ML20151H608

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/88-09 & 50-366/88-09.Encl Withheld
ML20151H608
Person / Time
Site: Hatch  
Issue date: 07/25/1988
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
SL-4922, NUDOCS 8808010380
Download: ML20151H608 (2)


Text

$$? *$XS?e*"

tNcI$U((E!c

(

mtomRDS WeutWmmt

)

v~pwm

( BRMEEIDfMSSAf0ElAMSOf0fBMNI )

6 msieme m m$

(

UP0ll SEPMATOI THl3 PAGE 5 DECONTROLLED 1

eam c.:; n:n.

Georgia Power w.., o,., i..n. e.,.,i,m.ni SL-4922 0363I X7GJ17-H120 July 25, 1988 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES OPR-57, NPF-5 RESE0MSE TO INSEEC110N REPORT 88-09 Gentlemen:

In response to your letter of Harch 29, 1988, and ir, accordance with the provisions of 10 CFR 2.201, Georgia Power Company (GPC) provided (on April 29, 1988) an initial response to the Notice of Violation associated with Violation 88-09-03.

In your letter of May 26, 1988, you denied GPC's rebuttal of the violation.

On June 24 1988, GPC requested that the response to Violation 88-09-03 be delayed untti a meeting was held between GPC and the NRC, GPC was concerned that there was some confusion relative to the status of the Physical Security Plan that would bear upon Violation 88-09-03.

On July 7,1988, GPC and the NRC met and discussed circumstances associated with the violation.

As a result of that reeeting, a formal response to Violation 88-09-03 was to be submitted to the NRC within 30 days of July 7,1988.

A copy of this response is being provided to NRC Region II for review.

In the enclosure, a transcription of the NRC violation precedes GPC's response.

Should you have any questions in this regard, please contact this office at any time.

Sincerely.

PVJ.G M=r w

(

. BARRAMDB BRRIATM.

)-

( DE0buRECOEWSSAFMAMDBBf0NGUDI 3 H. G. Hairston, III Senior Vice President p,

(

UPON SEPMATION THt3 PAGE 5 DGDNfanti m u

g

\\-

gg80jDOCKo3000321 o380 880725 o

PDC

l

(

sAft0UARDS NONmDIl

)

g i set 0suntcafmsArnouantNOMMON }1 L.eorgia Power h i

UPON StMRAfp MS MGE 5 0(00G0010 U. S. Nucitar Regulatory Comission July 25, 1988 Page Two LGB/1g

Enclosure:

Violation 88-09-03 and GPC Response c: Gesigia Power Comoany Mr. H. C. Nix General Manager - Plant Hatch Mr. L. T. G9 cwa, Manager Nuclear Safety and Licensing (w/o enclosure)

GO-NORMS (w/o enclosure)

U. S. Nyslear_Resulatory Comission. Washington. D. C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch lL._S.u Nuclear Regulatory Comission. Region II Dr. J. N. Grace, Regional Administrator Mr. J. E. Henning, Senior Resident Inspector - Hatch (w/o enclosure)

I

{

(

,,$WCuARDSOf0NAMll j

1 03631

( DELM(MTM SMieUAND5 NORMON f

UPON $4MtATM YHl3 NG( 5 0[0pitROLLED 1

.