ML20151H488
| ML20151H488 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/12/1988 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Haughney C Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8804200403 | |
| Download: ML20151H488 (1) | |
Text
~'
M y
DCQ e-3 e
4 ai APR 1 2 1988 h
)I
,1 MEMORANDUM FOR: Charles J. Haughney, Chief, Special Inspection Branch Division of Reactor Irwection and Safeguards,.,
Office of Nuclear Reactor Regulation FROM:
Edward n Greenman, Director, Division of Reactor Projects i
Region lII o )
,1 S8dJjcT: f,;/
YOUR PFMW t/TJUM DATED MARCH 29, 1988, CONCERNING THE FERMI-2 MS V CIRCVIT PROBl.EM Region III is in basic agreement with the need to followup on the previously i
proposed design change to the Fermi-2 MSIV circuitry. A Division of Reactor
/,
Safety inspector is scheduled to conduct an on-site inspection in mid MayL, 1988, to determine the adequacy and st;tus of the modification that would ensure that the MSIV closure fsy tion has an adequate seal-in feature such that the valve will not reopen vhthout deliberate operator action.
We believe that the scheduling of this followup inspection is consistent with f,
the significance of the issue as docunen'ed in Region III Division of Reactor
~
Safety inspection report 50-341/87036; that iscwe feel that the circuitry is adequate from a safety standpoint, but agree wd t,he OSTI finding that it has the potential to cause operational problems under certain conditions.
If you have any questions, please contact me on extension (518) or Hub Miller on extension (788).
ve;-ig Nc.i ! 6:
':'""-'9 Edward G. Greenman, Director i
Division :sf Reactor Projects
's cc:
H. J. Miller, RIII
'I J. J. Harrison, RIII R. C. Knop, RIII U
R. N. Gardner, RIII i
/ Z. Falevits, RIII R. W. Cooper II, RIII 7
P. R. Pelke, RIII W. Rogers, SRI Fermi j$$4]@@ $@@yyy T. R. Quay, NRR p
paa
/
\\
i i,
RIII RII RIII Yo6 Inp Cookr d 9-4Fb H
i Kn be
.L EC l
~
a