ML20151H530

From kanterella
Jump to navigation Jump to search
Forwards Rev 21 to Security Plan.Rev Withheld
ML20151H530
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/19/1988
From: Coss H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808010339
Download: ML20151H530 (1)


Text

_ _ _ _ _ - _ _ _ _ _ _ _

B ALTIMORE GASAND ELECTRIC CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 July 19, 1988 Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Calvert Cliffs Security Plan Revision 21 Enclosed is Revision 21 to the Security Plan for Calvert Cliffs Nuclear Power Plant Units 1 and 2.

The changes made to the revisions do not decrease the effectiveness of the Security Plan and, therefore, are being submitted under the provisions 10 CFR 50.54(P).

This revision incorporates the requirements of 10 CFR73 (Final Rule) Retention Periods for Records.

Details of the changes made by this revision have been provided in an enclosure to this letter.

My staff and I are at your disposal should you have any question (s) regarding these changes.

I 9 fl [ &<m H. D. Coss, Jr.

Vice President General Services Division HDC/ Imp Enclosure 53 f

cc:

J. A. Tiernan, Vice President, p

IY Nuclear Energy Division (w/o Enclosure)

W. T. Russell, Region ! Administrator (w/ enclosure)

File No. 14 12 002 14-19 002 This letter is not subject to protective requirements. The attachment / enclosures are subject to Safeguards ee03o

,e3 73 P

"10$2k os8og,37 Information protection in g

accordance with 10CFR73.21

- _ - - - - -