Forwards Rept of Findings Re Disposal Site at Clive,Ut for Salt Lake City Umtrap.W/O Encl
ML20151D840
Person / Time
Issue date: 06/28/1988
From: Hawkins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Arthur W
ENERGY, DEPT. OF
References
REF-WM-41 NUDOCS 8807250258
Download: ML20151D840 (2)


Text

- _ _ _ _ _ _ _ _ - _ _ _ _ .

DISTRIBUTION r- Docket File WM-41

<PDR/DCSf-D8angart, RIV WM-41/TT0/88/06/28/0 T01sen EHawkins DGillen, LLOB TJohnson, LLTB JUN 2 81988 MFliegel, LLOB BJagannath, LLTB LLO Branch, LLWM URF0:TTO RCPD UT

Docket No. WM-41 URF0 r/f l

l W. John Arthur, III, Project Manager i

Uranium Mill Tailings Project Office U.S. Department of Enerfy Albuquerque Operations Office P.O. Box 5400 Albuquerque, New Mexico 87115

Dear Mr. Arthur:

This letter is in regard to the disposal site at Clive, Utah, for the Salt Lake City UMTRA Project. On June 9,1988, the Uranium Recovery Field Office (URFO) conducted an onsite construction inspection at the Clive property. Enclosed with this letter is the report detailing our findings.

Additionally, we noted aspects of the project where problems still remain with the construction. A summary of our concerns is as follows:

Records indicate that radon barrier r.aterial was not placed at RAP moisture specifications.

Frequency of rock gradation testing was not recorded.

Riprap on pile top was rutted.

Riprap on side slopes exhibited fines in several areas.

Armored ditches exhibit uneven placement and may not have adequate thickness.

Issue from previous site review has not been resolved.

l I 1.

OFC : -

88o725o258 880620  :  :  :

.................. WASTE PDR pg -----:------------:----------- :-----------

NAME :  : Wri-41 .  : - -

DATE :88/06/28  :  :  :  :  :  :

2 o WM-41/rf0/88/06/28/0 JUN 281988 From the-items addressed above, it is evident that the NRC has some concerns about the construction activities at the Clive disposal site.

We would recommend that these issues be resolved as soon as possible to prevent any program delays or disruptions.

Sincerely, is Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office Region IV

Enclosure:

As stated 0FC : URF0  : UR #  :  :  :  :

, .............. .......... .L : ............--...............--......:------ --.-:-. --...-.-

EHawkins :  :  :  :  :

NAME : T01sen/_1v i - DATE :88/06/28  : Go T2 :  :  :  :  :

I

.