ML20151H831

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Status of Auxiliary & Fuel Handling Bldgs Decontamination for First Quarter 1988, Addressing Areas Where Tech Spec Surveillances Not Performed Due to ALARA Considerations
ML20151H831
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/14/1988
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
4410-88-L-0062, 4410-88-L-62, NUDOCS 8804200551
Download: ML20151H831 (2)


Text

I l

GPU Nuclear Corporation

.... *. y Nuclear

s=ss48o a

Middletown, Pennsylyania 17057-0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

(717) 948-8461 April 14, 1988 4410-38-L-0062/0050P US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. OPR-73 Docket No. 50-320 Auxiliary and Fuel Handling Buildings Quarterly Decontamination Schedule In response to the NRC Letter dated May 7,1984, the following is the status of Auxiliary and Fuel Handling Buildings Decontamination for the First Quarter of 1988. This update addresses only those areas where Technical Specification surveillances were not being performed due to ALARA considerations.

Seal Injection Cubicle (AX004)

ALARA exemption is currently being taken for Technical Specification Surveillance 4210-SUR-3244.01 (4301-M8), "Containment Integrity Verification." General area dose rates in the cubicle proper range from 50 mR/hr - 800 rrfi/hr with readings as high as 4 R/hr at a distance of one fo0t from one corner of the cubicle.

The heavily encrusted floor area has been scabbled.

Scaffolding and debris removal are completed and follow-up scabbling is also completed.

In addition, a concrete shield slab was poured on the cubicle floor during the First Quarter of 1988. Floor slope correction will continue into the Second Quarter of 1988. The application of grout may eliminate the locked high radiation status of this cubicle. Surface decontamination of the cubicle is scheduled for the Second Quarter of 1988.

I \\

npit N.rine,r~~ ration is a subsidiary of the General Pubhc Utihties Corporation 8804200551 880414 PDR ADOCK 05000320

.n r@c

1:

-Document Control Desk April 14,1988 L.

4410-88-L-0062 i.

Sincerely,

/

V

. Starderfe Director, TMI-2

-DHW/ emf cc: Senior Resident Inspector, TMI - R.' J. Conte Regional Adninistrator, Region W. T. Russell Director, Plant Directorate IV

.J. F. Stolz Systems Engineer, TMI Site - L. H. Thorus l'

l j