Letter Sequence Approval |
---|
|
|
MONTHYEARML20151G4471988-07-20020 July 1988 Responds to 880623 Request for NRR Position on Licensee Review of Inservice Insp Program Changes.Onsite Committee Review of Inservice Insp Program Changes Not Required Except in Unusual Circumstances Such as Code Relief Project stage: Approval 1988-07-20
[Table View] |
|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196F7641999-06-23023 June 1999 Notification of 990707 Meeting with Util in Arlington,Tx to Discuss Results of Recent Maint self-assessment ML20196B5291999-06-15015 June 1999 Notification of Significant Licensee Meeting with Util on 990715 Re Introduction of New Members of Midamerican Energy Co Senior Mgt to NRC Region IV Managers ML20207E6241999-05-28028 May 1999 Notification of 990622 Meeting with Util in Auburn,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Cooper Nuclear Station ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205R6021999-04-16016 April 1999 Notification of 990506 Mgt Meeting with Util in Arlington,Tx to Discuss Rev 3 to Cooper Engineering Improvement Strategy & Implementation of Cooper C/A Program ML20205A4311999-03-22022 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990208-12 ML20205A5671999-03-22022 March 1999 Forwards Exam Rept 50-298/99-301 with as Given Written Exam Administered on 990212 ML20204J0371999-03-19019 March 1999 Notification of 990330 Meeting with Util to Discuss Results of Most Recent NRC Plant Performance Review ML20206U1431999-02-0505 February 1999 Notification of Significant Licensee Meeting with Util on 990224 to Discuss Lessons Learned from Recent Refueling Outage & Status of Cooper Engineering Strategy ML20155E6301998-10-30030 October 1998 Notification of Licensee Meeting with Util on 981217 in Arlington,Tx to Discuss Progress of Cooper Engineering Improvement Strategy ML20237C3461998-08-17017 August 1998 Revised Notification of 980903 Meeting W/Util in Brownville,Ne to Discuss Results of Salp.Meeting Revised to Change Time of SALP Meeting ML20236X8271998-08-0606 August 1998 Notification of Licensee Meeting W/Util on 980821 to Discuss Cooper Engineering Improvement Strategy & Actions to Improve Engineering ML20236X8901998-08-0303 August 1998 Notification of Licensee Meeting W/Util in Brownville,Ne on 980903 to Discuss Results of Systematic Assessment of Licensee Performance ML20217Q2161998-05-0404 May 1998 Notification of Licensee Meeting W/Util on 980518 in Brownville,Ne to Discuss Cooper Engineering Improvement Strategy ML20216J4651998-04-20020 April 1998 Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970502 Request to Revise Plant Quality Assurance Program for Operation Policy Document ML20217B6811998-04-20020 April 1998 Notification of 980504 Meeting W/Util in Arlington,Tx to Provide NRC Reviewers W/Opportunity to Obtain Clarification on Details of Revised Cooper Engineering Improvement Strategy ML20196E4381998-04-13013 April 1998 Discusses Insp Rept 50-298/96-24 Re Review of Instrument Impulse Line Configuration for Various Instruments,Including Drywell Pressure Instruments.Assistance Requested Re Licensee Method for Verifying Status of Subject Valves ML20217B6211998-03-23023 March 1998 Notification of 980327 Meeting W/Util to Discuss Regulatory Perspectives of Plant NUREG-1433, Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-14331998-03-19019 March 1998 Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-1433 ML20216H7581998-03-18018 March 1998 Notification of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee 971222 Responses to NRC 971106 RAI Re ITS Section 3.6, Containment Sys ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy NUREG-1433, Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-14331998-02-0404 February 1998 Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-1433 ML20199F6551998-01-30030 January 1998 Forwards TIA 95-010 Response Re Plant,For Placement in PDR ML20198N2671998-01-15015 January 1998 Notification of 980130 Meeting W/Util in Arlington,Tx to Discuss Lessons Learned from Design Basis Insp,Overview of Plans for Engineering Improvement & Engineering Performance Indicators ML20198Q1881998-01-13013 January 1998 Forwards Nonproprietary Version of Montecello & Cooper Trip Rept to PDR ML20199D0021997-11-17017 November 1997 Notification of 971204 Meeting W/Util in Brownville,Ne for Exit Meeting for NRC Design Insp ML20211J1211997-10-0303 October 1997 Notification of 971017 Predecisional Enforcement Conference W/Nppd in Arlington,Texas to Discuss Apparent Violations in NRC Insp Rept 50-298/97-12 ML20217E1031997-09-25025 September 1997 Notification of 971008 Meeting W/Util in Rockville,Md to Provide Status of Ongoing Plant USAR Rebaselining Project ML20210T4041997-09-0909 September 1997 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970616-20 at Plant,Unit 1 ML20199F6911997-08-14014 August 1997 Forwards SE Accepting Licensee Design of torus-to-reactor Building Vacuum Breakers at Plant ML20198F7971997-08-0707 August 1997 Notification of Significant Licensee Meeting W/Util on 970821 in Brownville,Ne to Discuss Operability Assessments, 10CFR50.59 SEs & Plant Performance Indicators ML20149J0841997-07-23023 July 1997 Notification of 970807 Meeting W/Nppd Industrial Advisory Group (Iag) in Arlington,Texas to Discuss Iag Functions & Roles ML20141H4801997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610-11 Grid Disturbance.Nppd Was Notified & Expressed No Objection to Placement of Info in PDR ML20141H4131997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610 Grid Disturbance.Memo Documents Staff Actions Taken & Planned & to Make Subj Info Publicly Available ML20138E2961997-04-30030 April 1997 Notification of Significant Licensee Meeting W/Util on 970513 to Discuss Engineering ML20137L2591997-04-0101 April 1997 Notification of 970425 Meeting W/Util in Arlington,Tx to Discuss EP Status & Direction ML20137J7171997-04-0101 April 1997 Notification of Predecisional EC on 970401 to Discuss Apparent Failures to Maintain License Basis as Discussed in NRC Insp Repts 50-298/96-24 & 50-298/96-31 ML20135E1511996-12-0404 December 1996 Notification of 961219 Meeting W/Util in Arlington,Tx to Discuss Engineering & Other Plant Challenges ML20134M0551996-11-19019 November 1996 Notification of 961210 Licensee Meeting W/Util in Arlington, Tx to Discuss Emergency Preparedness Status ML20149F6611994-08-0505 August 1994 Notification of Licensee Meeting W/Util on 940812 to Discuss Licensee Response to Confirmatory Action Ltr IR 05000298/19930281994-01-19019 January 1994 Notification of Significant Licensee Meeting W/Util in Arlington,Tx to Discuss Apparent Violations Identified in NRC Insp Rept 50-298/93-28 ML20059L3301993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931123 in Arlington,Tx to Discuss Corrective Action Program Upgrade Status,Overview of Operational Safety Team Insp & Licensee Operational Experience Program ML20059H2531993-11-0404 November 1993 Notification of Significant Licensee Meeting W/Util on 931119 to Discuss Results of Operational Safety Team Insp (Osti) Being Conducted at Plant.Dates of Insp Are 931101-05 & 931115-19 ML20057A8201993-09-0909 September 1993 Notification of 930921 Meeting W/Util in Rockville,Md to Discuss Organizational Changes Designed to Bring About Improved Performance ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128B5271993-01-28028 January 1993 Notification of Significant Licensee Meeting W/Util on 930226 to Discuss QA Audit Issues & Licensee Action Plan in Response to Salp,Nrc Insp Rept 50-298/92-99 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217A9811999-10-30030 October 1999 Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20210F6981999-07-27027 July 1999 Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts ML20196H8491999-06-28028 June 1999 Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 ML20196F7641999-06-23023 June 1999 Notification of 990707 Meeting with Util in Arlington,Tx to Discuss Results of Recent Maint self-assessment ML20196B5291999-06-15015 June 1999 Notification of Significant Licensee Meeting with Util on 990715 Re Introduction of New Members of Midamerican Energy Co Senior Mgt to NRC Region IV Managers ML20207E6241999-05-28028 May 1999 Notification of 990622 Meeting with Util in Auburn,Nebraska to Inform Public of NRC Plans for Implementing Risk Informed Baseline Insp Pilot Program at Cooper Nuclear Station ML20210F7021999-04-30030 April 1999 Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A ML20205R6021999-04-16016 April 1999 Notification of 990506 Mgt Meeting with Util in Arlington,Tx to Discuss Rev 3 to Cooper Engineering Improvement Strategy & Implementation of Cooper C/A Program ML20205A4311999-03-22022 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990208-12 ML20205A5671999-03-22022 March 1999 Forwards Exam Rept 50-298/99-301 with as Given Written Exam Administered on 990212 ML20204J0371999-03-19019 March 1999 Notification of 990330 Meeting with Util to Discuss Results of Most Recent NRC Plant Performance Review ML20206U1431999-02-0505 February 1999 Notification of Significant Licensee Meeting with Util on 990224 to Discuss Lessons Learned from Recent Refueling Outage & Status of Cooper Engineering Strategy ML20155E6301998-10-30030 October 1998 Notification of Licensee Meeting with Util on 981217 in Arlington,Tx to Discuss Progress of Cooper Engineering Improvement Strategy ML20237C3461998-08-17017 August 1998 Revised Notification of 980903 Meeting W/Util in Brownville,Ne to Discuss Results of Salp.Meeting Revised to Change Time of SALP Meeting ML20236X8271998-08-0606 August 1998 Notification of Licensee Meeting W/Util on 980821 to Discuss Cooper Engineering Improvement Strategy & Actions to Improve Engineering ML20236X8901998-08-0303 August 1998 Notification of Licensee Meeting W/Util in Brownville,Ne on 980903 to Discuss Results of Systematic Assessment of Licensee Performance ML20217Q2161998-05-0404 May 1998 Notification of Licensee Meeting W/Util on 980518 in Brownville,Ne to Discuss Cooper Engineering Improvement Strategy ML20216J4651998-04-20020 April 1998 Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970502 Request to Revise Plant Quality Assurance Program for Operation Policy Document ML20217B6811998-04-20020 April 1998 Notification of 980504 Meeting W/Util in Arlington,Tx to Provide NRC Reviewers W/Opportunity to Obtain Clarification on Details of Revised Cooper Engineering Improvement Strategy ML20196E4381998-04-13013 April 1998 Discusses Insp Rept 50-298/96-24 Re Review of Instrument Impulse Line Configuration for Various Instruments,Including Drywell Pressure Instruments.Assistance Requested Re Licensee Method for Verifying Status of Subject Valves ML20217B6211998-03-23023 March 1998 Notification of 980327 Meeting W/Util to Discuss Regulatory Perspectives of Plant NUREG-1433, Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-14331998-03-19019 March 1998 Notification of 980406-07 Meeting W/Util in Rockville,Md to Discuss Outstanding Issues Pertaining to Licensee 970327 Request to Convert Plant TSs to Format Consistent W/Improved Std TSs Presented in NUREG-1433 ML20216H7581998-03-18018 March 1998 Notification of 980326 Meeting W/Util in Rockville,Md to Discuss Licensee 971222 Responses to NRC 971106 RAI Re ITS Section 3.6, Containment Sys ML20203M3791998-02-10010 February 1998 Comments on Draft FY99 Performance Plan Provided to Chairman in Memo from J Funches on 980202 & Circulated as Comsecy 98-003.Requests Verfication of Current Numbers & Explanation of Apparent Discrepancy NUREG-1433, Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-14331998-02-0404 February 1998 Notification of 980212 Meeting W/Util in Rockville,Md to Discuss Status of Staff Review of Licensee 970327 Submittal to Convert Existing TS for Cooper Nuclear Station to Improved Std TS Format of NUREG-1433 ML20199F6551998-01-30030 January 1998 Forwards TIA 95-010 Response Re Plant,For Placement in PDR ML20198N2671998-01-15015 January 1998 Notification of 980130 Meeting W/Util in Arlington,Tx to Discuss Lessons Learned from Design Basis Insp,Overview of Plans for Engineering Improvement & Engineering Performance Indicators ML20198Q1881998-01-13013 January 1998 Forwards Nonproprietary Version of Montecello & Cooper Trip Rept to PDR ML20199D0021997-11-17017 November 1997 Notification of 971204 Meeting W/Util in Brownville,Ne for Exit Meeting for NRC Design Insp ML20211J1211997-10-0303 October 1997 Notification of 971017 Predecisional Enforcement Conference W/Nppd in Arlington,Texas to Discuss Apparent Violations in NRC Insp Rept 50-298/97-12 ML20217E1031997-09-25025 September 1997 Notification of 971008 Meeting W/Util in Rockville,Md to Provide Status of Ongoing Plant USAR Rebaselining Project ML20210T4041997-09-0909 September 1997 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970616-20 at Plant,Unit 1 ML20199F6911997-08-14014 August 1997 Forwards SE Accepting Licensee Design of torus-to-reactor Building Vacuum Breakers at Plant ML20198F7971997-08-0707 August 1997 Notification of Significant Licensee Meeting W/Util on 970821 in Brownville,Ne to Discuss Operability Assessments, 10CFR50.59 SEs & Plant Performance Indicators ML20149J0841997-07-23023 July 1997 Notification of 970807 Meeting W/Nppd Industrial Advisory Group (Iag) in Arlington,Texas to Discuss Iag Functions & Roles ML20141H4801997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610-11 Grid Disturbance.Nppd Was Notified & Expressed No Objection to Placement of Info in PDR ML20141H4131997-07-18018 July 1997 Forwards NPPD Problem Identification Rept & Related Internal Memo Re 970610 Grid Disturbance.Memo Documents Staff Actions Taken & Planned & to Make Subj Info Publicly Available ML20138E2961997-04-30030 April 1997 Notification of Significant Licensee Meeting W/Util on 970513 to Discuss Engineering ML20137L2591997-04-0101 April 1997 Notification of 970425 Meeting W/Util in Arlington,Tx to Discuss EP Status & Direction ML20137J7171997-04-0101 April 1997 Notification of Predecisional EC on 970401 to Discuss Apparent Failures to Maintain License Basis as Discussed in NRC Insp Repts 50-298/96-24 & 50-298/96-31 ML20135E1511996-12-0404 December 1996 Notification of 961219 Meeting W/Util in Arlington,Tx to Discuss Engineering & Other Plant Challenges ML20134M0551996-11-19019 November 1996 Notification of 961210 Licensee Meeting W/Util in Arlington, Tx to Discuss Emergency Preparedness Status ML20149F6611994-08-0505 August 1994 Notification of Licensee Meeting W/Util on 940812 to Discuss Licensee Response to Confirmatory Action Ltr IR 05000298/19930281994-01-19019 January 1994 Notification of Significant Licensee Meeting W/Util in Arlington,Tx to Discuss Apparent Violations Identified in NRC Insp Rept 50-298/93-28 ML20059L3301993-11-10010 November 1993 Notification of Significant Licensee Meeting W/Util on 931123 in Arlington,Tx to Discuss Corrective Action Program Upgrade Status,Overview of Operational Safety Team Insp & Licensee Operational Experience Program ML20059H2531993-11-0404 November 1993 Notification of Significant Licensee Meeting W/Util on 931119 to Discuss Results of Operational Safety Team Insp (Osti) Being Conducted at Plant.Dates of Insp Are 931101-05 & 931115-19 ML20057A8201993-09-0909 September 1993 Notification of 930921 Meeting W/Util in Rockville,Md to Discuss Organizational Changes Designed to Bring About Improved Performance ML20056E4571993-08-0505 August 1993 Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant ML20128B5271993-01-28028 January 1993 Notification of Significant Licensee Meeting W/Util on 930226 to Discuss QA Audit Issues & Licensee Action Plan in Response to Salp,Nrc Insp Rept 50-298/92-99 1999-08-27
[Table view] |
Text
..
July 20,1988=
Docket No. 50-298 MEMORANDUM FOR: James L. Milhoan, Director Division of Reactor Safety Region IV FROM: Dennis M. Crutchfield, Director l Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation l
SUBJECT:
LICENSEE REVIEW OF ISI PROGRAM CHANGES i (TAC N0. 68467) l Your memorandum dated June 23, 1988 requests the NRR position en licensee review of Inservice Inspection (ISI) program changes. The memorandum notes I that the Cooper Nuclear Station Operations Review Committee (SORC) reviews I specific ISI HDE procedures but does not review programmatic changes such as changes to the scope and frequency of ISI inspections. This issue is 1 identified as Unresolved Item 298/88-08-01 in Inspr,ction Report 50-298/88-08. l It is the NRR position that "cach newly created procedure, program or change thereto shall be independently reviewed by an individual knowledgeable in the area affected other than the individual who prepared the procedure, program or procedure change, but who may be from the same organization as the individual /
group which prepared the procedure or procedure change." These words are incorporated into the Technical Specifications of recently licensed facilities, are consistent with para. 5.2.15 of ANSI N18.7-1976/ANS 3.2 (Ref: RG 1.33),
and will noncally be incorporated into the facility's approved QA program. At Cooper, the QA organization provides overview of the ISI program to ensure that the scope, frequency and methods are in accordance with Technical Specifications (Ref: CNS Procedure QAP-1500).
It follows fron the above that onsite comittee (SORC) review of ISI program changes would not be required except in unusual circumstances such as when there is a question of need for Code relief or a potential unresolved safety question.
It is hoped that the above satisfactorily responds to your needs. Please contactWilliamLong(492-1336) if you need additional information.
Dennis Mf*[rutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation DISTRIBUTION Docket Filt i NRC PDR Local PDR PD4 Reading E. Butcher L. Rubenstein J. Calvo P. Hoonan W. Lon F. A11enspach 1 OGC-Rockville E. Jordan B. Grimes ACRS(g)10 PD4 Plant File l R. Hermann A. Gody
- See pt vious concurrences:
PDIV:L DIV:PM* LPEB* EMTB* PDIV:D 9h ADRIVy V DRS j
l PNoonan WLong:kb AGody RHermann JCalvo DCrutchfield j C7/l6/88 07/13/88 07/13/88 07/13/88 LRubensteie 07//s/88 07/4188 \ 07/2d 88 j 8807280367 880720 PDR ADOCK 05000298 M(lc'gi PNU I
G g g'
4
' Docket No. 50-298 MEMORANDUM FOR: James L. Milhoan, Director i
Division of Reactor Safety Region IV FROM: Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
SUBJECT:
LICENSEE REVIEW OF ISI PROGRAM CHAKGES T e c, lp 39 L f Your memorandum dated June 23, 1988 requests the NRR po ition on licensee review of Inservice Inspection (ISI) program changes. The memorandum notes l that the Cooper Nuclear Station Operations Review Consnittee (SORC) reviews l
specific ISI NDE procedures buty/does not review programmatic changes such as <
changes to the scope and frequency of ISI inspections. This issue is identified as Unresolved Item-200/0000-01 in Inspection Report 50-298/88-08. ,
1.*M/W OS ot 1
It is the NRR position that "each newly created procedure, program or change thereto shall be independently reviewed by an individual knowledgeable in the area affected other than the individual who prepared the procedure, program or
, procedure change, but who may be from the same organization as the l individual / group which prepared the procedure or procedure change." These words are incorporated into the Technical Specifications of recently/icensed v facilities, are consistent with para. 5.2.15 of ANSI N18.7-1976/ANS 3.2 (Ref:
RG 1.33), and will nomally be incorporated into the facility's approved QA i program. At Cooper, the OA organization provides overview of R.: T" program I to ensure that the scope, frequency and methods are in accordance with TechnicalSpecifications(Ref: CNSProcedureQAP-1500).
l It follows from the above that onsite cenmittee (50RC) review of ISI program fincluding-essociated-proceduru.) changes would not be required except in x unusual circumstances such as when there is a question of need for Code relief or a potential unresolved safety question.
It is hoped that the above satisfactorily responds to your needs. Please contact William Long (492-1336) if you need additional information. l l
l l i Dennis M. Crutchfield, Director l Division of Reactor Projects - III, IV, V and Special Projects l Office of Nuclear Reactor Regulation !
DISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading E. Butcher L. Rubenstein J. Calvo P. Noonan W. Lnn F. A11enspach i l OGC-Rockville E. Jordan B. Grimes ACRS 10(g ) PD4 olant File l l R. Hertnann A. Gody l
l PDIV:LA A
W-PDIV:PM LPEB W $D4 EMTB %'gPDIV:D ADRIV DRSP PNoonan WLong:kb AGody RHermann JCalvo LRubenstein DCrutchfield t/d/88 7/6 8
/ /88 7//J/88 / /88 / /88 / /88 i i
i
m July '20, .1988
.4 ,
e i Docket No. 50-298 MEMORANDUM FOR: James L. Milhoan, Director Division of Reactor Safety Region IV l l
FROM: Dennis M. Crutchfield, Director l Division of Reactor Projects - III, IV, V and Special Projects l Office of Nuclear Reactor Regulation
SUBJECT:
LICENSEE REVIEW OF ISI PROGRAM CHANGES (TACN0.68467)
Your mem uandum dated June 23, 1988 requests the NRR position en licensee review of Inservice Inspection (ISI) program changes. The memorandum notes that the Cooper Nuclear Station Operations Review Committee (SORC) reviews specific ISI NDE procedures but does not review programatic changes such as changes to the scope and frequency of ISI inspec', ions. This issue is identified as Unresolved Item 298/88-08-01 in Inspection Report 50-298/88-08.
It is the NRR position that "each newly created procedure, program or change thereto shall be independently reviewed by an individual knowledgeable in the area affected other than the individual who prepared the procedure, program or procedure change, but who may be from the same organization as the individual / i group which prepared the procedure or procedure change." These words are incorporated into the Technical Spe'ifications of recently licensed facilities, are consistent with para 5.2.15 of ANSI N18.7-1976/ANS 3.2 (Ref: RG 1.33),
and will nonna11y be incorporated into the facility's approved QA program. At Cooper, the QA organization provides overview of the ISI program to ensure that the scope, frequency and methods are in accordance with Technical Specifications (Ref: CNS Procedure QAP-1500).
It follows fron the above that onsite comittee (SORC) review of ISI program changes would not be required except in unusual circumstances such as when there is a question of need for Code relief or a potential unresolved safety 1 question.
l It is hoped thet the above satisfactorily responds to your needs. Please contactWilliamLong(492-1336) if you need additional information. 1 DennisMf*[rutchfield, Director Division of Reactor Projects - III, i IV, Y and Special Projects l Office of Nuclear Reactor Regulation DISTRIBUTION Docket File NRC PDR Local PDR PD4 Readirg E. Butcher L. Rubenstein J. Calvo P. Noonan We Lon F. Allenspach l OGC-Rockville E. Jordan B. Grimes ACRS(g)10 PD4 Plant File R. Hermann A. Gody
+See pr vious concurrences:
PDIV: DIV:PM* LPEB* EMTB* PDIV:D a
ADRI h
l V DRS PNoonan WLong:kb AGody RHermann JCalvo LRubenstei DCrutchfield 07/)6 /88 07/13/88 07/13/88 07/13/88 07/ff/88 07/M/88 07/st/88 l
. _ ___ _~ _ _ _ _ , _ _ - . . . _ _ _ _ _ . _ _ _ _ _ . _ . . . _
8
[ na ,
o g
o UNITED STATES NUCLEAR REGULATORY COMMISSION
?,
/
....+
Docket No. 50-298 MEMORANDUM FOR: James L. Milhoan, Director Division of Reactor Safety Region IV FROM: Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
SUBJECT:
LICENSEE REVIEW OF ISI PROGRAM CHANGES (TAC NO. 68467)
Your memorandum dated June 23, 1988 requests the NRR position on licensee review of Inservice Inspection (*SI) program changes. The memorandum notes that the Cooper Nuclear Station Operations Review Committee (50RC) reviews specific ISI NDE procedures but does not review programatic changes such as changes to the scope and frequency of ISI inspections. This issue is identified as Unresolved Item 298/88-08-01 in Inspection Report 50-298/88-08.
It is the NRR position that "each newly created procedure, program or change thereto shall be independently reviewed by an individual knowledgeable in the area affected other than the individual who prepared the procedure, program or procedure change, but who may be from the same organization as the individual /
group which prepared the procedure or procedure change." These words are incorporated into the Technical Specifications of recently licensed facilities, are consistent with para. 5.2.15 of ANSI N18.7-1976/ANS 3.2 (Ref: RG 1.33),
', and will nomally be incorporated into the facility's approved QA program. At -
Cooper, the QA organization provides overview of the ISI program to ensure that the scope, frequency and n'ethods are in accordance with Technical Specifications (Ref: CNS Procedure OAP-1500).
It follows from the above that onsite comittee (SORC) review of ISI program changes would not be required except in unusual circumstances such as when there is a question of need for Code relief or a potential unresolved safety question.
It is hoped that the above satisfactorily responds to your needs. Please contact William Long (492-1336) if you need additional infomation.
s Dennis 1. Crutchfield, Director Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
_