Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 ML20199B6301997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H5991997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216H6071997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Vogtle Electric Generating Plant ML20210K5081997-07-31031 July 1997 Monthly Operating Repts for July 1997 for VEGP ML20140D7301997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Vogtle Electric Generating Plant ML20141D8531997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20137T6191997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Vogtle Electric Generating Plant ML20136G3471997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20134H3481997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20133F6551996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Vogtle Electric Generating Plant,Unit 1 & 2 ML20132B9671996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20134K7361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20128N1541996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20117N1731996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20116J3461996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20115E9821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Vogtle Electric Generating Plant ML20112H6411996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20111B2461996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20101R0251996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Vogtle Electric Generating Plant ML20100R2701996-02-29029 February 1996 Monthly Operating Repts for Feb 1995 for Vogtle Electric Generating Plant ML20100F2071996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20096C3051995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Vogtle Electric Generating Plant,Units 1 & 2 ML20095E0201995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Vogtle Electric Generating Plant ML20094J0741995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Vogtle Electric Generating Plant Units 1 & 2 ML20093F5031995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Vogtle Electric Generating Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
- a -a a _ --
e a
- y. .
GEORGIA POWER .
COMPANY MONTHLY OPERATING DATA REPORT PLANT V0GTLE UNIT 1*
m$
L~
ugsbu*~
- & +
l .
&.W'h&M
- - w.c.; g
_ - - ._ \ w --
~
{ ..
1 -
.A
, . .g.:. - .
-r- -
- Unit 1 only; Unit 2 under construction.
73 ,
=
R
=x88sa ::::::
DCD 2.
st j
c.
y .
-Georgia Power ENCLOSURE 1 TABLE OF CONTENTS PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 HONTHLY OPERATING REPORT March. 1988 NARRATIVE REPORT Page E-1 -
OPERATING DATA REPORT Page E-2 AVERAGE DAILY POWER LEVEL Page E-3 UNIT _SHUTD0HNS AND P0HER REDUCTIONS Page E-4 0080m 700715
NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: APR 5.1986 COMPLETED BY: 5.C. DILWORTH TELEPHONE: (404) 724-8114 x3670 MARCH 1 00:00 UNIT OPERATING AT 100% POWER WITH NO OPERATING PROBLEMS.
MARCH 19 20:30 REACTOR POWER RADIAL TILT DUE TO INOPERABLE N!, OPERATING AT 75%.
MARCH 21 02:06 PLANNED REPLACEMENT OF HEATER DRAIN PUMP 'A' SEAL, OPERATING AT SO%.
MARCH 25 02:04 RAMP TO FULL POWER FROM SEAL REPLACEMENT.
MARCH 27 01:15 REACTOR AT FULL POWER WITH NO OPERATING PROBLEMS, MARCH 28 21:19 RETCRQUED BOLTS ON HEATER DRAIN PUMP 'A' SEAL, OPERATING AT 90%.
MARCH 29 01:08 RETURNED TO FULL POWER.
MARCH 31 24: 00 REACTOR AT 100% POWER WITH NO OPERATING PROBLEMS.
l t-1
si)
OPERATING DATA REPORT DOCKET NO. 50-424 DATE: APR 5,1988 COMPLETED BY S.C. DILWORTH TELEPHONE: (404) 724-8114 x3870 CPERAT!ND STATUS
'i. UNIT NAME: A. W. V06TLE UNIT 1
- 2. AtP0ai PER100: MAR 98 3; LICENSED THERMAL F5WER tKWt): 3411 4 NAMEPLAlf RATINe (4ROSS FWe): 1157
$. DESIGN ELECTRICAL RATING (NET MWe): 1101
- 6. MAXIMUM OEPENDABLE CAPACITY (GROSS MWe): 1122
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1079
- 8. IF CHANGES OCCUR IN C4PACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, 6IVE RIASONS: NONE
- 9. POWER LEVEL TO W41CH RESTRICTED, IF ANY (NET MWe) NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 744 2104 7321
- 12. SUN 8ER OF HOURS REACTOR WAS CRITICAL: 744.0 1620.3 5673.2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE: 744.0 1580.1 5500.7
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSI THERMAL ENCROY GENERATED (MWH): 2456340 5200996 17070044.3
- 17. GROSS ELEC. ENER6Y GENERATED (MWH): 819810 1735340 5919330
- 10. NET ELEC. ENER0Y SENERATED (MWH): 779730 1626460 5547900 l 19. REACTOR SERV!CE FACTOR 100.0% 74.2% 77.5%
- 20. REACTOR AVAILIBILITY FACTOR 100.0% 74.2% 77.5%
- 21. UNIT SERVICE FACTOR: 100.0% 72.3% 75.1%
- 22. UNIT AVAILABILITY FACTOR: 100.0% 72.3% 75.1%
- 23. UNIT CAPACITY FACTOR (USING MDC NET): 97.1% 69.0% 70.3%
- 24. UNIT CAPACITY FACTOR (USING DER NET): 95.2% 67.6% 68.9%
- 25. UNIT FORCED OUTA6E RATE: 0.0% 26.1% 21.4%
1 26. SHUTDOWNS SCHEDULED OVER THE NEXT & MONTHS (TYPE, DATE, AND DURATION OF EACH) REFUELING
! OUTAGE, SEPTEMBER 19, 1990, 50 DAYS.
l 27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPi N/A
- 28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION): N/A i
l i
l l
E-2 2
UNIT 1 AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: APR 5,1988 COMPLETED BY: S. C. D!LWORTH TELEPHONE: (404) 724-8114 x3870 DAY Net MW 1 ......... 1079 2 ......... 1085 3 ......... 1002 4 ......... 1081 5 ......... 1085 6 ......... 1084 7 ......... 1085 B ......... 1092 9 ......... 1088 10 ......... 1092 11 ......... 1092 12 ......... 1084 13 ......... 1088 14 ......... 1082 15 ......... 1089 16 ......... 1094 17 ......... 1098 18 ......... 1095 19 ......... 1083 20 ......... 828 21 ......... 830 22 ......... 886 23 ......... 901 24 ......... 905 25 ......... 1011 26 ......... 1055 27 ......... 1086 28 ......... 1075 29 ......... 1080 30 ......... 1085 31 ......... 1091 l
l i
l l
l E-3 1
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: APR 5,1988 UNIT NAME: V0GTLE UNIT 1 COMPLETED BY: S. C. DILWORTH TELEPHONE: (404) 724-8114 x3870 REPORT MONTH MAR 88 I I I i : E: E 1Y ! ! !
I i l T! I A ! T l LICENSEE SC! ! :
1 1 IY I i$: H : E(ENT l T 0 COMPONENTI CAUSE & CORRECTIVE :
! ! I P : DURATION: 0: 0: REPORT : ED! CODE I ACTION TO 1 1 NO. ! DATE I E !(HOURS) : N : D l NUMBER ! M E l(SUBCODEli PREVENT RECURRENCE :
l-ii:5-lsiirilE-l--ii:I-li's-l-;7I---l-ri-l--is----liiiiicis--------------------l 1 88-6 l MAR 21! SI 95.97 : A : 4 : N/A l TF ! SEAL ISEE BELOW t I ! l ! : : : 1 i !
I l ! !........!...!...!........l.....'.........l.............................!
Fi FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A BREATER THAN 201 B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR
, D-RESULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDIN8 24 HOURS.
l E-OPERATOR TRAINING b LICENSE 5 - LOAD REDUCTION l F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) l 8-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN) 88-5 CAUSE: REACTOR POWER RADIAL TILT CAUSED BY AN INOPERABLE NUCLEAR INSTRUMENTATION CHANNEL (N!-43!. IN ACCORDANCE WITH TECHNICAL SPECIFICATIONS, POWER WAS REDUCED TO 751 CORRECTIVE ACTION: THE POWER SUPPLY FEEDING N!-43 WAS FOUND TO BE INOPERABLE AND WAS REPLACED. THIS REPA!REO THE NI BUT THEN THE PLANT ENTERED A SCHEDULED MAINTENANCE DERATING TO REPA!R A LEAKING SEAL ON THE HEATER DRAIN PUMP "A'.
88-6 CAUSE: MEATER DRAIN PUMP 'A' SEAL WAS LEAK!NG. POWER WAS REDUCED TO Sol TO REPLACE THE SEAL.
CORRECTIVE ACTION: REPLACED HEATER DRAIN PUMP "A" SEAL AND RETURNED FLANT TO FULL POWER.
l I
I E-4
O g'
- j * /Jeorga Power Company
~
m 333 Piedmont Avenue
- g. i Manta, Georga 30308 . .
Terzphone 404 526-6526 Ma. ting Address Post Ofice Box 4545 Manta, Georgia 30302 Georgia Power L.T.Gucws the southem electre system Manager Nuclear Safety and Lcensing SL-4444 0080m X7GJ17-V510 April 15, 1988 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555 PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 HONTHLY OPERATING REPORT Gentlemen:
Enclosed is the Month?y Operating Report for Vogtle Unit 1 for March, 1988. This report is submitted pursuant to the requirements of Technical Specification Section 6.8.1.5.
Sincerely,
&M a L. T. Gucwa JAE/Im
Enclosure:
c: Georoia Power Company Mr. P. D. Rice Mr. G. Bockhold, Jr.
GO-NORMS U. S. Nuclear Regulatory Commission Dr. J. N. Grace, Regional Administrator Hr. J. B. Hopkins, Licensing Project Manager, NRR (2 copies)
Mr. J.-F. Rogge, Senior Resident Inspector-Operations, Vogtle
\\