Final Deficiency Rept CP-87-132 Re Unqualified Limitorque Actuators.Initially Reported on 880105.All Class 1E Limitorque Actuators Will Be Examined & Corrected Where Necessary Under Field Verification Method TE-FVM-EQ-047
ML20150F164
Person / Time
Site: Comanche Peak  
Issue date: 03/31/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-87-132, TXX-88374, NUDOCS 8804050038
Download: ML20150F164 (1)


Text

.

.. a

==

~" 9 Loa

  1. TXX-88374 C.

~

File d 10110 C

903.11 7UELECTRIC Ref.

March 31, 1988

%litiara G. Countil i sr< w>s 6 a r fronJens V. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMAflCHE PEAK STEAfi ELECTRIC STATION (CPSES)

DOCKET fl05. 50-445 AfiD 50-446 UllQUAllFIED LIMITORQUE ACTUATORS SDAR:

CP-87-132 (FiflAL PLPORT)

Gentlemen:

On January 5, 1988, we notified you by our letter, logged Ixx-88027, of a deficiency involving unqualified limitorque actuators which we deemed reportable under the provisions of 10CfR50.55(e). Our latest report was logged TXX-88337 dated March 29, I'm8.

This report is submitted to provide the cortective action completion 5thodulo.

As indicated in TXX-88027, all Class lE limitorque actuators will be examined and corrected where necessary under Field Verification tiethod TE-FVit-EQ-047.

Unit I corrective actions are currently scheduled fcr completion by September 1, 1988.

The corresponding Unit 2 corrective actions will be completed prior to Unit 2 hot function? testing.

Very t ruly yr-OR. bwJ-W. G. Counsil By:

D. I:. Woodlan Declet Licensina flanaaer VIP /gre c -tir. R. D. thrt in, l'e q i en tv i

Pr;ialent inspm t m '

f (" I '

f'!

l l

8804050038 890331

(

PDR ADOCK 05000445 I

D S

DCD 4M An o.%t Street L B ii Nks, To nas '!.'01 l