ML20151C620

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting 88-043 on 880328 W/Util in King of Prussia,Pa to Discuss Licensee Power Ascension Program
ML20151C620
Person / Time
Site: Pilgrim
Issue date: 03/22/1988
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8804130097
Download: ML20151C620 (2)


Text

'e e MAR 2 21988 No.88-043 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Name of Licensee: Boston Edison Company Name of Facility: Pilgrim Nuclear Power Station -

Docket No.: 50-293 Time and Date of Meeting: 11:00 A.M., March 28, 1988 Location of Meeting: Ragion I, King of Prussia, Pennsylvania Division of Reactor Safety (DRS) Conference Room Purpose of Meeting: To Discuss the Licensee's Power Ascension Program NRC Attendees: W. F. Kane, Director, Division of Reactor Projects (DRP)

5. J. Collins, Deputy Director, DRP J. P. Durr, Chief Engineering Branch, Division of Reactor Safety (DRS)

R. M. Gallo, Chief, Operations Branch, DRS D. J. Florek. Senior Operations Engineer. BWRS. 08. DRS M. G. Evans, Operations Engineer, BWRS, OB, DRS J. T. Wiggins, Chief, Reactor Projects Branch No. 3, DRP A. R. Blough, Chief, Reactor Projects Section No. 3B, DRP R. Wessman, Director, Project Directorate I-3, Office of Nuclear Reactor Regulation (NRR)

D. Mcdonald, Project Manager, NRR Licensee Attendees: R. Bird, Senior Vice President - Nuclear Operations R. Ledgett, Executive Assistant to the Sanior Vice (

President L. Schmeling, Project Officer for Power Ascension Note: Attendance by NRC personnel at this meeting should be made known by March 25, 1988, via telephone call to A. R. Blough, Region I, at FTS 8-346-5146 or (215) 337-5146.

Prepared By:

A. Randy d ough~, Chief Reactor Projects Section No. 3B bo 3 h!O P

OFrICIAL RECOR9 COPY MEETING NOTICE NO.88-043 - 0001.0.0 03/22/88 '

}='O

Meeting Notice No.88-043 2

% i & lObb Distribution:

V. Stello, Jr., Executive Director for Operations J. M. Taylor, Deputy Executive Director for Regional Operations J. G. Partlow, Director, Division of Reactor Inspection & Safeguards, NRR J. Lieberman, Director, Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor Regulation J, H. Sniezek, Acting Associate Director for Inspection & Technical Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR B. Clayton, Regional Coordinator, ED0 S. Varga, Director, Division of Reactor Projects I-II, NRR R. Wessman, Director, Project Directorate I-3, NRR D. Mcdonald, Project Manager, NRR Public Document Room (PDR)

Local Public Document Room (LPOR)

W. Griffin, Piymouth Board of Selectmen Honorable W. Golden, Massachusetts State Se,ator Resident Inspector bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Region I Receptionist PA0 Meeting Attendees DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP

\

RI:DRP 'RI:DRP I:DRP Doerflein/mjd Blough Wiggins 3(2I /88 3/y/88 3/ b 0FFICIAL RECORD COPY MEETIN5 NOTICE NO.88-043 - 0002.0.0 03/21/88 n