ML20151G033
| ML20151G033 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/31/1988 |
| From: | Alden W, Gropp R PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8804190153 | |
| Download: ML20151G033 (6) | |
Text
_ _ _. _ _ - _. _ _ _ _... _ _ _ _ _ _ _ _ - _ _ _
. AVERAGE DAILY WIT P0HER LEVEL DOCKET NO. 50 - 352 WIT LIHERICK UNIT 1
.............== _ _........
DATE APRIL 14, 1988 COMPAl# PHILADELPHIA ELECTRIC COMPANY R. H. GROPP TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-5058 N0fsTH HARCH 1988 DAY AVERAGE DAILY PONER LEVEL DAY AVERAGE DAILY P0HER LEVEL (194E-NET 1
( 794E-NET )
1 1038 17 1036 2
1047 18 1039 3
1014 19 1038 0
1034 20 1034 5
1042 21 1036 6
1032 22 1033 7
1031 23 1032 8
1035 24 975 0
1019 25 961 10 1031 26 980 Al 1034 27 1021 12 1028 28 lut.
13 1027 29 1024 14 1038 30 1005 15 1037 31 993 16 1036 ill 8804190153 880331 PDR ADOCK 05000352 R
F~
OPERATING DATA REPORT DOCKET No. 50 - 352 DATE APRIL 14, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY R. H. GROPP TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR CUPPORT DEPARTMENT TELEPHONE ( 215) 641-5058 OPERATING STATUS
- 1. UNIT NAMES LIHERICK UNIT 1 l NOTESS UNIT 1 EXPERIENCED NO l
l l
- 2. REPORTING PEPIDO:
MARCH, 1988 l
DUTAGES DURING THE l
l l
- 3. LICENSED THERMAL PONER(HHT)I 3293 l
HONTH.
l l
l
- 4. NAHEPLATE RATING (GROSS HHE 18 1138 l
l l
l S. DESIGN ELECTRICAL RATING (NET HHE ):
1055 l
l l
l
- 6. MAXItt.M DEPENDABLE CAPACITY IGROSS PS1E ): 1092 l
l l
l
- 7. MAXIMUH DEPENDABLE CAPACITY INET HHE):
1055 l
l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NLASER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI l
- 9. PCHER LEVEL TO HHICH RESTRICTED, IF ANY INET M4E)I
- 10. REASONS FOR RESTRICTIONS, IF ANY:
I l
THIS HONTH YR-TO-DATE CUHULATIVE l-
- 11. HOURS IN REPORTING PERIOD 744 2,184 18,960 l
[
- 12. NUMBER OF HOURS REACTOR HAS CRITICAL 744.0 2,184.0 15,052.0 l
- 13. REACTDR RESERVE THUTDOHN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR OH-LINE 744.0 2,184.0 14,746.7 I
- 15. lA4IT RESERVE SHUTDOM4 HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (t94H) 2,434,138 7,051,748 45,948,129
- 17. GROSS ELECTRICAL ENERGY GENERATED (HHH) 789,500 2,282,550 Ir 181,960
- 13. NET ELECTR.ICAL ENERGY GENERATED (HHH) 762,209 2,202:179 14,370,016 l
t PAGE 1 OF 2 I
l i
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 352 DATE APRIL 14, 1988 THIS HONTH YR-TO-DATE CUHULATIVE
- 10. UNIT SERVICE FACTOR 100.0 100.0 77.8
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 77.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 97.1 95.6 71.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.1 95.6 71.8
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.2
- 24. SPVTDolfG SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATI0id 0F EACH)
THE UNIT IS SCHEDULED TO BE SHUT DC>ti ON APRIL 8,1988, FOR A THQ HEEK OUTAGE FOR MAIN CONDEtGER TUBE CLEANItG.
- 85. IF SHUTDCefi AT END OF RFPORT PERIOD, ESTINATED DATE OF STARTUPI
- 26. UNITS IN TEST STATUS (PRIOR TO Cott1ERCI AL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY HID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 OF 2
o.
LNIT SHUTDC*NS AND PONER REDUCTIONS DOCKET NO. 50 - 352 LNIT NAME LIMERICK LNIT 1 DATE APRIL 14, 1968 REPORT MONTH MARCH, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY R. H. GROPP TECHNICAL ASSISTANT LICENSING SECTION l
NUCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-5058 i
!w............__............................
j l
l l
l l METHOD OF l LICENSEE ISYSTEMICOMPONENT! CAUSE AND CORRECTIVE
- i. l i TYPE l DURATION l REASON I SHUTTING DODN l EVENT l CODE l CODE I ACTION TO NO.l DATE I (lli ( ROURS )l (2) l REACTOR 83) l REPORT 8 l 14) l (5) l PREVENT RECURRENCE 1 ___.__....__..__...___.__.__._____________.___.__.___._________.._______________........___.__........___.__.............___
g I
I I ----- I I
I I
I I
l l
i 1
1 I
l l
l 1
i i
l (1)
(2)
(3)
(4) 9 - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS i
O - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MA?AJAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER) 0 - REGULA10RY RESTRICTION 4 - OTHER (EXPLAIN)
FILE INUREG-0161')
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE
- 5)
G - OPERAT!M4AL ERROR (EXPLAIN)
H - OTHERIEXPLAIN)
EXHIBIT I - SAME SOURCE I
i r
~
Docket No. 50-352 Attachm3nt to Monthly Operating Report for March 1988 l
Limerick Generating Station Unit 1 March 1 through March 31, 1988 I.
Narrative Summary of Operating Experiences The unit began the report period operating at approximately 100% power.
On March 22, 1988, while starting the Dll Diesel Generator, for a monthly operability run, a loud bang was heard in the generator bay.
The diesel was declared inoperable and an investigation into the origin of the noise was initiated.
Maintenance inspections and testing was performed and no problems were identified.
The operability run of the D11 Diesel Generator was successfully completed and the generator was declared operable.
However, it is suspected that the noise might have occurred if the generator was synchronized slightly out of phase.
On March 25, 1988, reactor power was reduced to approximately 82% due to a weather related decrease in condenser vacuum.
I Full reactor was restored by March 26, 1988.
The report period ended with the unit operating at approximately 97% power due to main turbine backpressure limitations.
On April 8, 1988, Unit 1 is scheduled to be shut down for a two week mini outage for main condenser tube cleaning.
II, Challenges to Main Steam Safety Relief Valves There were no challenges to the Main Steam Safety-Relief valves during the month of March.
1
PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 (2 8 5l 8414000 April 15, 1988 Docket No. 50-352 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Limerick Generating Station Monthly Operating Report Gentlemen:
Enclosed is the monthly operating report for Limerick Unit 1 for the month of March, 1988, forwarded pursuant to Technical Specification 6.9.1.6 Very truly yours O
N L
)
W. M. Alden Director Licensing Section Nuclear Support Division Attachment cca Director, Office of Inspection & Enforcement, USNRC (12 copies)
William T.
Russell, Administrator, Ragion I, USNRC 1
T. J. Kenny, USNRC Senior Resident Inspector Mr. David E.
Ney, PA Dept. of Envir. Resources Mr.
P. A. Ross, NRC (2 copies)
INPO Records Center i
$i Y
.-