Mod 5,providing Incremental Funding,Raising Contract Ceiling & Revising Task 7,to Cooperative Human Reliability Evaluation Program
ML20151H687
Person / Time
Issue date: 04/11/1988
From: Edmonson L, Wiggins E
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), NUS CORP.
To:
Shared Package
ML20151H657 List:
References
CON-FIN-D-1612, CON-NRC-04-86-104, CON-NRC-4-86-104 NUDOCS 8804200475
Download: ML20151H687 (3)


Text

_ . _ _ _ _ _ _ _ _ _ _

9 PAGE OF PAGES

1. CONT RACT IO CODE 4.-

- ' ' AMENDMENT OF SOL ICITATION/ MODIFICATION OF CONTRACT i l, 4

4. REQUISIT 40N/ PURCHASE REQ. NO. S. PROJECT NO. (l/ applicable)
2. AMENOMENT/MOOlFICATION NO. 3. EF FECTIVE DAT E Five (5) 9////// RES-86-104 dtd 12/23/87

" " * " ' "#"*""'"" I rTssuEO ev CODE CODE U.S. Nuclear Regulatory Comission

. Division Of Contracts Washington, D.C. 20555

s. N AME AND ADORE 55 OF CONT RACTOR (No.. street, comary State end EJP Code) y} 9A. AMENOMENT OF SOLICIT ATION NO.

NUS Corporation 910 Clopper Road '^8"'""">

Gaithersburg, lid. 20878-1399 10A. MOOlF ICATION OF CON T R ACT/O R DER NO.

a.

NRC-04-86;10'4 y

loo. DAT ED (SEE ITEM JJ) 4[1[bb CODE lFACluTY CODE r'

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS is extet@d. Is not ex-The abow nuentwed solicitation is amended as set forth in item 14. The hour and date specified f or reaipt of Offers sendid.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, try one of the following rnethods:

(a) By completing items 8 and 15. and returning - copies of the arnendment; (b) By acknowledging receipt of this amendment on cach copy of the of fer submitted; or (c) By separate letter or telegrarn which includes a reference to the solicitation and amendment numbers. FAtLURE OF YOUR ACKNOWLEDG.

MENT TO DE nECEIVED AT THE PLACE DEstGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR ANO DATE sP IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted. such change may t>a rMe by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specifieJ.

12. ACCOUNTING AND APPROPHinTION DAT A (1/ requared)

B&R No.: 601920 FIN No.: D1612 Amount: $2,950

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTR ACTS / ORDERS.

IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

N C ORDER NO M .

6. THE ABOVE NUMDEREO CONTRACT / ORDER 65 MODIFICO TO REFLECT THE ADMiellSTR AT4VE CHANGES (such as chantes de Paying office.

appropriation dele, etc.) SET FORTH IN 1 TEM 14, PUR$UANT TO THE AUTHORITY OF FAR 43.103(b).

C. T HIS SUPPLL MEN T AL AGHELMEN T ($ ENT ERCO INTO PURSU ANT TO AUTHORIT Y OF C 52.243-2, Changes- Cost X

Reimbursement-Alternate 1andmutual-agreementoftheparkiuse es.

O. 0 tutu tspecary tipe of mo+twetson and authority)

X is required to sign this docurnent and return ___7 Copies to the issuing of fiCc.

E. IMPO RTAN T: Contractor b is not.

DESCHIPTION QF AMLNOMENT/MOOlFICATION (Orteni,ed by UCF eecteon headints including solicitetson/ contract sul> ject metter where lee 44ble.)

This modification is issued to expand the scope of work under Task 7; increase the contract ceiling amount; provide incremental funding, and revise the indirect rates. The contract is therefore modified as follows:

1. Paragraph B.2 is modified to read:

Total Estimated Cost . ......... . . ..... $198,674 Fixed Fee . . . . . . . . . . . . . . . . . . . . . . . $ 16,969 Total Estimated Cost-Plus-Fixed-Fee . . . .... . . $215,643 C uttet at provided hereen all termi and Conditions of the document referenced in llem 9A or 10A, as hetetofore changed, remains unchanged and la f ull fosCe

.nd ento.

!$ A. N AML ANO flit.L OF SIGN E R (Type or printf 16A. N AME AND T IT LL OF CON T H AC T ING OF FICLH (Type or aff L. R. Edmonson, Treasurer Elois J. Wiggins k p tL/ lb i sC. Onit s.oNtTi au Unit to st Ar ts O, AMo niC A 1.C. D A -sio rn u

?Oe r t oon

-i.Asa. cONpup'# -

%- 4.e..e.

+ ^-

.nipe.. a. .

w_

.n.,..,..en, J4 ny _ _ _ _ _ _ _ _ _ _ _ _ .

n ., . ,,,c..,...,. e r,,,., .,

52^N ^" '""30'""' "'

3a '"

N5" n eacv' 8804200475 0804h PDR

""""*^

CONTR NRC-04-06-304 ppy

r

.- ,- l NRC-04-86-104 Modification No. 5 Page 2 of 4

2. Under Paragraph C.1.3, Scope of Work, add the following to Task 7: l l

"Task 7 is expanded to increase the HF-RBE methods comparison within the Benchmark study to reaf firm the application of Case No. 2.

Specifically, the increased scope includes :

The use of task analysis results for MAPPS Application to HF-RBE Benchmark f

a.  ;

study case 2. The  ;

b. Submission of a report summarizing the use of MAPPS for Case 2 analysis.

report to be submitted to NUS for review and possibic use in the NUSsummary report on Benchmark. findings in 1988. control to be provided by NRC and NUS.

c. Report review and technical content
3. Under Paragraph C.2, Meetings and Travel, add the following: , ,

"C.2.3 During Task 6, 5 trips shall be scheduled to Is/ra, Italy, not to exceed seven days.

C.2.4 During Task 7, 2 trips shall be scheduled pr to Is/ a, Italy, no to exceed twelve days each; 2 trips to Rockvi le, Maryland, not to exceed one day; 1 trip to San Diego, Cali rnia, not to exceed three days; and 1 trip to San Ofeco C lifornia, not to exceed four days."

4. Under Section F - Deliveries and Performance, add the following under Paragraph F.1.2, Technical Information and Reports:

"(e) Project Task 7 report summarizing the use of,MAPPS Application to HF-RBE Benchmark study case 2." /

5. Under Section G - Contract Administration Data, Paragraph G.1, (

Consideration - Estimated Cost, Fixed Fee and Oblication, is modified t'o I.

read as follows:

"1. It is estimated that the total cost for full performance of this contract will be $215,643, of which the sum of $198,674 represents the estimated reimbursable costs and of which $16,969 represents the fixed fee. ]

The total estimated cost of Task 7 is $50,903.00, of which the sum of $47,150.00 represents the estimated reimbursable costs and of which $3,753.00 represents the fixed fee. This task shall be funded entirely by the U.S. Nuclear Regulatory Commission."

)

w NRC-04-86-104 Modification No. 5 Page 3 of 4

6. Paragraph G.1.2. is revised to read as follows:

- "Total funds currently available for payment and obligated to this contract )

are $202,573.00. The obligated funds are provided as follows: .

NRC - $133,273.00 EPRI - $ 69,300.00

7. Paragraph G.1.3. is revised to read as follows:

"The remaining funds of $13,070.00 will be obligated by EPRI upon availability of funds, by contract mo'dification.

8. Under Section G.2, Overhead /Ceneral and Administrative Rates, add the following -

under B.2.B.:

"Pending the establishment of final general and administrative rates which shall be negotiated based on audit of actual costs, the contractor shall be reimburse _d _

for allowable indirect costs at the following provisional rates:

'~

Period Rate 4/1/86 through 3/2/87 9.38%

3/3/87 through 11/5/87 9.03%

11/6/87 through 3/31/88 10.8%

~)

Issuance of this modification results in the following:

The total amount of the contract is increased by $2,950 from $212,693 to $215,643.

The total estimated cost is increased by $2,749 from $195,925 to $198,674.

4 The total fee is increased by $201 from $16,768 to $16,969.

The amount obligated is increased by $2,950 from $199,623 to $202,573.

All other terms and conditions remain the same.