Notifies of Completion of Prerequisites for Reactor Criticality & Readiness for Restart.Util Intends to Bring Reactor Critical & Commence Increase to Approx 25% of Rated Power.Prerequisite Items Verified Listed
ML20151G743
Person / Time
Site: Rancho Seco
Issue date: 03/29/1988
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GCA-88-144, NUDOCS 8804200125
Download: ML20151G743 (3)


Text

-

y. . . .

$SMU= nacayeo SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 S Street, P.o. Box 15830, Sacramento CA358521 0,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE' HEART F CALIFORNIA FU U!.C 1 A D 33 GCA 88-144 U. S. Nuclear Regulatory Commission Attn: J. B. Martin, Regional Administrator Region V 1450 Maria Lane, Suite 210 Halnut Creek, CA 94596 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 CERTIFICATION FOR REACTOR CRITICALITY

Dear Mr. Hartin:

The District has completed the prerequisites for reactor criticality and hereby informs you of our readiness for restart of Rancho Seco. Upon receipt of the restart authorization from the NRC, the District intends to bring the reactor critical and commence an increase to approximately 251. of rated power.

In confirming the accomplishment of Operating Procedure B.lA "Control of Plant Heatup and Operating Procedure for Power Escalation Testing" prerequisites, we have verified that:

e Technical Specification and procedural prerequisites for continuing startup beyond hot shutdown have been satisfied (Procedure B.1A, Sections 5.1.15, 5.1.18),

o Procedures needed for continuing startup beyond hot shutdown are available and operators have been trained in their use (5.1.3, 5.1.13),

e Plant staffing meets the Technical Specification and procedural requirements (5.1.22, 5.1.23, 5.1.25), and a The Plant Review Committee (PRC) and the Management Safety Review Committee (HSRC) have provided their review and approval to continue startup beyond hot shutdown (5.1.20, 5.1.21).

G804200125 000329 PDR ADOCK 05000312 i P PDR l{V

- - j ' (.,l RANCHO SECO NUCLEAR GENERATING STATloN D 1444o Twin Cities Road, Herald,'DA 95638 9799;(2o9) 333 2935 J

p- o ,

GCA 88-144 J.B. Martin MAR 2 91933 The AGH Nuclear Power Production, AGM Technical and Administrative Services, Director of Management Systems, Director of Nuclear Quality and I have met with each appropriate department to ensure that all matters such as regulatory and management commitments are closed, paperwork is in proper order, procedures are properly prepared, reviewed and approved and personnel are trained and ready to support reactor criticality and power operation.

To the best of my belief and knowledge, Rancho Seco has met the necessary prerequisites prior to leaving the hot shutdown condition and proceeding with reactor criticality and power operation. Power ascension will be conducted as a minimum in accordance with the attached program.

Please contact me if you have any questions. Members of your staff with questions requiring additional information or clarification may contact Mr. Joe Firlit at (209) 333-2935, extension 4687.

Sincerely,

/ . e G. Carl ndo ni Chief Executive Officer, Nuclear Attachment cc
G. Kalman, NRC, Rockville (w/atch)

A. D'Angelo, NRC, Rancho Seco ( )

F. J. Miraglia, NRR, Rockville ( "

)

State of California On this the;21d day of ///Are4 19 R SS. before me, Judy E. Luna, the undersigned County of Sacramento Notary Public, personally appeared G. Carl Andognini personally known to me to be the person who executed tiie within instrument as Chief Executive Officer, m's [ Nuclear or on behalf of the District f r.MStfcYdea., '

therein named, and acknowledged to me that j uwac co= the District executed it. HITNESS my hand

-~SOM*"2 'dSL and official seal.

Anda b '

tut 6L dotIry's Ngnature '

1 1

1

.l.

)

3 s -

s "

e

. R E

W O

P L

L U

F t

G T s

e =

N I

/ i p

T %s

) T r

N S 2wk d e O E I 9

~5

( l n

n a

I T

A P R

- U N - - ~ -

D O ) S I

%s H S o ew k

1 N ~5 N

( O E M C lf

)

S %s

)

(

6 A 5w 6

k t T

s e X

~5 I S

R ( n w

E I o Y W /[ dt u n

d 1t ahS i O pt A M

P i

) r o

%sk TH I X

0w d O

4 ete  %

~8

(

n n o 0 R ame t y P l

PR i

l a P f

i c )k A t w

/ x )kw i r

C 0

/m.1 .

[( =

i o a 1

o s ** aao o s " s = i

% R# POWER h1t f k

~