M W M MMW ag; David W. Cockfield Vice President, Nuclear April 12, 1988 Trojan Nuclear Plant.
Docket 50-344 Licenso NPF-1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555
Dear Sir:
Jnter,rity of__ Fire Barriers Your letter of November 13, 1987 expressed concern over the large number of Special Reports regarding nonfunctional fire barriors. This letter describes the corrective actions by Port. lend General Electric (PGE) to uddress this concern.
Application of National Fire Protection Association (NFPA) 80 criteria, in the absence of adequate procedural guidance, resulted in several barriers being noted as nonfunctional for a variuty of minor deviations. Our Nuclear Plant Engineering Department has subsequently established how NFPA 80 criterla are to be applied and confirmed that inost doors with the deviations identified in our previous Specia.1, Reports would romain functional for the duration of the rated fire. Those that would not, were repaired or scheduled for replacement.
The clarified acceptance criteria have been added to our door inspection procedures.
It is recognized that additional management attention is requ'. red in ftre protection activities.
Therefore, to focus attention and accountability, the site fire protection responsibilities are being :onsolidated under one indi-vidual. A Fire Protection Supervisor reporting to the Personnel Protection Manager will be responsible for all onsite fire prevention and protection activities consistent with the Technical Specifications, rh 8804200569 880412 f *I PDR ADOCK 05000344
\\
F DCD m t w secn aw: P vc Cwn 9?N
'. j q.*:
MMMM Document Contro1~ Desk April 12, 1984 Page 2
.\\.
PCE staff fully recogn!se the tarportance of fire barriers. The improved I
inspection criteria will ensure that fire barrier inspections are performed j
s properly.
I Sincerely, h(Of l
c:
Mr. John B. Martin I
Reglonal Administrator, Region V U.S. Nucisar Regulatory Commission Mr. Williar! Dixon State of Oregon Cepartment of "nergy I
-Mr. R. C. Bare NRC Resident Inspector j
I Trojan Nucisar Plant I
i I
I r
o t
i l
2 F
b i
I T
i L
t F
i k
l l
t i
l r
i
._