Provides Info Re TVA Schedule for Responding to Items Re Emergency Response Capability,Per Rev 2 to Reg Guide 1.97. TVA Will Provide NRC W/Response to Addl Info Requested on 870511 by 881030
ML20151D214
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/15/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8807250013
Download: ML20151D214 (3)


Text

j*l 9A '. ,

. 7

\.

TENNESSEE VALLEY AUTHORITY

' CHATTANOOGA. TENNESSCE 374o1 4 SN 157B Lookout Place JUL 151988 U.S. Nuclear Regulatory Comission

'ATTH: . Document Control Desk Washington,~D.C. .20555

' Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee. Valley Authority ) 50-328 T' SEQUOYAH NUCLEAR PLANT (SQN) - EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO REGULATORY GUIDE (RG) 1.97, REVIS10N . 2

References:

'1. l.etter from TVA to NRC dated March 15, 1982, regarding compliance with RG 1.97

2. Letter from NRC to TVA dated May 11, 1987, "Emergency Response Capability - Conformance to Regulatory Gulde 1.97, Rev. 2 (TAC 51133/51134)"

This letter provides information relating to TVA's schedule for responding to those items in reference 2 in which NRC needed further information. This request for additional information is for exceptions to RG 1.97, which TVA submitted to NRC in reference 1.

Revisions to the information provided to NRC in reference 1 have become necessary because the Westinghouse Owners Group (WOG) has made revisions to the generic Emergency. Operability Procedures (EOPs) since the time reference 1 was submitted. These EOPs define the RG 1.97, type A, variable celections.

TVA has revised its type A variable list and is currently in the process of

~

revising and/or issuing the design basis calculations for postaccident monitoring (PAM). These calculations define the licensing position TVA will fotvard to NRC.

Based on the current schedules for completion of this work, TVA will provide NRC with a response to additional information requested in referencu 2 by October 30, 1988. This responso will also contain justifications for any deviations to RG 1.97 with respect to PAM.

The commitment made by this letter is included in the enclosure. If there are any questions regarding the information provided by this letter, please telephone Barry A. Kimsey at (615) 870-6847.

Very truly yours, TENN SS'E VA AUTi!0RITY hbc R. Gr by, Mr dor 4 F hh00h27 Nuclear Licens ng and PNU " Regulatory Affairs (0 /

Enclosure cc: See page 2 I k)\

An Equal Opportunity Employer

A

's

~

- U.S. NuclearfRegulatory Commission JUL 151988 Enclosure cc (Enclosure):

Ms. S. C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Connission One. White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director for Inspection Proger4ms TVA Projects Division U.S. Nuclear Regulatory Commission RAelon II 101 Marietta Stecot, NW, Suito 2000 Atlanta, Georgia 30323' Sequoyah Resident Inspector Sequoyah Nuclear. Plant-2600 Igou Ferry Road Soddy Daisy, Tennesseo 37379

C' ' , ~

,., ~%.

ENGLOSURN c

COMMITHENT LIST t'>,

1. TVA will provide NRC with the additional' information requested by their May 11, 1987 letter on RG 1.97 by October 30, 1988. This responso will also include TVA's revised licensing position on PAM and justification for all-deviations to RG 1.97.