ML20150F941

From kanterella
Jump to navigation Jump to search
Forwards Amend 35 to Fsar,Including Changes to Section 17.1, QA During Design & Const, Per 10CFR50.55(f).Description of Changes Encl
ML20150F941
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/30/1988
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20150F944 List:
References
GN-1440, NUDOCS 8804060098
Download: ML20150F941 (2)


Text

_

Georgia Povcr Corrpary Routo 2, Box 29tA Weyresboro. Geor0:a 30830 Telepve 404 554-9961 404 724-8114 Southem Corrpany Services, Inc Post Off te Bon 2625 R

8ttm:ngham. Alabama 35202 Teteptone 205 870-6011 Vogtle Proj.ect March 30,1988 U. S. Nuclear Regulatory Commission File: X7N00.0-35 ATTN: Document Control Desk X7N17.1 Washington, D. C.

20555 Log: GN-1440 NRC DOCKET NUMPERS 50-424 and 50-425 OPERATING LICENSE NPF-68 CONSTRUCTION PERMIT NUMBER CPPR-109 V0GTLE ELFCTRIC GENERATING PIANT - UNITS 1 AND 2 FSAR AM"NDMFNT NUMBER 35 Centleren:

Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, hereby submits Amendment 35 to the Vogtle Electric Generating Plant (VEGP) Final Safety Analysis Report (FSAR).

The changes resulting from this anendment are identified in the Attachment.

Stese changes are applicable to both Units 1 and 2.

All substantive changes, for Unit 1, were evaluated as required by Title 10 CFR 50.59.

The only exceptions are those items identified in the Attachment as editorial corrections or the incorporation of licensing correspondence which has been reviewed and approved by your staff.

This seendeent also includes changes to Section 17.1, Quality Assurance During Design and Construction.

These changes have been reviewed and it has been concluded that, in accordance with Title 10 CFR 50.55(f), they do not adversely affect the technical or quality c'ntrols and do not reduce the commitients of the Quality Program.

In accordance with the requirements of Title 10 CFR 50.30(f) and Title 10 CFR 50.4(b), one (1) signed original and thirty-seven (37) copies of Amendment 35 are submitted for your use.

Also in accordance with the reauirements of Title 10 CFR 50.4(b), copies of Arendment 35 are being sent to the NRC Regional office and the NRC Resident Inspector.

1 G804060098 880330 POR ADOCK 05000424 et roca

U. S. Nuclear Regulatory File: X7N00.0-35 March 30,1988 X7N17.1 Page 2 T,og : GN-1440 Should you have any questions on the enclosed submittals, do not hesitate to contact me.

Yours truly, fa P. D. Rice Sk'ORN IVD SUBSCRIBED BEFORE ME, THIS d

DAY OF

/) h

_, 1997.

9 '! m 3. M

(/

Notary Public j

Netoy Pubfie, Richmend County, Georgio PDR/1g My comma;:n ey;res June 16, 1990.

Enclosure cc: NRC Regional Administrator NRC Resident Inspector FSAR Distribution List 1411V

\\