ML20151B947
| ML20151B947 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 12/01/1987 |
| From: | Norberg J Office of Nuclear Reactor Regulation |
| To: | Cheng C, Richardson J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8804120048 | |
| Download: ML20151B947 (3) | |
Text
{{#Wiki_filter:e- $2 Kfg Ao UNITED STATES g [ g NUCLEAR REGULATORY COMMISSION 5 j WASHINGTON. D. C. 20665 \\,,...../ December 1, 1987 NOTE T0: OnRichardson/C.aY.aCheng FROM: James Norberg, Special Assistant Division of Engineering and Systems Technology SUBJECl: WITS ACTION ITEM NO. 870220 STAFF REQUIREMENTS - BRIEFING ON NORTH ANNA STEAM GENERATOR TUBE RUPTURE EVENT, 9:30 a.m., Monday, November 9, 1987, COMMISSIONERS CONFERENCE ROOM, D.C. OFFICE The response to the attached ticket item is due to OEST (Mr. Shao's Office, P700) norlatersthantC06 01/11/887 Please make sure that 0/ DEST receives a copy of the final ticket response. When preparing the response, pleese add to the concurrence page distribution list "LShao" and the appropriate ticket number identifying the action item. For example, LShao (WITS 87-XX or GEST 87-XX or YT879XXX or E00 #26XX). It is DEST policy that the Director receive respolises for all tickets at least one working day prior to the due date. If the original action item due date is changed, please infonn Nancy at X28793, she will then revise the DEST due date accordingly. You should also keep Nancy informed on the status of all controlled action items (e.g., EDO, Green Tickets, WITS) assigned to your office (e.g., to what branch / person the action item was assigned to). C -t W) ames Norberg, Special As stant Division of Engineeriq and Systems Technology \\ 8804120048 871201 PDR ADOCK 05000338 P PDR J
l i l e p-W / / V o1 U x i W TS TEM i i I i i I l i l WITS ! UMBER: 870220 ACTION: DEST:SHAO l DUE DATE: 1/15/88 I i I l I i. .I j DUE DATE CHANGES MUST BE APPROVED BY THE DEPUTY DIRECICR OR THE I ASSOCIATE C'.RECIORS OF NRR. YOU MUST THEN CALL MARCD 3RIDGFRS IN THE EDO'S OFFICE (27585) AND RECUEST THE EXTENSION. PLEASE tCTIFY DORIS MOSSBURG (28970) OF ANY CHANGES MAD 3 70 DiIS WITS I ITEMS. THANK YOU, raR ROUuNc: MuRtEu Sr. EzEx ACTION MIRAGLIA j "I[iF e e DUE TO NRR DIRECTOR'S OFFICE WOW BY _ p g r,fLG ---l BURG 1 J
1 IN RESPONSE, PLEASE REFER TO: M871109
- /
'o UNITED STATES 8 NUCLEAR REGULATOHY COMMISSION o I W ASHIN GTON,0.C. 20555
- f
. ACTION.-{Murley,NRR; os...../ November 24, 1987 Cys: Stello OFFICE OF THE Taylor SECRETARY Rehm Grace, RII Beckjord,RES Murray, 0GC/B MEMORANDUM FOR: Victor Stello, Jr. Executive Director for Operations ((/kn ew L. Bates, Acting Secretary FROM:
SUBJECT:
STAFF REQUIREMENTS - BRIEFING ON NORTH ANNA STEAM UENERATOR TUBE RUPTURE EVENT, 9:30 A.M., MONDAY, NOVEMBER o, 1987, COMMISSIONERS' CONFERENCE ROOM, D.C. CFFICE (OPEN TO PUBLIC ATTENDANCE) i i The Commission
- was briefed by the staff on the July 15, 1987, steam generator. tube rupture event at Virginia Power Company's North-Anna-Unit?1-Nuclear Power Station.
The Commission requested the staff to address the safety significance of the licensee diverting a senior non-licensed Ng operator / maintenance personnel to man the phone and transmit gg8 plant status to NRC and thereby making that individual unavail-able to assist in returning the plant to safe shutdown i n W ons. (SECY Suspense: 1/15/88) Tb Commission furthermore requested additional information on gg tne procedures which direct the operator to dec.ase reactor power as primary to secondary leakage increases. The staff should address the permissible period of continued plant A0 operation at degraded conditions and the associated safety significance. (EDoy (NRR) (SECY Suspense: 1/15/88) Chairman Zech requested a report to the Commission concerning staff action on the generic implications of this event. (EOoy (NRR) (se0f#etispMhM###/1/def {Q pq (ED0 Suspense: 6/22/88) cc: Chairman Zech g. Commissioner Roberts Commissioner Bernthal Commissioner Carr Commissioner Rogers OGC GPA PDR - Advance R6dd Off. EDQ DCS - 016 Phillips Date //- 2f-f 7 O ou ' Commissioner Berntha'. was not present. T m._/ - n I t 0 r~ n na n n[I '"^"Y%v7 t-
l l 1 I ~ Log ) '87.~85' r
SUBJECT:
Staff Requirements - Briefing on N. Anni S3TR Event. i1 WITS 870220 4,- - u [ 9:30 am, Monday, Nov. 9,1987, Commissioneis Corif. am DC' Office - DATE IN: 12/1/87 DATE OUT: 0 u ACTION: O Con =ents ygSetupnieting d,- O See Mr. Richardson. [3 Prepare reply; for EBC signature-S'upply Infora.-
- O other:
To: '~ K.-Manoly ASSIGNED TO: J. Richardson L. Marsh-G. Bacchi C. McCracken C. Cheng E'Returnto: Corie Paul w/cy of response work w/Hodges -RESPONSE DUE DATE: 1/11/88 to Shao _ NATURE OF RESPONSE: I. [ 5ummary of action (s) _taken] I DATE COMPLETED: n SIGNATURE: d l' L o l l l l l 1 _}}