Special Rept:On 880626,diesel Fire Pump Failed to Start in Response to Valid Test Signal.Caused by Some Connectors Not Firmly Seated.Control Panel Removed & Taken to Maint Shop & All Connectors Reworked to Achieve Positive Connection
ML20151L297
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/13/1988
From: Bradham O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8808030433
Download: ML20151L297 (2)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _

10CFR50.36

. South Carolina Electric & Gas Company git C. Summer Nuclear Station Jenhinsvme. SC 29 CSS SCE&G

- ~.

$$@July 13, 1988 3 g m0: 39 Dr. J. Nelson Grace Regional Administrator U. S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N.W.

Atlarta, Georgia 30323

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Special Report (SPR 88-006)

Dear Dr. Grace:

This Special Report is submitted pursuant to the requirements of Technical Specifications Section 3.7.9, "Fire Suppression System," and Section 6.9.2.

On June 26, 1988, during scheduled surveillance testing, the Diesel Fire Pump failed to start in response to a valid test signal. Recorders were installed at various points to monitor the starting circuitry but repeatability of the failure did not occur. Visual inspection of the control circuit panel identified that some connectors were not seated firmly.

The control panel was removed and taken to the maintenance shop. All connectors were reworked to achieve a positive connection, wiring terminations were verified tight, and the interior was thoroughly cleaned.

The unit was reinstalled and starting of the pump was performed locally, remotely, and by low pressure actuation. All testing was satisfactory and the unit was declared operable July 10, 1988.

Should there be any questions, please call us at your convenience.

Very truly yours,

$fb O. S. Bradham

<d Vice President, Nuclear Operations RJB/OSB: led pc: See Page 2 880803043s eso713 PDR ADOCK 050003P5 N

3 PDC I 0q

Dr. J. Nelson Grace July 14, 1988 Page 2 pc: J. G. Connelly, Jr./0. W. Dixon, Jr./T. C. Nichols, Jr.

D. A. Nauman E. C. Roberts W. A. Williams, Jr.

General Managers L. A. Blue C. A. Price R. B. Clary W. R. Higgins J. R. Proper R. M. Campbell, Jr.

K. E. Nodland J. C. Snelson G. O. Percival R. L. Prevatte J. B. Knotts, Jr.

Marsh & McLennan Document Management Branch INP0 Records Center ANI Library NSRC RTS (SPR 880006)

NPCF F;1e (818.08)