Monthly Operating Rept for Mar 1988
ML20151G010
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/31/1988
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8804190144
Download: ML20151G010 (9)


Text

\\

. c JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE SitNARY OF OPERATIONS threb, 1988 During the nr> nth of thrch, there was one unit shutdown which occurred on Bhrch 26, 1988, and initiated the Cycle 8 - 9 refueling outage.

The following major safety-related nninterance was perfonned in the month of Bhrch:

1. Inspected and repaired the reactor trip breakers and by-pass treakers per NRC Bulletin 88-01.
2. Rep. aced the bolts in the coupling of the 1C charging pump.
3. Completed the overhaul of the IC service water pump.
4. Perfonned miscellaneous corrective and preventive maintenarce on the diesel generators.

l l

8804190144 880331 l

/

PDR ADOCK 05000348 R

DCD

OPEPATING DM REPORT DOCKET NO.

50-348 DM 4/4/88 COMPLETED BY J. D. Woodard TELEPfKNE (205)899-5156 OPERATI2Ki S*MIt3S Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Tieporting }eriod:

March, 1988

1) Cumulative data sinca 3, Licensed Wermal Power (Et):

2,652 12-1-77, date of

4. Nameplate Rating (Gross We):

860 consnercial operation

5. Design Electrical Rating (Net Me): 829
6. Maximum Dependable Capacity (Gross We):

852.6

7. Maximum Dependable Capacity (Net Me):

812.6

8. If Changes Occur in Capacity Ratings (Items Number 3 2 rough T Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A mis Month Yr-to-Date Cumulative

11. Hours In Reporting Periort 744 2,184 90,576
12. Number Of Hours Reactor Was Critical 600.8 2,040.8 67,257.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 600.1 2,040.1 65,865.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross hermal Energy Generated (WH) 1 581,648 V O,491 167,823,610
17. Gross Electrical Energy Generated ( WH)

~ 514,706 1,763,232

~5T 930,170

18. Net Electrical Energy Generated ( WH) 486,388 _ _ _

1,673,430

,2,626

19. Unit Service Factor 80.7 93.4 72.7
20. Unit Availability Factor 80.7 93.4_

72.7

21. Unit Capacity Factor (Usinty MDC Net) 80.5 94.3 69.7
22. Unit Capacity Factor (Using DER Net) 78 T 92.4 67.7
23. Unit Forced Outage Rate 0.0 0.0 9.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of EachTi N/A
25. If Shut Down At End Of Report Period, Estimated Date of Startup:

5/9/88

26. Units In Test Status (Prior to Conunercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/06M7 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 00PMERCIAL OPERATICN 12/01/77 12/01/77 Form 2/34

DOCKET NO.

50-348 UNIT 1

DATE April 5, 1988 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MCemi March D%Y AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

(?9fe-Net)

()tfe-Net) 1 823 17 826 2

821 18 823 3

819 19 822 4

819 20 822 5

823 21 821 6

822 22 818 7

822 23 817 8

819 24 815 9

819 25 656 10 823 26 0

11 823 27 0

12 819 28 0

13 818 29 0

14 822 30 0

15 826 31 0

16 827 l

i INSTRUCTICNS l

on this format, list the average daily unit power level in Mie-Nat for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

a UNIT SEUTDOWNS AND POWER REDUCTIONS DOCIET NO.

50-344

~

UNIT NAME J. M. FARLEY - UNIT 1 -

DATE APRIL 4, 1988 CORPLETED BY J.

D. WOODARD REPORT MONTN MARCN TELE N (205)a99-5156 I

I I

I I

I MErNOD Or i LxCENsEE I I

I CAUSE s CORRECrIvE I

l l

l l DURATION l l SNUTTING l EVENT l SYSTEM l COMPONENT l

ACTION TO l

lW0.

l DATE l TYPE l (NOURS) l REASON l DOWN REACTOR l REPORT 9 l CODE l CODE l

PREVENT RECURRENCE l

l 1

1 I

I I

I I

I I

I l001 l 880326 lS l143.9 lC l

1 l N/A l N/A l N/A l Unit was taken off line for the Cycle 8-9 l

1 1

I I

I I

I I

I l r=fuelins +=tase-1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

1 I

i i

l I

i l

I I

I I

I I

i i

l i

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

4 I

I I

I I

I I

I I

I l

I I

I I

I I

I I

I I

i l

l 1

1 I

I I

I I

I I

I l

l l

l l

l l

l l

l l

l I

I I

I i

l i

i l

i I

I I

I I

I I

I I

I I

l I

I I

I I

I l

l l

l l

~)

i I

I I

I I

I I

I I

I l

i I

I I

I I

I I

I I

I I

I I

I I

I l

l l

l I

I I

I I

I I

I l

l I

I I

I I

I I

I I

I I

I F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 5-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (12R) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161) i E-Operator Training & License Examination F-Administrative

$Exhibit I -Same Source G-Operational Error (Explain)

(9/77)

N-Other (Explain)

M Rxa W

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE S11 NARY OF OPERATIONS March, 1988 During the month of March, there was one unit shutdown which occurred on March 26,1988, and initiated the Cycle 8 - 9 refueling outage.

The following major safety-related maintenance was performed in the month of March:

1. Inspected and repaired the reactor trip breakers ard by-pass breakers per NRC Bulletin 88-01.
2. Replaced the bolts in the coupling of the 10 charging puup.
3. Cmpleted the overhaul of the IC service water pump.
4. Performed miscellaneous corrective and preventive maintenance on the diesel generators.

s e

l l

i

r' OPERATING DPGA REPORT DOCKET No. 50-348 DM1C 4/4/88 OMPIEll!D BY J. D. Woodard

'I1tLEPHONE (205)899-5156 OPERATING STMUS Notes

1. Unit Name:

Joseph M. Farley - Unit 1

2. Reporting Period:

March, 1988

1) Cumulative data since
3. Licensed W ermal Power ( M t):

2,652 12-1-77, date of

4. Nameplate Rating (Grost me):

860 connercial operation

5. Design Electrical Rating (Net me): 829
6. Maximum Dependable Capacity (Gross Me):

852.6

7. Maximum Dependable Capacity (Net me):

812.6

~

8. If Changes occur la Capacity Ratings (Items Number 3 2 rough 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net Ne):

N/A

10. Reasons For Restrictions, If Any:

N/A 21s Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 2,184 90,576
12. Number Of Hours Reactor Was Critical 600.8 2,040.8 67,257.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0
14. Hours Generator On-Line 600.1 2,040.1 65,865.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0

~

16. Gross h ermal Energy Generated (%H) 1,581,648 5,400,491 167,823,810
17. Gross Electrical Energy Generated (SH) 514,706 1,763,232 53,930,770
18. Net Electrical Energy Generated (MH) 486,388 1,673,430 50,842,626
19. Unit Service Factor 80.7 93.4 72.7
20. Unit Availability Factor 80.7 93.4 72.7 j
21. Unit Capacity Factor (Using MDC Net) 80.5 94.3 69.7

~

22. Unit Capacity Factor (Using DER Net) 78.9 92.4 67.7
23. Unit Forced Outage Rate 0.0 0.0 9.4
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup:

5/9/88

26. Units In Test Status (Prior to Connercial Operation):

Forecast Achieved INITIAL CRITICALITY 08/t)6/77 08/09/77 l

INITIAL ELECTRICITY 08/20/77 08/18/77 i

03MERCIAL OPERATI N 12/01 /17 12/01/77

{

\\

rorm 2/34 L

DOCKrr NO.

50-348 IJNIT 1

MTE April 5,1988 COMPLETED BY J. D. Woodard TELEPHONE (205)899-5156 MCNTH March MY AVERAGE MILY POWER LEVEL DAY AVERAGE MILY POWER LEVEL (Mie-Net)

( Me-Net) 1 823 17 826 2

821 18 823 3

819 19 822 4

819 20 822 5

823 21 821 6

822 22 818 7

822 23 817 8

819 24 815 9

819 25 656 10 823 26 0

11 823 27 0

12 819 28 0

13 818 29 0

14 822 30 0

15 826 31 0

16 827 INSTS:UCTICNS on this format, list the average daily unit power level in We-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

a UNIT SNUTDOWNS AND POWER REDUCTIONS DOCRET NO.

50-348 UNIT NAME J. M. FARLET - UNIT 1 DATE APRIL 4, 1988 CORPLETED BY J. D. WOODMtD REPORT NONTH MARCE TE12PNONE (2051899-5156 I

I I

I I

I nEr=Oo Or i LICENSEE l l

l CAUSE CO RECTIvE l

l l

l l DURATION l l SNUTTING l EVENT l SYSTEM l CORPOWENT l

ACTION TO l

lNO.

l DATE l TYPE l (BOURS) l REASOE l DOWN REACTOR l REPORT 9 l CODE l CODE l

PLETENT RECURRENCE l

1 1

I i

1 I

I I

I I

I l001 l 480326 l3 l143.9 lC l

1 l N/A l N/A l N/A l Unit was takes off line for the Cycle S-9 l

1 I

I I

I I

I I

I I r.fuelin,..ta,..

I I

I I

I I

I I

I I

I l

l I

I I

I I

I I

I l

l I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I l

I I

I I

I I

I I

I I

I I

I I

I I

I I

I 1 I

I I

I I

I I

I I

l i

I I

I I

I I

I I

I I

I I

I I

I I

I l

i I

I I

I I

I l

l l

1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

l i

I I

I I

I I

l 1

1 I

I I

I I

I I

I I

F: Forced Reason:

Me*hed:

Exhibit G-Instructions 3: Scheduled A-Equipment railure (Emplain) 1-Manual for Preparation of Data B-Maintenance er Test 2-Manual Scram.

Entry Sheets for Licensee 4

C-Refueling 3-Automatic Scram.

Event Report (IAR) File (NURES-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative Exhibit I -Same Source G-Operational Error (Explain)

(0/"M )

R-Other (Explain)

M Rxa M

Alzbima Power Company -

p 600 North 18th Strzet Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 m

R. P. Mcdonald Senior Vice President O O@O bWCI' the southem elatric system April 11, 1988 Docket No. 50-348 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.

20555-Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the March 1988 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very truly, Q.

.l R. P. Mcdonald RPM /JGSimab/1.6 Attachments xc Dr. J. N. Grace

.