AO 20-75:on 751218,30-inch Ventilation Pipe Contacted by Power Showel During Const Activity.Caused by Inadequate Administrative Controls Re Preparation & Review of Const Activity.Work Activity Stopped.Engineering Review Requested
ML20151C193
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/19/1975
From: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
AO-20-75, NUDOCS 8103090153
Download: ML20151C193 (2)


Text

-

' Ts li

- s.w f

' fid ;*

f(

'J.

/4 Dif CEC i9.R.F 5 A4

,h$-

,@ f a

!~ VU AGCY WHEA 1 -UUA PT-M35.513P i, n

'AS l ROKQUWOLK0 APE 0YYRA353002)PD 12/19/75 1715 LJ u ' ;

TLX. CONSDOWER JKN ~

llE 7.CZC O'02 DLY JACKSON t1ICH. 12/19/75 l j 7, I: PXS J G KEPPLER g;{

US'!RC (FORMERLY AEC)

GLEN ELLYN, IL' i

i THIS VILL CONFIRI1. THE TELECON BETUEEt!'D E DE 1100R,' BIG ROCK POIt'T

+

@F "-.

PLANT AND..MR D HUNTER, USNRC, THIS MORNINC.

4 s'

/-

3

^

go t

i 1.

REPORT.-No'- A0-20-75 DOCKET 50-155 LJ,!

D

, 2A.

REPOPT DATE - DECEMDER'19, 1975 (b

OCCt[RMENCE DATE ' DECEMBER-18,-1975 c'I i 28.

.(}

, s

{

.b sf Lds s

i.

Lls r'iN 3.

FACILITY - BIG ROCK POINT PLANT "o n IJ D 4.

IDENTIFICAT10t10F OCCURRENCE - INADEQUATE PREPAT;ATION AND REVIEU p

OF CONSTRUCTION ACTIVITY.-

^

M(df

' CONDITIONS PRIOR TO'0CCURRENCE

. NORMAL POVER OPEMATION Co 5.

i 6.

DESCRIPTION OF OCCURRENCE - A' CONSTRUCTION CREV USING A POUER I.i

(;

SHOVEL'VAS DIGGING IN THE AREA BETVEEN THE TURDINE CUILDINC /!!D l

[if REACTOR CONTAINMENT AND CONTACTED-A 3C-INCH VENTIl.ATION P1FE AT A b

i DEPTH OF ABOUT 2 FEET BELOV THE SUHFACE.

ONLY SUPEHFICIAL DAMAGE TO THE PIPE' OCCURRED. - THE V0P.K ACTIVITY. VAS STOPPED PENDIN3 A KEVIEV h.h j

OF THE PROJECT.

,.=.2 e

1 i

THIS ' DOCUMENT CONTAINS POOR QUALITY PAGES I

r/mo/53

f,

. gI

/H h

' ' ?l '

1. s e 7.

DESIG'JATION OF APPARENT CAUSE 0F OCCURRENCE - FAILURE OF ADMIT;IS-(t' TRATIVE CONTROLS PER SECTION 7.2.2.1.3 A(1)G OF THE TECH SPECS.

g. 1 f"5 8.

MhLYSIS OF OCCURRENCE - A WORK PACKAGE COVERING THE EXCAVATIO"

-[

I, PROJFCT DID NOT EXIST.

THE DRAVINGS USED BY Tile CONTRACTOR DID NOT IDENTIFY ANY INTERFERENCES AND ONLY SHOUED T){E COMPLETED STRUCTURE

[.;f.

To u.E INSTALLED SUBSEQUENT TO T)(E EXCAVATION.

AN EVALUATION DY Tl!E PLM'T STr.FF HAD NOT BEEN CONDUCTED AND REVIEWED AS REQUIhED BY PLANT

[

ADMI'ISi!.ATIVE PT,0CEDURES.

SEVEFtAL SAFETY-RELATED BUNIED SYSTENS

,~

HWE SUBSEQUE'!TLY BEEN IDENTIFIED 04 PLANT DRAWINGS IN THE EXCAVATIO::

[

]

AREA MJD AN EV ALUATION' 0F THE INTEGRITY OF T}iESE SYSTE!;S VILL BE 1:EE g__

t 9.

COPRECTIVE ACTION - UORK ACTIVITY WAS STOPPED AND NEADBY BUT.IED i

LINES UILL DE PF.0TECTED FROM FhEEZIN3.

ENGINEET.ING REVIEU HAS BEEN I

a!

+'

L L IT[

a,.

l. s f l.

3

('-

4 F

REQUESTED THROU3H THE CCNT3 ACTOR BEFORE PROCEEDING WITH WORK.

t t

(z. h 10 FAILURE DATA - NOT APPLICABLE.

P

l. j [

R R SEYELL 1,*'

NUCLE AR LI CE'1SIl23 AD.'1INISTR ATOR

("

CONSU.'1ERS POWER COMPANY f,.

CBY

(

599 "2

it:

CC J G KEPPLER USNRDC GLEN ELLYN IL

[, tg C J HARTMAN BIS ROCK POINT l L. :'h '

tlU AGCY UHEA Di!C 2. 2 T -

1.,M i !:

. T ],

t u

J $I lt I

l' l

g i

l l

l I

I l

e i

e

.,