wey h
/
r<&
i o
UNITED STATES
,g
[,
g NUCLEAR REGULATORY COMMISSION o
n WASHINGTON, D. C 20555
\\...../
APR 0 61988 MEMORANDUM FOR:
James E. Richardson, Assistcnt Director for Engineering Division of Engineering & Systems Technology FROM:
Conrad E. McCracken, Chief Chemical Engineering Branch Division of Engineering & Systems Technology
SUBJECT:
SUMMARY
OF MEETING WITH NUMARC, EPRI, AND INP0 ON INDUSTRY STATUS OF EROSION / CORROSION On March 17, 1988 representatifes of the Nuclear Management and Resource Council (NUMARC) provided a briefing on industry efforts to implement a program to address erosion / corrosion. The meeting attendees are listed in.
The viewgraphs presented by NUMARC are provided as Enclosure 2 and the individual plant erosion / corrosion data base is Enclosure 3.
Based on the NUMARC data,112 of 113 plants have comitted to implement an erosion / corrosion program for single-phase piping by October 1988. One new BWR is scheduled for examination during the spring 1989 refueling. However, they may have a short maintenance outage prior to October 1988 and will inspect at that time if it's not critical path. As of early 1988, fif ty-four plants have completed inspections.
Components were replaced in 19 of these plants due to single-phase erosion / corrosion. Only one CWR replaced components, demonstrating that the problem is more extensive for PWRs.
For the 19 plants replacing components; 10 replaced more than five components and 9 replaced fewer than five components.
The staff indicated that industry efforts to ensure the initial inspection at all plants was appreciated. However, to reach closure of this issue assurances are needed that all plants have systematically addressed the issue of two-phase erosion / corrosion and have procedurally implemented long term programs for single-phase and two-phase piping systems. To address these concerns, NUMARC is supporting EPRI in the development of a computer based program for two-phase erosion / corrosion. This program is similar to the single-phase program and scheduled for completion by EPRI during the fall of 1988. The issue of a long term program is being addressed by INP0 S0WR-87-3 which recomends long term inspection programs for two-phase and single-phase piping.
The staff stated that 10 plants will be visited prior to the end of FY 1988 to
(
assess the effectiveness of industry programs. The future staff actions to
~
h,h;d ~
gMem in%C 0
t o.
i J. Richardson
-2 t
achieve closure of this issue will incorporate the results from the site visits.
Original signed by F. Witt for Conrad E. McCracken, Chief Chemical Engineering Branch Division of Engineering & Systens Technology
Enclosures:
As stated 1
cc: 'NRC Participants 3
J. Sniezek C. Serpan P..Wu
Contact:
P. Wu, x20826 i
t DISTRIBUTION,
Central File's NRC PDR ECEB R/F ECEB S/F i
P. Wu C. McCracken
!I J
i t
i 0FC :ECEB: DEST
- ECEB: DEST t
lNAME:PWu:p4,/jg..:..g.p3v.g...:............:............:............:............:...........
.....:...y gr
- CMcCracWn" :
I
' DATE :04/ J' /88
- 04/ 5"/88 i
0FFICIAL RECORD COPY 1
l
^
ENCLOSURE 1 NAME
_0RGANIZATION Conrad McCracken NRR/ DEST Roger Huston NUMARC Tricia Beliveau NUMARC Bill Rasin NUMARC W. L. Stewart VA Power J. O. Eastwcod VA Power Joe Hopenfeld NRC/RES Earl J. Brown NRC/AE0D T. Chan NRR/DRSP B. Chexal EPRI Gary Vine EPRI Rep to NUMARC J. P. Fersyth INPO C. D. Sellers NRC/ENTB NRC/RES Al Taboada Eve Fotopoulos Serch Licensing, Bechtel Lynn Connor Doc-Search Associates Mike Schoppman Florida Power & Light Co.
Mark Beaumont Westinghouse-Rockville H. L. Brammer NRC/NRR/ILRB Tim Hartin NRC/NRR/ADT Larry Shao NRC/NRR/ DEST
ENCLOSURE 2 NUMARC L.
l t
1 I
i DISCUSSION OF NUMARC SINGLE-PHASE EROSION / CORROSION SURVEY RESULTS l
l MARCH 17, 1988 i
i.
f a
l 4
l
'I I
i I
I.
- NUMARC-SINGLE-PHASE EROSION / CORROSION BACKGROUND o
SURRY FEEDWATER PIPE RUPTURE DECEMBER 1986 4
o INP0 SIGNIFICANT OPERATING EVENT REPORT 87-3 MARCH 1987 o
FORMATION OF NUMARC SINGLE-PHASE EROSION / CORROSION WORKING GROUP MARCH 1987 o
NRC BRIEFING ON PLANS AND "CHEC" CODE, MAY 1987 o
RELEASE OF NUMARC GUIDELINES JUNE 1987 i
o RELEASE OF EPRI COMPUTER CODE, CllEC j
REY. O, JULY 1987 REY. 1, DECEMBER 1987 REY. 2, FEBRUARY 1988 - RELEASED TO NRC l
HARCH 17, 1988 i
s
-- ---.~-.
- NUMARC EROSION / CORROSION PROGRAM GUIDELINES i
INITIAL INSPECTION SAMPLE o
SELECT 10 MOST SUSCEPTIBLE LOCATIONS o
SELECT 5 ADDITIONAL LOCATIONS SAMPLE EXPANSION i
o IF INITIAL COMPONENT FOUND BELOW ACCEPTANCE CRITERIA, INSPECT SIMILAR FITTINGS INSPECTION f
o UT o
RT 4
ACCEPTANCE CRITERIA o
TN0M - WEAR > CODE ALLOWABLE MINIMUM WALL AT THE END OF NEXT REFUELING OUTAGE o
10% HARGIN (TIME MARGIN)
PROGRAM FOLLOW-UP l
0 GENERAL INSPECTION RESULTS THR0llGH INP0 l
NETWORK o
ONG0ING INP0 PLANT EVALUATIONS dEGINNING IN 1987 o
FUTURE INSPECTIONS BASED ON PREDICTED WEAR RATES i
MARCH 17, 1988 I
N U M A R C EROSION / CORROSION SURVEY RESULTS o
45 0F THE 53 UTILITIES INDICATED ADOPTION OF NUMARC PROGRAM o
95 0F THE 113 UNITS HAVE COMPLETED AN ANALYSI:
TO IDENTIFY THE 15 MOST SUSCEPTIBLE LOCATIONS o
54 0F THE 113 UNITS HAVE COMPLETED AN INSPECTION AS OF JANUARY 1,1988 o
22 0F THE REMAINING 60 UNITS HAVE PERFORMED A PARTIAL, INSPECTION o
9 0F THE 54 UNITS REPLACED 5 OR FEWER COMPONENTS 1
o 10 0F THE 54 UNITS REPLACED MORE THAN 5 COMPONENTS l
{
l MARCH 17, 1988 l
l
-v,--,-w,x
,www m.
ww
.-w w-wnww-.-v.
.m
- NUMARC-s.
EROSION / CORROSION SURVEY ASSESSMENT INITIAL ASSFSSMENT REVEALED INCONSISTENT INTERPRETATION OF "AD0PTION OF NUMARC GUIDELINES" o
AREAS OF CONFUSION o
PRE NUMARC PROGRAMS o
CHEC VERSUS EQUIVALENT ENGINEERING ANALYSIS o
ACCEPTANCE CRITERIA o
SCHEDULE CRITERIA O
t i
l l
l MARCH 17, 1988
\\
- NUMARC a.
i EROSION / CORROSION ASSESSMENT o
ADDITIONAL INFORMATION o
REVIEWED SELECTED BULLETIN 87-01 RESPONSES o
CONTACTED DESIGNATED UTILITY REPRESENTATIVE i
o VERIFIED BULLETIN RESPONSE o
CLARIFIED SURVEY RESPONSE o
PROVIDED INSIGHT l
l i
MARCH 17, 1988
l.
- NUMARC EROSION / CORROSION SURVEY ASSESSMENT IDENTIFIED TRENDS o
39 0F THE 75 PWRs (52%) HAVE COMPLETED INSPECTIONS o
18 0F THE 39 INSPECTED PWRs (46%) REPLACED COMPONENTS DUE TO SINGLE-PHASE EROSION / CORROSION l
o 15 0F THE 38 BWRs (40%) HAVE COMPLETED INSPECTIONS o
10F THE 15 INSPECTED BWRs (7%) REPLACED COMPONENTS DUE TO SINGLE-PHASE EROSION / CORROSION MARCH 17, 1988
[
- NUMARC EROSION / CORROSION SURVEY ASSESSMENT o
ACTIONS HAVE BEEN TAKEN OR ARE IN PROGRESS i
AT ALL U.S. NUCLEAR UNITS o
112 UNITS HAVE HET THE INTENT OF THE NUMARC l
GUIDELINES o
1 UNIT HAS NOT HET THE INTENT DUE TO l
INSPECTION SCHEDULE t
l
\\
i
)
i
)
l 1
l l
MARCH 17, 1988 r
N U M A R C EROSION / CORROSION SURVEY ASSESSHENT MEETING THE INTENT OF THE NUMARC GUIDELINES; OTHER CONSIDERATIONS F0VHD ACCEPTABLE o
AN OLDER SISTER UNIT CONDUCTED AN INSPECTION l
BY OCTOBER '88 o
INSPECTIONS CONDUCTED WITHIN TWO YEARS OF COMMERCIAL OPERATION o
A UNIT IN EXTENDED SHUTDOWN WILL CONDUCT AN INSPECTION BEFORE RESTART o
PRE-COMMERCIAL REACTORS FOR WHICH AN INSPECTION WILL BE PERFORMED BEFORE STARTUP l
FROM ITS FIRST REFUELING HARCH 17, 1988 l
- NUMARC--
EROSION CORROSION SURVEY ASSESSMENT MEETING THE INTENT OF THE NUHARC GUIDELINES l
o ANALYSIS CONDUCTED TO ASSESS THE SUSCEPTI-BILITY OF THE PLANT TO SINGLE-PHASE EROSION / CORROSION o
IDENTIFICATION OF RANKING 0F COMPONENTS BY ANALYSIS METHOD o
ACCEPTANCE CRITERIA WAS AT LEAST AS CONSERVATIVE AS SPECIFIED IN THE GUIDELINES o
AN INITIAL INSPECTION ENCOMPASSING AT LEAST 15 LOCATIONS WILL BE CONDUCTED BY OCTOBER '88 HARCH 17, 1988
ENCLOSURE 3 BASE NUMARC SINGLE-PHASE E00SION/ CORROSION DATA 9-Mar-48 NpMBER Rw ADOPTED IDENTIFIED ANALYSIS PERFORMCD COMPONENTS TYPE NUMARC 15 UNACCEPTABLE NDE REPLACED PROGRAM LOCATIONS COMPONENTS INSPECTION O
no yes n/a yes O
1 PWR yes yes 2
PWR yes yes Oct-88
- O 3
PWR yes no n/a O
4 PWR yes yes yes yes Mar-88 w/r no O
5 BWR yes yes yes no 04 6
BWR no yes 7
PWR no yes n/a yes O
no Yes 8
PWR yes yes Jun-88
- w/r no 9
BWR no yes 1 RF w/r no 0
10 PWR yes yes yes 11 BWR yes yes yes 0
12 PWR yes yes yes yes 26 13 PWR no yes n/a yes 0
>yesOct-88
no yes 16 BWR no yes Mar-88 w/r w/a 17 PWR yes no Oct-88 w/r no O
in PWR yes yes yes no 14 19 BWR yes yes n/a ves 20 PWR no yes Jun-88 w/r no O
21 PWR yes yes yes no 16 22 BWR yes yes yes 23 PWR no yes yes 24 PWR yes no n/a SP O
Jun-88
no yes 26 27 BWR yes yes n/a yes 28 PWR no yes 1 RF w/r no 01 29 PWR yes yes n/a ves 30 PWR yes yes 1 RF w/r w/a 31 PWR no no Oct-88
34 PWR yes yes yes yes O
no yes 35 PWR yes yes 1 RF w/r no O
36 PWR yes yes n/a yes 04 37 BWR yes yes n/a yes O
38 PWR yes yes yes 39 PWR yes yes yes Jun-88 w/r no 40 BWR yes yes Jun-88 w/r no O
41 BWR yes yes ves no 42 PWR yes yes Jun-86 w/r no O
43 BWR no yes yes no 44 BWR yes yes PTR w/r 45 BWR yes no w/a Jun-88 w/r no 01 46 PWC yes yes yes 47 BWR yes yes yes Mar-88 w/r no 45 48 PWR no yes yes 49 PWR no yes yes 1 RF w/r w/a O
SO BWR no no 51 PWR yes yes yes yes 05 S2 PWR yes yes yes yes Oct-68 w/r w/a w/r 53 BWR yes yes w/a SP S4 BWR no no Oct-88
- O S5 PWR no yes yes Oct-88 w/r no O
S6 PWR yes yes yes no 57 PWR yes yes Jun-88 w/r w/a S5 S8 PWR yes no 59 PWR no yes yes yes w/n 1 RF w/r 03 60 PWR no no w/a yes O
61 PWR yes yes yes no 62 PWR yes yes Oct-88 w/r w/a 63 PWR no no 1 RF w/r w/a 64 BWR yes w/s Oct-88
- O no 65 PWR no no Oct-8S w/r no O
66 BWR no yes yes no 67 WWR yes yes PTR w/r w/a no Mar-88 w/r 68 BWR yes no 69 PWR yes yes Oct-88
- O no 70 PWR yes yes Jun-88
- w/r no 73 PWR no yes PTR O
74 PWR yes yes yes
09-Mar-88 NUMARC SINGLE-PNASE GROCION/ CORROSION DATA BASE CUMBER Rx ADOPTED IDENTIFIED ANALYGIS PERFORMED COMPONENTS TYPE NUMAnC 15 UNACLE? TABLE NDE REPLACED PROGRAM LOCATIONS COMPONENTS INSPECTION 75 BWR yes yes yes yes O
76 SWR yes yes no Jun-88 w/r 77 PWR yes yes yes yes 05 78 PWR no no w/a Oct-88
85 BWR yes yes no Mar-88 w/r 86 BWR yrs yes no yes O
87 PWR yew yes no yes O
88 BWR yes yes no Oct-88
- O 89 PWR yes yes n/a yes O
90 BWR yes yes no yes O
91 SWR yes no w/a PTR w/r 92 PWR yes yes ves PTR 08 93 PWR no yes yes Oct-88
- O 94 PWR yes yes yes yes
>20 95 BWR yes yes yes Jun-88 w/r 96 BWR no yes no yes O
97 PWR yes yes no yes O
98 PWR no yes n/a Oct-88
- O 99 PWR yes no w/a Oct-88
- O 100 PWR yes yes no yes 0
101 PWR yes yes yes Mar-88 w/r 102 PWR yes yes no yes 0
103 PWR no yes yes yes 12 104 PWR yes yes n/a Mar-88 w/r 105 PWR yes yes yes yes 20 106 PWR yes yes no yes 0
107 BWR yes yes no Mar-88 w/r 108 PWR yes yes no Mar-88 w/r 109 BWR no yes no Jun-88 e w/r 110 BWR yes yes no yes 0
111 PWR yes yes yes yes 0
112 BWR no no w/a Jun-88 w/r 113 PWR yes yes yes yes 02 1 RF = by first refueling datoo = had performed a partial inspection shortly after the Sunny event N/A o not applicable, analysis used did not have a predictive element PTR o prior to refueling SP o sister plant o/o o waiting for analysis c/r o waiting for results l