ML20151H621
| ML20151H621 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/22/1983 |
| From: | Gears G Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8305040704 | |
| Download: ML20151H621 (3) | |
Text
-
l
.it..;
~
s t
g g, w 2.
[,
} APRIL.32 W hf(
m l
t C
4
- s.,
\\
Docket Nos. 50-277
+
0 and 50-278 e
4
(
p FACILITY: Peach Bottom Atomic Pcwer Station, Uni,ts 2 and 3 LICENSEE: Philadelphia Electric Conpa,ny (PECo)
.t
SUBJECT:
SUPMARY OF THE MARCH 23,1%3 MEETINEWITH PECO PERTAINING TO GE HYBRID CONTROL RODS-AND UNIT 3' RELOAD At the request of the NRC staff, PEco and Genertl Electric (GE) provided a technical presentation on GE-Hybrid Control' Rod Assemblies currectly proposed for installation in Peach Bottom, Unit 3.
During this presen-tation, it was indicated by GE that they were also seeking a NRC generic review of the production type Hybrid control rode (Type 1). The NRC staff indicated that they would review and assess the use of the proposed surveillance (Type II) control rods for Unit 3 as part of the,
Unit 3 reloact evaluation; however, a generic review.of the production /
Type 1 Hybrid _ control' rods would not imediately consnence until NRC 4
is' formally requested ty GE and/or PECo to undertake a reviev pf the C prorpsed production type control rods. This item was not fuether
?
discussed and still awaits specific details,from GE/PEco g GE's basic # i e
3 presentation during this meeting was to provide to thesl@C staff m
additional data and information necessary for the staff to unde'rtale its Unit 3 reload evaluation.
s
,se ;,
l-
~-
m z. %,,,,
Gerald E. Gears, Project Manager Operating Reactors Branch #4 l
Division of Licensing.
Enclosure:
s.
~
List of Attendees b,
i 4
i t
8305040704 830422 w,
g' PDR ADOCK 05000277 P
(
ORB #4:DL
}
t rr omcc,..csg..
.i
. 4.g.g...
sua~ = >
om>
..y......
.'.x OFFICI AL R ECOR D COPY u
usa m e -3u m NRC FORM 318 (10-80) NRCM 0240
tj__
I r
i
~
MEETING
SUMMARY
DISTRIBUTION i
Philadelphia Elect /ic, dompa,qy
'I Licensee:
\\
,e g
- Copies also sent to those people on Service (cc) l.i.st. for subject plant (s).
\\
Docket File i
\\
'f NFCPDR y
m
,t L PLR ORSf4 Rdg
't'
<1roject Manager-GGears N
JStolz Glainas I"
Ocensing Assistant-RIngram OELD JHeltenes, AEOD ELJordan, IE
&lTaylor, IE ACRS (10) N NSIC t
NRC Meeting Particicants:
MTokar RMeyer HRichings DFidno ' '
SBSun WBrooks N $
3, f
w,'
(
s e
t i
h n
I w
6 q
,\\
- [/q 1
(N ;
-\\
?
\\
a,,.
t 4
s X
n.-._...
.d.
m__
'i
~. _.
e' ATTENDAt:CE
~
3/23/83
~PEC0/GE/NRC MEETING HYBRID C'dNTROL ROD ASSEMBLY - LTR NAME ORGANIZATION A. N. Tschaeche GE Paul vanDiemen GE J. N. Kass GE L. F. Rubino PECo J.1. Cearley GE NRR/DL Gerry Gears M. Tokar NRR/DSI Ralph Meyer NRR/DSI/CPB Howard Richings NRR/DSI/CPB Daniel Fieno NRR/DSI/CPB Doug McGinnis PECo Clayton R. Ebling PECo William M. Alden PECo Kenneth W.'Brayman GE S. B. Sun NRR/DSI/CPB Walter L. Brooks NRR/DSI/CPB 9
e
+*--.****==m-e e.,
...mm.-,,