ML20151C010
| ML20151C010 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 03/31/1988 |
| From: | Hunsader S COMMONWEALTH EDISON CO. |
| To: | Murley T NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation |
| References | |
| 4443K, NUDOCS 8804120092 | |
| Download: ML20151C010 (1) | |
Text
~
i
/
s CommonweaMh Edison
[
~
) One First NationrJ Plaza. Chk:ago, Illinois
\\
O Address Reply to: Post Offce Box 767 Chicago,Imnois 60690 0767 March 31, 1988 Mr. T. E. Murley U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC. 20555 Attn: Document Control Desk
Subject:
Braidwood Station Unit 2 Fire Protection Status NRC Docket No. 50-457
References:
(a) December 16, 1987 S.C. Hunsader letter to T.E. Murley (b) March 14, 1988 S.C. Hunsader letter to T.E. Murley
Dear Mr. Murley:
Reference (a) provided the status and schedule for the completion of certain fire protection items.
Included in this status was the scheduled completion of structural steel fire-proofing and, in particular the completion schedule of structural steel fire-proofing in the Lower Cable Spreading Room. Referenced (b) included in part an updated status of the completion in this area and stated that the Lower Cable Spreading Room would be completed by March 30, 1988.
The purpose of this letter is to inform you that as of March 30, 1988, the structural steel fire proofing in the Lower Cable Spreading Room has been completed.
By completion of this item, the remaining fire protection item of Attachment I to Facility Operating License NPF-75, as presented in Referenced (b) has been completed.
Please address any questions concerning this matter to this office, very truly yours,
(*
Q w
S. C. Hunsader Nuclear Licensing Administrator
/klj cc: NRC Resident Inspector-Braidwood NkC Region III S. Sands 1 0 4443K 8804120092 880331 PDR ADOCK 05000457 F
DCD l
i