Informs of Necessity to Delay Transmittals of 10CFR71 (Tp 410-1) & 10CFR34 (Tp 813-1) Revisions & Publication of Draft QA Guide for Spent Fuel,High Level Waste & Pu Shipping Packages (Tp 020-4).Revised Schedule Provided
ML20151E603
Person / Time
Issue date: 02/23/1981
From: Malaro J
NRC OFFICE OF STANDARDS DEVELOPMENT
To: Rosalyn Jones
NRC OFFICE OF STANDARDS DEVELOPMENT
References
RTR-REGGD-7.010, TASK-OS, TASK-TP-020-4, TASK-TP-20-4, TASK-TP-813-1 NUDOCS 8104060446
Download: ML20151E603 (2)


Text

. .

) "O -

h . ) g y TlilS DOCUMENT CONTAINS FEB 2 31981 POOR QUAUTY PAGES

'T'PP/JIDilP FOP: Pelph J. Jones, Assistant Director for 'faterial Safety Standards TP09: Jares C. Palaro, Chief Transportation and I'roduct Standards Franct

'tlPJECT:

, TPSP SES W lF It has been necessary to delay transmittal to the FCC of tur regulatier.s and publication of one draft guide for coment listed in my SES perfcrmance coals contract. Thnse delays are dim orir arily tc last minute chanycs renucsted by "f 'I r, .

Part 71 Pevision fievisions to " art 71 to provide corpatability with I AU reculations (Tr r.lt-1) was scheduled to be transmitteri te the tro 1.y February Ed,1M1 for publication as a final rule. t'cwever, i"" in their second round of counts en the final rule esked for substantive chenyes ubich could not he acccmedated without reru'lication as propo e-J rulomat inc. Since these regulation chant es are dcsicned to provide cor.patability with 1973 chanc;es in the ifIA role and since r J the rrornsed cl'aners were not related tn ItEA corpataHlity, I felt that further substantial delay required t,y reput licatien as a proposed rulerakin'; for public conrent was unacceptabic.

Follounn cytensive discussions eith I"",9 we have resolved nest of cor dif f erences.

Teveral ujor issues ucre resolved t'y acreeinc tFat changes unrelated to IAEA compatability would he the sebject of a separate rulerdire action.

In addition the office of Adrinistration has requested najor forrat and ucrdint channes in Part 71 to cevnly eith f xecutive Order 12t'ed (plain i nclish).

At a result transnittal of tFe final rule vill be delayed until April 20,1T1. l l

Thorn are still a 'w issues we unre not able to resolve with ""';5. If they cennot be resolved I proresc to forward the rule to the Lf C uith a noncenturrence f ro"' '"'S e .

r art N Pevision Proretad reculations on cennral desien and rerformance recuirerents for radiography {1  ;

exposure devices (TP 10-1) was scheduled to be transmitted to the E00 by i yd)

January 31, IM 1 for rutlication as a draft rule. Doucver, """ was late in co;r enting on the draft rule and then asked for substantive changes.

810.4 0 6 0 W(p i

" 'c ' > ...... ... ....... .. .... ............. .. ..... ... ... . ... . ............ ..... .............. ................ .... ........... ........

O ATE k Nac ronu ais iio,eoi nuc* "

OFFICIAL RECORD COPY o uwo woo _m m

d S , i l - ,

FEB 2 31961

-7 Although we had no objectior to enst of tPc chantes, we felt it occessary to allow the Agree::.cnt States an opportunity to cc.w.cnt since the resultini; draf t rule was now substantially different frem the draft we had discussed with their representatives in October. In addition f"'55 has requested industry coment0 en the revised draft aisc we new have to preparc an additional analysis of the ,

effect of this proposed rule en small business in accordance with the Per,ulatory Flexibility Act.

It now appears that the Mrecimr.t States have f o substantive probic:.m. with the revised rule. Industry ccurents are still comins in but apreer faveraMe.

Assun.inr, that we are able to cet definitive cuidance on bow to cyply with the Regulatory flexit,ility Act in the next few wechs I expect to transnit the draft rule-to the EDn Ly March 31, 10^1.

Q.f.. Guide A draft guide on a graded apprmth to parte;c cuality assurance fer spent fuel .

Htt.' and Pluteniuw Shipping Packages (TP-E-4) us scheduled tc t:0 published by February 'S , ifGl. ?MS concurred in the draf t guide en Levetter EJ , lWC, The concurrence wes conditioned on some editcrial changes which were incorporated by tbc FC Technical Editing Staff. l'owever, on Februcry 17,1(J.1 P:GS refused to concur in publication of the guide and have requested extensive f.iodification This will recuire nentines uith t'!.S and If te reurite tbc guidt in a nonner setisfactory to the three offices. I estitcte this will deley put lication of the guide until mid April,1m1 ar.suring the Sp Technical Editint. Staff can give us priority treatrent on the revised cuide.

James C. Malaro, Chief DISTRIBUTION Transportation & Product Standards RGSmith Branch GAArlotto Office of Standards Development JCMalaro SD CENTRAL FILE SD ALPHA FILE TPSB READ TPSB SUBJ SD TASK N0. TP-410-1 o"'co .LPSB:

  • * ~ "' 4 JMala< 9,,teg.. , ,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,, , ,,,, ,,,,,,,,,,, ,,, .. ,, ,,,,, ,,,,,,,, ,,

2/z 81 un> .. . .. ...... ..... .... ........ ....... ............ ..................... ..................... . . . . . . . . . . . . . . . . . . . ..................

ge rosu aia no.comucu o"o OFFICIAL RECORD COPY _ " "*-"'

~

_ .