ML20151D880
| ML20151D880 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/11/1988 |
| From: | Quay T Office of Nuclear Reactor Regulation |
| To: | Knop D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8804140488 | |
| Download: ML20151D880 (2) | |
Text
_
April 11, 1988 I
1 Note To:
Dick Knop, Section Chief, f
Section IB Reaction Projects, Region III i
From:
Theodore Quay, Project Manager Project Directorate III-1 l
DivisionofReactorProjects-III,IV,V
& Special Projects i
Office of Nuclear Reactor Regulations f
SUBJECT:
DETROIT EDISON COMPANY LETTER OF DECEMBER 27, 1985 Theodore Quay, the Fermi-2 Project Manager, was questioned by Paul Pelke l
regarding NRC's views concerning a letter dated December 27, 1985, from Detroit Edison Company (DECO) to Mr. James Keppler of Region III.
In this letter, DECO
}
notified Region III of their inte'nt to remove the moisture-sensitive tape leak
[
detection system using a 50.59 review that was based on NRC Branch Technical 4
Positions ASB3-1 and MEB 3-1.
NRR has reviewed the letter.
In our SER dated July 1981, page 3-11, the staff-concluded that "the methodologies that were used for the identification, design, and analysis of piping systems where postulated breaks may occur constitute an acceptable design basis..."
The approach taken by Deco is i
i consistent with that corclusion, and NRR finds the deletion of the j
moisture-sensitive tape system acceptable, j
t I
ccbL b
^$
Theodore Quay, Project Manager Pro ect Directorate III.
Div sion of Reactor Projects - III, IV, V
& Special Projs. cts 3
j Office of Nuclear Reactor Regulations I
cc: Martin Virgilio Paul Pelke, Region III j
Jarad Wermiel i
- See previous concurrence j
j PD31:DRSP PD31:DRSP NRR/SPLB i
TQUAY*
MVIRGILI JWERMIEL*
j 04/11/88 04/n/88 04/11/88 j
DISTRLBUTION uvuar tILL EJORDAN PD31' PLANT GRAY JPARTLOW j
NRC & LOCAL PDRs ACRS (10) l i
GHOLAHAN
{
RINGRAM l
TQUAY l
OGC i
Q4140488 880411 R ADOCK 05000341 i
M
)
1
1 Note To:
Dick Knop, Section Chief, Section 18 Reaction Projects, Region III From:
Theodore Quay, Project Manager Project Directorate 111-1 Division of Reactor Projects -III, IV, V
& Special Projects Office of Nuclear Reactor Regulations
SUBJECT:
DETROIT EDIS0N COMPANY LETTER OF DECEMBER 27, 1985 Theodore Quay, the Fermi-2 Project Manager, was questioned by Paul Pelke regarding NRC's views concerning a letter dated December 27, 1985, from Detroit Edison Company (DECO) to Mr. James Keppler of Region III.
In this letter, DECO notified Region III of their intent to remove the moisture-sensitive tape leak detection system using a 50.59 review that was based on NRC Branch Technical Positions ASB3-1 and MEB 3-1.
NRR has reviewed the letter.
In our SER dated July 1981, page 3-11, the staff concluded that "the methodologies that were used for the identification, design, and analysis of piping systems where postulated breaks may occur constitute an acceptable design basis..."
The approach taken by DECO is consistent with that conclusion, and NRR finds the deletion of the moisture-sensitive tape system acceptable.
Sincerely, huclew 0 "J
Theodore Quay, Project Manager 3
Project Directorate III-1 l
Division of Reactor Projects - III, IV, V
& Special Projects Office of Nuclear Reactor Regulations e.c : Martin Virgilio Paul Pelke, Region III Jarad Wermiel M
N PD31:DRSP PD31:DRSP I NRRfSPLB TQUAY MVIRGILIO JWERMIEL 4/ p /88
+/ u /88 4/ // /88 DISTRIBUTION DOCKET FILE ~
EJORDAN PD31 PLANT GRAY JPARTLOW NRC & LOCAL PDRs ACRS (10)
GHOLAHAN RINGRAM TQUAY OGC