ML20151B936

From kanterella
Jump to navigation Jump to search
Mod 5,increasing Contract Ceiling Amount & Providing Incremental Funding to, Operating Reactor Plant Specific Reviews
ML20151B936
Person / Time
Issue date: 07/05/1988
From: Edgeworth P, Saluja J, Stewart R
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), SMALL BUSINESS ADMINISTRATION, VIKING SYSTEMS INTERNATIONAL
To:
Shared Package
ML20151B926 List:
References
CON-FIN-D-1762, CON-NRC-03-87-028, CON-NRC-3-87-28 NUDOCS 8807210161
Download: ML20151B936 (3)


Text

w.x

1. C Or1 k RACI f u C O DI.

I f*G L Of I'/.G L b

~

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1

l3

2. AM E N OML N1(MOOtt ac Al aON NO.
3. LF F ECTIVE DAI L
4. H L ouis41 EON /PURCH ASL H L Q. NO.
5. PHOJLC1 NO. ftf erpur.ble) 5

(/,Z'////

NRR-87-028

.. 55Uc0 ov i

y

1. AOuiN Si L R E D oy,u.e, e, es.n i,,m CODE l U. S. Nuclear Regulatory C6i9fffssion

- Division of Contracts &, Property Management Washington, DC 20555

.. N AME AND ADORE 55 OF CONT H ACT OR (No. streef. county State end 2AP Code)

(/)

9A. AMENOMLNT OF 50LICaT ATION NO.

PRIME:

U.S. Small Business Administration 960 Pennsylvania Avenue, 5th Floor Pittsburgh, PA 15222 eu. OATEO <sts irzar is SUB:

Viking Systems International loa. MOOtF IC ATION OF CON T R ACT/ORDEp 2070 Wm. Pitt Way X

Pittsburgh, PA 15238 NRC '03-87-028 3 08. DAT EO (SEE JTE*f JJ)

COoE lFAClllTY Cf #0E l4/20/87

11. THIS ITEM ONLY AP 't i~ S TO AMENDMENTS.OF SOLICITATIONS The above numbered solicitation is amended as set forth in hem 14. The bour and date specified for receipt of Offers O i,esieeded.O i, nei es.

nncbd.

Offers must acknowledge receipt of this amendment prior to f a bour and date specified in the solicitation or as amended. by one of the following methods:

(a) By completing items 8 and 15. and returning copies of the amendment: (b) By ecknowledging receipt of this amendment on each copy of the offer

,ubmitted; or (c) By separate fetier or telegram which inc Mes a reference to the solicitation and amendment numbers. F AILURE OF YOUR ACKNOWLEDG.

MENT TO BE RECEIVED AT THE PLACE DESIGNATED s'OR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this arner.dment you desire to change an offer already submitted.such change may be r:Me by telegram or IItter, provided each telegram or letter rnakes reference to the solicitation and this amendment and is receiwd prior to the opening f.our and date specified.

12. ACCOUNTING AND APPh0PRI AT ION DAT A (J/ required)

B&R No.: 20-19-05-02 FIN No. 01762 APPN No.: 31X0200.208 Obligate: $100,000.00

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.

^"

"^"

^" "^

W ^' S'CS"da"OER "O.

i D. THE ABOVE NUM8CRED CONT R ACT/ ORDER 5% MOOtFIED TO RE FLECT THE ADMINtST R ATIVE Cv4ANGCS teuch as chantes in paylnt olfact, appropr.arion dele, etc.) SE T FO RT H IN IT E M 14. PURSU ANT TO THE AU THO RITY OF F A R 4 3.lo3(b).

C. THIS SUPPLE MENT AL AGR E LuCNT 15 ENT ERED INTO PURSUANT T O AUT HORt T V OF a X

Mutual agreement of both parties O. 0,ncu ts>< car ripe or anosa c u.on and ouunoner MPORTANT: Contractor h i$ not, i$ required to sign this document and return 4

Copies to the i$ suing of.fice.

IDL5CRnPTsON OF AMENOMLtt t/MOOtF 6 CAT SON (Ortenued by UCF nection headsnge, ancluding selecitetsontcontruct nutileet enatter schere feastbLt.)

The purpose of this mo.dification is to 1) increase the contract ceiling amount, 2) provide in-cremental funrb under this contract, and 3) revise the a'ddress for place of delivery and project of ficer. Thrxcfore, this contract is modified as follows: '

1.

The total istimated amount of the contract ceiling under this contractis increased by

$400,000.00 from $326.,290.00 to $726,290.00: Therefore, Section B.2, paragraph a., first sentence is revised to read as follows:

"The total estimated amount of this contract (ceiling) for the products / services ordered, delivered and accepted under this contract is $726,290.00."

,Cy,ge,oaoe, he,ein..iiie,

..no coneriion or ih. oocumeni, eve,enced in Item 9A or 10 A. as heretofore chang.d. semains unchang.d and in f ull force 2 5 A. f4 AMC Af40 TIT LE OF SIGNER (Type or print) 16A. r4 AMC AND TITLC OF CC NT RACi tNG Of' F aCCR (Type or pnnff See Signat. e Page See Signature Page I SB. C O r41 R AC T O R/OF F (HO R I SC. DA T 03G hi~O' 36d. UNIT 00 STATE S OF AMC RICA 16f. D ATL SIGN LD

~

8807210161 880705 av PDR CONTR 8 5 a ' '*'< * / C* a "* c a' OII*<< ')

-m t4>..,.,N R C.3 3 4.e u t o03-87-028 PNV s

me 30105 ST ANDARD FORM 30 (REV.10 83)

r,,

aq u

SF 30 NRC 03-87-028, MOD 5 (cont'd) 2.

The total amount obligated under this contract is increased by

$100,000.00 from $326,000.00 to $426,000.00. Therefore, Sectior, 8.2, paragraph b., first sentence is' revised to read as follows:

"The am6unt presently obligated with respect to this contract is

$426,000.00. "

3.

Section F. 4, Place of Delivery, Paragraph a. is revised to read as follows:

"a.

Project Officer (4 copies)

U. S. Nuclear Regulatory Commission Contract No. NRC-03-87-028 Cffice of Nuclear Reactor Regulation Technical Assistance Management Branch Mail Stop:

11 H22 Washington, DC 20555" 4

Section G.

2.,

Project Officer Authority, paragraph a.,

is revised to read as follows:

"a.

The Contracting Officer's authorized representative hereinafter referred to as the Project Officer for this contract is:

Name:

Chester Poslusny, Jr.

Address:

U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Mail Stop:

11 H22 Washington, DC 20555 Telephone Number:

(301) 492-1219."

5.

Under Section I, FAR Clause 52.216-19, paragraph (b)(2) is revised to read "$726,290.00" in lieu of "$326,290.00."

6.

The Contractor's address is revised from:

121 H. Highland Avenue, Suite 203 -

Pittsburgh, PA 15206 to:

2070 Wm. Pitt Vay Pittsburgh, PA 15238 All other terms and conditions under this contract remain the same.

I i

0-

.a.

c

.s NRC-03-87-028 Hodification No. 5 Page 3 of 3

' TRIPARTITE AGREEMENT Signature Page

- SUBQ0NTRACTOR:'

Viking Systems.Internat'ional By:

hd h[4 Date:

7/2-/M

( SCt"..ShutG A-Name:

Title:

f AEG Io BAT ~~

e 0

PRIME CONTRACTOR:

U.S. Smil Business Administration 7hh[

By:

mD Date:

/~-

"I i

Name:

RONALD S T EW ART CQHIRACTING QEEICER

Title:

PROCURING OfflCE:

U.S. Nuc. lear Regulatory Commission By:

d b [1vt Date:

//.2V/,P7 v

g i

(

Name:

Paul J. Edgh orth

Title:

Contracting Of ficer

~

9 e

s 8

.