_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
e E
GPU Nuclear Corporation y)
QQlg7 Post Of fice Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-8461 July 15, 1988 4410-88-L-0113/0050P US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Dear Sirs:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. OPR-73 Docket No. 50-320 Auxiliary and Fuel Handling Buildings Quarterly Decontamination Schedule In response to the NRC Letter dated May 7,1984, the following is the status of Auxiliary and Fuel Handling Buildings Decontamination for the Second Quarter of 1988. This update addresses only those areas where Technical Specification surveillances were not being perforrned due to ALARA considerations.
Seal Injection Cubicle ( AX004)
AL ARA exemption is currently being taken for Technical Specificadon Surveillance 4210-SUR-3244.01 (4301-M8), "Containment Integr.ity Verification."
The heavily encrusted floor area has been scabbled.
Scaffolding and debris removal are completed and follow-up scabbling is also completed.
In addition, a concrete shield slab was poured on the cubicle floor during the First Quarter of 1986. Floor slope correction of the poured concrete shield slab was completed during the Secord Quarter and the concrete shield slab was painted with Keeler and Long epoxy coating materials. Steel stield plates and lead blankets were also installed over the area of the floor immediately around the floor drain. General area dose rates in the cubicle have been substantially reduced ard now range from 100 rnR/hr - 250 rrR/hr.
Additionally, Kelly Vac flushing has reduced smearable surf ace contamination levels in the cubicle from an approximate average of 1,550K dpm to an average of 45CK dpm.
e f
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
'* DocIsrent Control Desk JJ1y 15,1988 4410-88-L-0113 Further contamination reduction is presently being evaluated.
Sincerely,
/
F. R. Standerfer Director, TMI-2 EDS/ emf cc: Senior Resident Inspector, TMI - R. J. Conte Regional Administrator, Region 1 - W. T. Russell Director, Plant Directorate IV - J. F. Stolz Systems Engineer, TMI Site - L. H. Thonus i