c!'
I I (01.lSl0D T'iM,I-L hling su ccF.
I ATR 1819N 0
(
iih
', j[a wer Omxiny 392 f e tric Tower Apri 1 3, 1979 I?O. Box 1700 h L1 L i liouston. Texas 77001 ST-IIL-AE-333 SFN: C-0570
. !.!r. K. C. Sei d l e, Chi e f Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Pla:a Drive, Suite 1000 Arlington, TX 76012
SUBJECT:
RESPONSE TO ITES! 0F NONC05!Pl. LANCE SOUTli 1EXAS Pl:0 JECT li!.ECTRIC GENERATING STATION DOCKET NOS. 50-498/79-03 AND 50-499/79-03
Dear )!r. Seidle:
The following is llouston I.ighting 6 Power Company's (ill.GP) response to the item of noncompliance identified in IE Inspection Report Nos. 50-495/79-03 and 50-499/79-03 dated Starch 14, 1979.
Faildre to Follow Procedures for Storace of Flaterial 1)
Corrective Action Taken a)
Storage areas on site have been surveyed for stainless steel material in contact with carbon steel.
Additional items were identified on a nonconformance report issued itarch 19, 1979, and are awaiting proper disposition.
b) Site storage was also surveyed to monitor for material in contact with the ground.
Specific areas of concern have been iden-ti fied and corrective action has been
- assigned, q
N.
t n,A., i 3,3 r. P,.a c.w..,y
(
l 393 3
}8 Str. Seidle l Ir April 3,1979 j
Page Two 2)
Recurrence Control 1
a)
Rece'iving inspection personnel have been
.given additional training, Plarch 23, 1979, i
to remind them of the potential problem of stainless steel and carbon steel in contact.
Additionally, thcCReceiving and Storage i
Procedure is being revised and will speci-r fically address the requirement for_separa-
{,*.,,.\\ \\ i e
- e I
tion of carbon and stainless steel.j - ---- -
b)
To prevent future contact of material with
~~the ground, specifically rebar, the }3rc-plaecment inspector will verify that material in the field areas meets this requirement, and surveillance will be perfonned to monitor the construction storage yards for compliance.
Additionally, appropriate construction person-nel have been instructed on the need to main-tain correct storage of rebar.
The Storage i
and Flaintenance Procedure will be revised to l'
includethisrequirenent.]'.
1 1
Full compliance will be achieved by ) fay IS, 1979.
Very trulv vours, j-E. A. Turner, Vice President Power Plant Construction j
6 Technical Services 1
r j
EAT:rka i
)
cc: Flessrs. G. K. Opren, Jr.
l R. A. Fra:ar l
D. G. Barker i
Fl. L. Borchelt (CPL) l J. W. Ffoore (CPL) 1 J. B. Poston (CPS)
R. C. Flecke (CPS) j R. L. Ilancock (COA)
- 11. L. Peterson (C0A)
C. W. Vincent (B6R)
STP RFIS
\\