Monthly Operating Rept for Mar 1988
ML20151G006
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/31/1988
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8804190141
Download: ML20151G006 (9)


Text

. _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

JOSETil bl. FARI.ET NLCLEAR PIANT UNIT 2 NARIMTIVE S11 MARY OF OPERATIONS thrch, 1988 During the ax> nth of thtrh, there were no unit shutdowns or significant power ruiuctions.

The following nnjor safety-related unintenance was perforwxt in the nonth of thrch:

1.

Perforwxl naintenance on the 2A p>st-accident hydrogen analyzer to correct a flow oscillation problem.

2.

Replaced the 2E service water punp.

3.

Replaced the #3 river water punp.

4.

Performed miscellaneous corrective arxl preventive nainterance on the diesel generators.

l[

8804190141 880331 PDH ADOCK 05000364 R

DCD

OPERATING DMR REPORT DOCKET No.

50-364 DME 4/4/B8 COMPLETED BY J. D. Woodard

'IELEPHGE (205)899-5156 OPERATING STMUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

2. Reporting Period:

March, 1988

1) Cumulative data since
3. Licensed Wermal Power (Mt):

2,652 7-30-81, date of

4. Nameplate Rating (Gross me):

860 commercial operation

5. Design Electrical Rating (Net W e): 829
6. Maximum Dependable Capacity (Gross We):

863.8

7. Maximum Dependable Capacity (Net We):

822.8

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A Wis Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744 2,184 58,489
12. Number Of Hours Reactor Was Critical 744.0 2,184.0_

55,077.9

13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 744.0 2,184.0 49,432.6
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Wermal Energy Generated ( WH) 1,973,062 1,917,152

_41,120,368 5,751,493 125,094,765

17. Gross Electrical Energy Generated (WH) 656,162
18. Net Electrical Energy Generated (WH) 7 25,996 1,827,862 38,979,600
19. Unit Service Factor 100.0 100.0 84.5
20. Unit Availability ractor 100.0 100.0 84.5
21. Unit Capacity ractor (Using MDC Net) 102.3 101.7 81.7
22. Unit capacity Factor (Using DER Net) 101.5 101.0 80.4
23. Unit Forced Outage Rate 0.0 0.0 5.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECIRICITY 05/24/81 05/25/81 COMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30

UNIT SNUTDEMes AND POWER REDoCTIoss DoCERT Wo.54-144 UNIT RhfE J.

M. FAR12T - WIT 2 DhTE ArtIL 4, 1988 CDNFLETED Br J. D. WooOARD REPoET NoIfTE MARCE TE12PWosE (2451899-5156 I

I I

I I

I aEv= = or i Lzc==EE I

I I

cAusE 6 co==EcrzvE I

I I

I I DomATron i I snurrx.a i EvEnr i srsrEn I con o Enr i

Actron so I,

luo.

I n=TE I Tri.* I (nwas)

I mEAso 2 g,,,,,,c,,,3 g,,,,,,, g c,,,4 y c

,s

,,,,,,,,,c,,,,,c, I

I I

I I

I I

I I

I I

IrwEmE IwEmE no I wrr IsuvTmums los srcur-Irxem 7 ro Em imEmerromsIDon2=a IT=E nowr= or I namn.

I I

I I

I I

I I

I I

I I

I I

I I

I i

I i

i I

I i

l I

i i

l i

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

i i

I I

I I

I I

I i

l 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

l i

l i

i i

i I

I I

I I

I I

I I

I I

I I

I I

i l

i I

i i

I i

l i

1 i

l I

i l

I i

l i

i i

i l

I I

i i

l i

l I

I I

i i

i i

l I

i i

l i

i i

l i

l i

l i

i l

i i

i i

l i

i i

l I

i i

i i

i i

l I

i i

i i

i l

i i

i l

i i

i Fr Forced messear Methods Exhibit G-Instructions Sr scheduled A-Equipment Failure (Esplain) 1-Manuel for Preparaties of Data B-Malatemance er Test 2-amanal scrae.

Entry sheets for Licensee C-sefueling 3-Antanatic scran.

Event Report (IER) File (WuREG-D-segulatory Restriction 4-Other (Emplaia) 0161)

E-operator Training & License Emaalaation F-Administrative Exhibit I -same source G-operational Error (Empiala)

(9/77)

M-Other (Emplala)

M Rxm W

DOCKET NO.

50-364 LNIT 2

DAM April 5, 1988 COMPLE1ED BY J. D. Woodard MLEPHONE (205)899-5156 MONIH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Itfe-Net)

(PMe-Net) 1 845 17 848 2

841 18 844 3

837 19 845 4

838 20 844 5

842 21 844 6

842 22 843 7

841 23 841 8

837 24 836 9

837 25 837 10 842 26 839 11 841 27 845 12 839 28 845 13 842 29 839 14 846 30 836 15 847 31 835 16 847 INS 11t0CTICNS On this format, list the average daily unit power level in 7tfe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

d 9

JOSEMI M. FARLEY NUCLEAR PLANT

?

UNIT 2 i

NARRATIVE SitNARY OF OPDMTIONS t

i Mamb, 1988 c

1 During the month of Hamb, there were no unit shutdowns or signifloant i

power reductions.

l

'!he following major safety-related maintenance was perfonned in the month of Namh:

1.

Perfonned maintenance on the 2A post-aocident hydrogen analyzer to correct a flow oscillation probim.

l 2.

Replaced the 2E service water pump.

3.

Replaced the #3 river water ptmp.

4.

Performed miscellaneous corrective arxl preventive maintenance on the diesel generators.

i e

i

?

i I

(

1 i

h i

l i

t 1

i i

I i

i r

l

OPERATING DAM REPORT DOCKET PC.

50-364 DME 4/4/88 OCMPIEIED Bf J. D. Woodard

'tEI2PIDE (205)899-5156 OPERATING STMUS Notes

1. Unit Name:

Joseph M. Farley - Unit 2

3. Reporting Period:

March, 1988

1) Cumulative data since
3. Licensed h ermal Power (PNt):

2,652 7-30-81, date of

4. Nameplate Rating (Gross fWe):

BR comercial operation

5. Design Electrical Rating (Net )We): 829
6. Maximum Dependable Capacity (Gross fMe):

863.8

7. Maximum Dependable Capacity (Net !We):

822.8

8. If Changes Occur in capacity Ratings (Items Number 3 2hrough 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net PNe):

N/A

10. Reasons For Restrictions, If Any:

N/A his Month Yr-to-Date Cumm11ative

11. Hours In Reporting Period 744 2,184 58,489
12. Number Of Hours Reactor Was Critical 744.0 2,184.0_

55,077.9

13. Reactor Reserve Shutdown Hour.s 0.0 0.0 138.0
14. Hours Generator On-Line 744.0 2,184.0_

49,432.6

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross hermal Energy Generated (tkH) 1,973,062 5,751,493 125,094,765 656 1,917,152 41,120,368
17. Gross Electrical Energy Generated (!bH)

Y,162

18. Net Electrical Energy GenR1ted (lWH) 996 1,827,862 38,979,600
19. Unit Service Factor 100.0 100.0 TCF
20. Unit Availability Factor 100.0 100.0 84.5
21. Unit Capacity Factor (Using MDC Net) 102.3 101.7 81.7
22. Unit Capacity Factor (Using DER Net) 101.5 10 7 80.4
23. Unit Forced Outage Rate 0.0 0.0 5.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Ea&):

N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup N/A
26. Units In Test Status (Prior to Comercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL E!2CTRICITY 05/24/81 D_5/25/81 03MERCIAL OPERATICN 08/01/81 07/30/81 Form 2/30

- nn3ET No., 50-364 s

UNIT 2

DAM April 5, 1988 e

COMPL1r1TD BY J. D. Woodard

'ITLEPHCNE (205)899-5156 NCamt March DAY AVElWi'. D ULY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (M4e-Net)

(PHe-Net) 1 845 17 848 2

841 18 844 3

837 19 845 4

838 20 844 5

842 21 844 6

842 22 843 7

841 23 841 8

837 24 836 9

837 25 837 10 842 26 839 11 841 27 845 12 839 28 845 13 842 29 839 14 846 30 836 15 847 31 835 l

l 16 847 INS 30CTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

Form 13/21

e

,. i UNIT $NUTDouns AarD POWE3 REDUCTIONS DOCKET 50.

so-364 UNIT EASE J.

M. FARLET - UNIT 2]

DATE APRIL 4, 1,89 COMPLETED BY J.

D. IEDORARD REramt nonce ahmC=

TEI.Er o E (2.s).,,-s154 I

I I

I I

1 "ErnoD or i trcE=SEE I i

l CwSE Co=RECrIvE I

I I

I I D. RATION i I S=UrTIma 1 ETEnr i SrSTEn 1 COneo.E.T I

ACTION TO I

lWO.

j DATE l TTFE l (NOURS) l REASON l DOWN REACTOR l REPORT $ l CODE l CODE l

PREVENT RECURRENCE l

1 I

I I

I I

I I

I l

lTWERE lWERE 30 l UurIT lSNUTDouns lOR SIGNI-lFICANT POWER l REDUCTIONS lDURING lTNE MONTW OF l RARCE.

l l

l 1

1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

i 1

1 I

I I

I I

I I

I i

l I

i i

1 1

1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

i I

i i

I i

i i

i i

l i

I I

i l

I I

i i

i i

i l

i i

i i

l I

i l

i I

I I

I I

i 1

1 I

I I

I I

I I

I I

I I

I I

I i

1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I

'Methed:

Eahibit G-Instructions F: Forced Reason St Scheduled A-Eguipment Failure (Emplain) 1-Rorreal for Preparatica of Data B-staintemence er Test 2-Mrmeal Scree.

Entry Sheets for Licensee C-aefueling 3-Antoastic Scree.

Event Report (LER) File (NWREG-4 D-Regulatory Restriction 4-other (Emplain) 0161)

E + rates Tralaing & License Emaaimation F-Administrative Enhibit I -Samo source G-Operational Error (Emplain) l (9/77)

E-other (Empleta) l l

l TDI Pbm 1,/2 v

e'*

Attema Power Comp:ny 600 North 18th Strast Post orfee B3x 2641 Dermingham. Alabema 35291-0400 Telephone 205 2501835 Li"?fle%Len, Alabama Power the soutten ehcrc system April 11, 1988 7

Docket No. 50-364 1

U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.

20555 Joseph M. rarley Nuclear Plant Unit 2 Monthly operating Data Report 1

Attached are two (2) copies of the March 1988 Monthly operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very truly, k.k. l$

~ '"p l

R. P. Mcdonald RPNVJGSimab/1.6 Attachments xc:

Dr. J. N. Grace I

.