Responds to Violation Noted in Insp Repts 50-454/88-02 & 50-455/88-02.Corrective Actions:Procedure Implicitly Directing Covers to Be Reinstalled for Environ Qualification of Barton 752 Instruments Will Be Revised to Include Steps
ML20151A568
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/24/1988
From: Butterfield L
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
4407K, NUDOCS 8804070082
Download: ML20151A568 (3)


Text

i C'/] Chicago libnois 60690 0767 N Commonwealth Edison.

- () 60 p.[

v_

One FarSt N $onal Plaza Chicago, Cinois j

- r.

I '

Address Reply to: Post Offco BoV6T~

-\\

\\d March 24, 1988 i

Mr. A. Bert Davis Regional Administrator U.S. Naclear Regulatory Corrunission Region III 799 Roosevelt Road Clen Ellyn, IL. 60137

Subject:

Byron Station Units 1 and 2 i

Response to Inspection Reports Nos.

50-454/88-002 and 50-455/88-002

+

NRC Docket h'os. 50-454 and 50-455 Reference (a)

'J.L. Forney letter to C. Reed dated February 24, 1988

[

Dear Mr. Davis:

This letter is in response to the inspection conducted by Mr. P.G.

Brochman and Ms. N.V. Gilles through January 1 through February 11, 1988 of activities at Byron Station. Referene (a) indicated that certain activities appeared to be in violation of NRC requirements. The i

4 Consnonwealth Edison Company response to the Notice of Violation is provided l

in tha enclosure.

l If you have any further questions on this matter, please direct i

them to this office.

l Very truly ycars,

.s

\\

L. D. Butterfiel Nuclear Licensing Manager T

l

/klj encl.

cc NRC Resident Inspector-Byron l

q NRC Document Centrol Desk I

4407K t

8804070082 880324 M28h l

PDR ADOCK 05000454 O

PDRr

(

J P

i e

Enclosure Commonwealth Edison Company Response to Inspection Report 454/88-002 and 455/88-002 j

Violation 1 (454/88-002-02) 1 j

10 CFR 50.49 requires that each licensee establish a program to maintain the environmental qualification of safety related (class 1-E) electrical equipment which mitigates the consequences of an accident.

The Byron Safety Related Component List specifies that level transmitter ILT-0932 is a class 1-E component and requires qualification for a harsh environment. Level transmitter ILT-0932 is a Barton Transmitter, Model 752, and is utilized by control room operators during a safety injection to mitigate a loss of coolant accident.

Equipment Qualification Binder number ESE-4A requires that a Barton Transmitter, Model 752, have its zero and span adjusting screw protectivo covers installed to be environmentally qualified.

l Contrary to the above, on January 28, 1988, the zero and span adjusting screw protective covers for refueling water storage tank level transmitter ILT-0932 were not installed.

Corrective Action Taken and Results Achieved The Instrument Maintenance Department recalibrated ILT-0932 and verified that the EQ requirements were met per BIS 3.3.6-200, Revision 5, and re-installed the zero and span covers.

This was completed on 01-28-88.

Corrective Action to be Taken to Avoid Further Violation i

i Although the procedure implicitly directs the covers to be J

re-installed, the applicable procedures for all EQ related Barton 752 instruments used in a harsh environment (both Unit 1 and Unit 2) will be revised to include a step that references the replacement of the covers that have been removed.

Date k? hen Full Compliance Will be Achieved i

j procedures will be revised by 09-01-88.

This will ensure that the i

revised procedures will be available prior to the next refueling outage.

(AIR 454-225-88-0052) l 5