ML20151D093

From kanterella
Jump to navigation Jump to search
Notification of CRGR Meeting 133 on 880413 to Review Stated Items,Including Proposed Commission Paper on Key Policy Issues Resulting from NRC Staff Review of DOE Sponsored Advanced Reactor Concepts.Review Packages Encl.W/O Encls
ML20151D093
Person / Time
Issue date: 04/05/1988
From: Jordan E
Committee To Review Generic Requirements
To: Bernero R, Paperiello C, Ross D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
NUDOCS 8804130389
Download: ML20151D093 (2)


Text

,=

fm%

y, k

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 3

E WASHINGTON D. C. 20555 o

,/

April 5, 1988 MEMORANDUM FOR:

Robert M. Bernero, NMSS Carl J. Paperiello, RIII Denwood F. Ross, RES Joseph Scinto, OGC James M. Sniezek, NRR FROM:

Edward L. Jordan, Chairman Comittee to Review Generic Requirements

SUBJECT:

CRGR MEETING NO. 133 The Committee to Review Generic Requirements (CRGR) will meet in the afternoon on April 13, 1988, in Room 6507 MNBB.

The agenda is as follows:

1-2 p.m.

W. Morris will present for CRGR review (1) a proposed Comission Paper on Key Policy Issues Resulting from NRC Staff Review of DOE Sponsored Advanced Reactor Concepts, and (2) a proposed Comission Paper on Standardization of Advanced Reactor Designs.

(Review package is enclosed.)

2-3 p.m.

E. Rossi will present for CRGR review a proposed Supplement 1 to NRC Bulletin No. 87-02, "Fastener Testing to Determine Conformance with Applicable Material Specifications.

(Review package is enclosed.)

3-4 p.m E. Rossi will present for CRGR review proposed Supplement 1 to NRC Bullatin No. 85-03, "Motor-Operated Valves Comon Mode Failures During Plant Trarsients Due to Improper Switch Settings."

(Review package will be forwarded when it is available.)

If a CRGR member cannot attend the meeting, it is his responsibility to assure that an alternate, who is approved by the CRGR Chairman, attends the meeting.

Persons making presentations to the CRGR are responsible for (1) assuring that the information required for CRGR review is provided to the Comittee (CRGR Charter - IV.8), (2) coordinating and presenting views of other offices, (3) as app rop riatt., assuring that other offices are represented during the presenta-tion, and (4) assuring that agenda modifications are coordinated with the CRGR contact (J. Conran X29855) and others involved with the presentatior..

Division Directors or higher management should attend meetings addressing agenda items under their purview.

In accordance with the E00's March 29, 1984 memorandum to the Comission con-cerning "Forwarding of CRGR Documents to the Public Document Room (PDR)," the enclosures and other material to be distributed to CRGR members for consider-ation at this meeting, are considered predecisional information and will not be r

//

O

/ 4

,I

\\"

t 8804130399 880405 7

t PDR REvCP NRCCRCR fiEETING133 PDR v

.La

. released to the PDR until the NRC has considered (in a public forum) or decided the matter addressed by the information.

W sen.d Byi -

10 heen Edward L. Jordan, Chairman Committee to Review Generic Requirements

Enclosures:

As stated cc w/ enclosures:

SECY V. Stello, Jr.

cc w/o enclosures:

Commission (5)

J. Lieberman S. Ebneter W. Mcdonald Regional Administrators W. Parler W. Morris E. Rossi Distribution:

Central File (w/o'en~ci)J' B. Doolittle PDR (NRC/CRGR (w/o enc.)

S. Treby (w/o enc.)

CRGR CF (w/o enc.)

T. Rehm (w/o enc.)

CRGR SF M. Taylor, OEDO E. Jordan J. Heltemes J. Conran C. Sakenas R. Fraley

./A 0FC : AE00:CR R :

A [1 DD

C G

00 :

40......

NAMf f o,

$CJ 1 emes $

I dan n.cg 4/4 /88 4//hT88 4/s7/88

/

DATE :