOURS 0.0 0.0 00 t
16. GROSS THERMAL. Elf RGY GENERATED (tNHI 0

0 215e278e901

17. GROSS ELECTRICAL INERGY GENERATED ti+4HI O

O 70,611,432

=

-43064 13,127 67,689,028

18. NET ELECTRICAL ENERGY GENERATED IPNH)

PAGE 1 OF 2 i

e

,vv.

o,

g_.

4 OPERATING DATA REPORT ICONTINUED)

DOCKET ND. 50 - 278 DATE APRIL 15, 1988 THIS HONTH VR-TO-DATE CtHJLATIVE i

4

19. lA4IT SERVICE FACTOR 0.0 0.0 63.5
20. LNIT AVAILA81LITY FACTOR 0.0 0.0 63.5
21. UNIT CiPACITY FACTOR (LSING M'C NET) 0.0 0.0 56.2
22. WIT CAPACITY FACTOR IUSINO DER NET) 0.0 0.0 54.6
23. (JNIT FORCED OUTAGE RATE u.0 0.0 13.3
24. SHbf00604S SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATL, AND DURATION OF EACHII INDETERMINATE LNrIL NRC ORDER IS SATISFIED.
25. IF SHUTD0>ed AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP8 to. LNITS IN TEST STATUS (PRIOR TO Cott1ERCIAL OPERATIONlt FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 Cot 91ERCIAL OPERATION 12/23/74 S

I

(

[

PAGE 2 0F 2 I

r a

k

LNIT SHUTDONS AND PCHER REDUCTIONS DOCKET NO. 50 - 277 LA4IT NAME PEACH BOTTON UNIT 2 DATE APRIL 15, 1988 REPORT HONTH HARCH, 1983 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. HIDDLETON TECHNICAL ASSISTANT LICEPGING SECTION NUCLEAR SUPPORT DEPARTHEin TELEPHONE (215) 841-6374 p......,....................-................................................................................................

l l

1 l

l NETHOD OF l LICEtGEE lSYSTENICOMPONENTl CAUGE AfD CORRECTIVE l

I TYPE I DUf1 ATION l RE A00N I SHUTTING DODN l EVENT l CODE I CODE l ACTION TO l DATE l (1)l IHOURSil (2) l REACTOR 43) l REPORT 8 l (4) l

15) l PREVENT RECURRENCE I

I I

l i

I l

l 1

7 l 880301 l S l 744.0 l C l 1

l WA l RC l FUELXX l HRC REQUIRED SHUTDG N.

1 1

I ----. I I

I 1

1 l

l l

l 744.0 l 1

l l

l l

(1)

(2)

(3)

(4)

. FORCEO REASON HETHOD EXHIBIT G - INSTRUCTI0tG

- SCHEDULED A - EQUIPMENT FAILURE IEXPLAIN) 1 - HAPAJAL FOR PREPARATION OF DATA 8. MAINTENANCE OR TEST 2 - ItANUAL SCRAM.

ENTRY SHEETS FOR LICEtGEE C - REFUELING 3 - AUTCHATIC SCRAM.

EVENT REPORT ILER)

D - RECULATORY LISTRICTION 4 - OTHER IEXPLAIN)

FILE IPAJREG-0161)

E - OPERATOR TRAINING + LICEtGE EXAMINATION F - ADMINISTRA11VE 15) 9 - OPTRATI0ttAL ERROR IEXPLAIN)

H

  • OTHERIEXPLAIN)

EXHIBIT I - SAME SOURCE

e. cs e,

r>

k b

UNIT SHUTDODNS AND PCHER REDUCTIONS DOCKET No. 50 - E78 LMIT NAME PEACH BOTTON UNIT 3 DATE APRIL 15, 1968 REPORT MONTH MARCH, 1968 CCHPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL A3SISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TEL': PHONE (E15) 841-6374

'l l

l l

l rlETH00 OF -l LICENSEE lSYSTEHlCOMPONENTI CAUSE AND CORRECTIVE I

l i TYPE l DURATION l RE ASON I S11UTTING DOPH I EVrHT l CODE l CODE l ACTION TO

.I DATE I (1)l IHOURSil ( E l i REACTOR ( 3 ) l REPORT S I 14) 1 (5) l PREVENT RECURRENCE

{

l I

l i

I I

I I

i 7 l 880301 l S l 744.0 i C i 1

i N/A l RC l FUELXX l PIPE REPLACEMENT OUTAGE.

l 1

1 1

l i

I i

l l

l 1 ---- 1 I

i 1

1 I

l l

l 744.0 l l

l l

l l

7 (1)

(E)

(3)

(4)

REASON HETHOD EXHIBIT G - INSTRUCTIONS

[. FORCED

) - SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST E. HAtAJAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVCWF REPORT (LER)

D REGULATORY RESTRICTION 4 - OTHER IEXPLAIN)

FILE INvAEG-0161)

E - OPERATOR TRAINING + LICTHSE EXAMINATIDH F. ADHINISTRATIVE 15)

G. OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAINI EXHIBIT I - SAME SOURCE b

b y

y-

-_,.y

-.-.,y_- -,, _.,

e m,

,.m

<---__r+_sm-v.,

3 - ---

y

MRC Mon'.hly Operations Summary Peach Botion Atomic Power Station March, 1988 UNIT 2 The unit began the report period shut down with the mode switch in the "REFUEL" position and vessel depressurization in progress following the completion of the reactor pressure vessel hydrostatic test. On March 1, the mode switch was placed in the "SHUTDOWN" position, resultily) in a planned scram. Restart activities continued through the end of the report period.

UNIT 3 The unit began the report period shut down for refueling. Major activities during the report period consisted of the removal of major pipes on the Residual Heat Removal System and Reactor Recirculation System p1 ping, and the removal of all ten recirculation inlet (N-2) nozzles and both recirculation outlet (N-1) safe ends. As of the end of the report period, three of the N-2 nozzles and one of the N-1 safe ends had been replaced.

I

Docket No. 50-277 Attachment to Monthly Operating Report for March, 1988 UNIT 2 REFU511NG INFORMATION 1.

Name of facility:

Peach Botton Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 7 completed 3.

Scheduled date for restart following refueling:

Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification charige or other license amendment?

No r

If answer is yes, what, in general, will these be?

Not applicable 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Not c.pplicable 6.

Important licensing considerations r.ssociated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Refueling completed.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

a Core - 764 fuel Assemblies b Fuel Pool - 1734 Fuel Assemblies 58 fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is plannt;, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

I

i Docket No. 50-277 Attachment to Monthly Operating Report for March. 1988 Page 2 l

UNIT 2 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September, 1998 (September 1995, with reserve full coredischarge) l i

Docket No. 50-278 Attachment to Monthly Operating Report for March, 1988 UNIT 3 MEFUE. LING INFORMATION 1.

Name of facility:

Peach Botton Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 7 in progress (Major Pipe Replacement Outage) 3.

Scheduled date for restart following refueling Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel and revise reactor core operating limits. Revisions to reflect modification to the primary system piping.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Reload 7 License Amendment to be submitted May, 1988.

Primary System Piping Am:ndment submitted March 21, 1988.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 0 fuel Assemblies (764 assemblies offloaded during outage)

(b) Fuel Pool - 2260 Fuel Assemblies, 6 Fuel Rods

Docket No. 50-278 Attachment to Monthly Operating Report for March, 1988 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size t,( any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assembiles. This modification began on February 20, 1987. The completion date for ihis modification has been rescheduled foe February, 1989 to accommodate the Unit 3 pipe replacement outage.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

March,1993 (reserve full cort. discharge cannot be accomunodated after the restart following the completion of the October, 1987 refueling outage until the completion of the new fuel racks)

Installation of the new fuel racks will extend the projected date of the last refueling to September, 2000 (March, 1996, with reserve fullcoredischarge)

C PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P,0. BOX 8699 PHILADELPHI A, PA,19101 4215)041 4000 April 15, 1988 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Comission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of March, 1988 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly yours,

)')

C W. M. Alden Director Licensing Section Nuclear Support Division Attachment cc:

W. T. Russell, Administrator, Region I, USNRC T. P. Johnson, PBAPS Resident Inspector S. P. Mangi. Dept. of Envir. Resources P. A. Ross, NRC (2 copies)

R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INP0 Records Center i\\

.