ML20150E423
ML20150E423 | |
Person / Time | |
---|---|
Site: | Peach Bottom, General Atomics |
Issue date: | 12/15/1978 |
From: | Mowry W GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER |
To: | Office of Nuclear Reactor Regulation |
References | |
NUDOCS 7812190145 | |
Download: ML20150E423 (1) | |
Similar Documents at Peach Bottom, General Atomics | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3581999-10-25025 October 1999
[Table view]Ack Receipt of Ref Author Ltr of 990720, Transmitting Changes to Fixed Site & Transportation Plan for Protection of Special Nuclear Matl of Moderate & Low Strategic Significance.Nrc Approval Not Required ML20217M6631999-10-19019 October 1999 Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted ML20217K9241999-10-14014 October 1999 Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys ML20217F7391999-10-14014 October 1999 Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests ML20217F6841999-10-13013 October 1999 Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam ML20217F3021999-10-12012 October 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B4051999-10-0505 October 1999 Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report ML20217B3181999-10-0505 October 1999 Advises That Info Submitted in 990712 Application,Which Contained Attachment Entitled, Addl Info Re Cycle Spec SLMCPR for Peach Bottom 3 Cycle 13,dtd 990609, with Affidavit,Will Be Withheld from Public Disclosure ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217C4981999-10-0101 October 1999 Informs That Based on NRC Review of General Atomics Info Concerning Decommissioning Cost Estimates.Nrc Has Determined That Submittal Listed Should Be Withheld from Public Disclosure,Per 10CFR2.790 ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20212J6851999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Peach Bottom Atomic Power Station on 990913.No Areas Identified in Which Licensee Performance Warranted Addl New Insps Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J5751999-09-28028 September 1999 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 990913-16 at Licensee Facility.Without Encls ML20216J0191999-09-27027 September 1999 Forwards Request for Addl Info Re Util 990301 Request to Support Installation of Digital Power Range Neutron Monitoring Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware,For Plant ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20216H6751999-09-24024 September 1999 Forwards Amends 229 & 232 to Licenses DPR-44 & DPR-56, Respectively & Ser.Amends Will Delete SR Associated Only with Refueling Platform Fuel Grapple Fully Retracted Position Interlock Input,Currently Required by SR 3.9.1.1 ML20216H6451999-09-24024 September 1999 Forwards Notice of Withdrawal of Util 990806 Application for Amends to Fols DPR-44 & DPR-56.Proposed Change Would Have Involved Temporary Change to Increase Limit for Average Water Temp of Normal Heat Sink ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212E8661999-09-22022 September 1999 Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212D1191999-09-17017 September 1999 Forwards SE Re Proposed Alternatives to ASME Section XI Requirements for Containment Inservice Insp Program at Plant,Units 2 & 3 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P2961999-09-0707 September 1999 Provides Authorization to Administer NRC Approved Initial Written Exams to Listed Applicants on 990913 at Peach Bottom Npp,Delta,Pennsylvania ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211L9961999-08-27027 August 1999 Forwards Semiannual Effluent Rept Required for Period 990101-990630.All Airborne & Liquid Effluent Releases Were Well within Allowable State of CA & NRC 10CFR20 Limits ML20211E6941999-08-26026 August 1999 Forwards Request for Addl Info Re Min Critical Power Ratio. Response Should Be Submitted within 30 Days of Ltr Receipt ML20211Q4491999-08-25025 August 1999 Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p) ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211D5421999-08-23023 August 1999 Forwards Amends 228 & 231 to Licenses DPR-44 & DPR-56, Respectively & Se.Amends Revise TSs to Correct Typographical & Editorial Errors Introduced in TSs by Previous Amends ML20211A9721999-08-20020 August 1999 Forwards Request for Addl Info Re Third 10-year Interval Inservice (ISI) Insp Program Plan for Plant,Units 2 & 3 ML20216G7361999-08-16016 August 1999 Identifies Listed Revs Which Impact Portion of Physical Protection Plan Applying to Mark I And/Or Mark F Triga Reactors,To Assist in Review of Jul 1999 Version of Plan ML20210Q8571999-08-12012 August 1999 Forwards Amends 36 & 45 to Licenses R-38 & R-67,respectively & Se.Amends Approve Decommissioning Plan for Ga Triga Mark 1 & F Research Reactors & Authorized Approved Decommissioning Plan to Be Included as Suppl to SAR ML20210T5451999-08-12012 August 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Licensee Request for Amends to Plant. Amends Consist of Changes to TS to Correct Typos & Editorial Errors Introduced in TS by Previous Amends ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20210P1561999-08-10010 August 1999 Submits Response to Requests for Addl Info Re GL 92-01,rev 1,Suppl 1, Rv Structural Integrity, for Pbap,Units 1 & 2. NRC Will Assume That Data Entered Into Rvid Are Acceptable for Plants,If Staff Does Not Receive Comments by 990901 ML20210N7831999-08-0909 August 1999 Forwards Copy of Notice of Consideration of Issuance of Amends to Fols,Proposed NSHC Determination & Opportunity for Hearing, Re 990806 Request for License Amends.Amends Incorporate Note Into PBAPS TS to Permit One Time Exemption ML20210P0801999-08-0404 August 1999 Forwards Initial Exam Repts 50-277/99-301 & 50-278/99-301 on 990702-14 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210J0161999-07-30030 July 1999 Forwards Copy of Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amends Re 990723 Application 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217F3021999-10-12012 October 1999
[Table view]Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, ML20217E7451999-10-0808 October 1999 Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 ML20217C4141999-10-0606 October 1999 Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld ML20217B9151999-10-0606 October 1999 Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware ML20217B7701999-10-0606 October 1999 Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20217B8891999-10-0101 October 1999 Forwards Response to RAI Re Request to Install Digital Power Range Neutron Monitoring Sys & Incorporate long-term,thermal-hydraulic Stability Solution Hardware. Revised TS Table 3.3.2.1-1 Encl 05000278/LER-1999-004, Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv)1999-10-0101 October 1999 Forwards LER 99-004-00 Re Multiple Unplanned ESF Actuations During Planned Mod Activities in Main Cr,Per Requirements 10CFR50.73(a)(2)(iv) ML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212H6171999-09-24024 September 1999 Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier ML20212H5431999-09-24024 September 1999 Informs of Decision to Inspect H-3 & H-4 Shroud Welds During Upcoming 3R12 Outage Scheduled to Begin Late Sept 1999 ML20216F8811999-09-23023 September 1999 Withdraws 990806 Exigent License Change Application.Tech Spec Change to Allow Continued Power Operation with Elevated Cooling Water Temps During Potentially Extreme Weather Conditions No Longer Needed Due to Favorable Weather ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211K7031999-08-30030 August 1999 Forwards Response to NRC 990826 RAI Re License Change Application ECR 99-01255,revising TSs 2.1.1.2 & 5.6.5 ML20211L9961999-08-27027 August 1999 Forwards Semiannual Effluent Rept Required for Period 990101-990630.All Airborne & Liquid Effluent Releases Were Well within Allowable State of CA & NRC 10CFR20 Limits ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20216G7361999-08-16016 August 1999 Identifies Listed Revs Which Impact Portion of Physical Protection Plan Applying to Mark I And/Or Mark F Triga Reactors,To Assist in Review of Jul 1999 Version of Plan ML20210P8151999-08-11011 August 1999 Forwards Final Pages for Pbaps,Unit 2 & 3 OLs Re License Change Application ECR 99-01497,which Reflects Change in Corporate Structure at Pse&G ML20210P8321999-08-11011 August 1999 Responds to NRC 990715 Telcon Re Util 990217 Submittal of Proposed Alternatives to Requirements of 10CFR50.55a(g)(6)(ii)(B)(1) Re Containment Inservice Insp Program ML20211B6521999-08-10010 August 1999 Informs That Dp Lewis,License SOP-11247,has Been Permanently Reassigned & No Longer Requires License,Per 10CFR50.74.Util Requests That Subject Individual Be Removed from List of License Holders ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20216G7161999-07-26026 July 1999 Documents That Changes Applicable to Two Triga Reactors Have Been Made Per 10CFR50.54 Re Revised Fixed Site & Transportation Plan for Protection of Special Nuclear Matl of Moderate & Low Strategic Significance ML20210F3731999-07-23023 July 1999 Submits Confirmation That,Iaw 10CFR50.80,PSE&G Is Requesting NRC Approval of Transfer of Ownership Interests in PBAPS, Units to New Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20210E5811999-07-21021 July 1999 Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS ML20212H5571999-07-20020 July 1999 Forwards Proprietary Revised Fixed Site & Transportation Plan for Protection of Special Nuclear Matl of Moderate & Low Strategic Significance. Encl Withheld,Per 10CFR2.790 ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000278/LER-1999-002, Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER1999-07-12012 July 1999 Forwards LER 99-002-01 to Correct Title Contained in Box (4) of LER Coversheet Form.Rev Does Not Change Reportability Requirements or Any Other Info Contained in Original Submittal of LER ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209D9781999-07-0808 July 1999 Forwards Addl Info to Support EA of Proposed 990212 License Application ECR 98-01675,correcting Minor Administrative Errors in TS Figure Showing Site & Exclusion Areas Boundaries & Two TS SRs ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20209C1201999-06-30030 June 1999 Informs of Util Intent to Request Renewed License for PBAPS, Units 2 & 3,IAW 10CFR54.Licensee Anticipates That License Renewal Application Will Be Submitted in Second Half of 2001 ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20209E1131999-06-30030 June 1999 Forwards Proprietary NRC Form 398, Personal Qualification Statement-Licensee, for Renewal of RO Licenses for EP Angle,Md Lebrun,Jh Seitz & Zi Varga,Licenses OP-10646-1, OP-11081,OP-11082 & OP-11085,respectively.Encls Withheld ML20196F2361999-06-22022 June 1999 Forwards Pages with Revised Organization Chart for Proposed Revised Tech Specs & for Decommissioning Plan 05000277/LER-1999-004, Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities1999-06-20020 June 1999 Forwards LER 99-004-00 Re Unplanned ESF Actuations During Planned Electrical Bus Restoration Following Maint Activities ML20196A5291999-06-14014 June 1999 Forwards Final Pbaps,Unit 3 TS Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal-hydraulic Stability Solution Hardware ML20195E6051999-05-27027 May 1999 Requests Exemption from Requirements of 10CFR72.44(d)(3) Re Submittal Date for Annual Rept of Principal Radionuclides Released to Environ.Exemption from 10CFR72.72(d) Re Storage of Spent Fuel Records,Additionally Requested ML20195B8171999-05-25025 May 1999 Forwards Final TS Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20195B6191999-05-19019 May 1999 Forwards PBAPS Units 2 & 3 Annual Radiological Environ Operating Rept 56 for 980101-1231, Per Section 6.9.2 of Ol. Trace Concentrations of Cs-137 Were Found in Sediment Consistent with Levels Observed in Previous Years ML20206S0341999-05-12012 May 1999 Responds to NRC 990414 RAI Re Licensee Submittal of Decommissioning Plan & Request for Termination of Triga Mark I & Mark F non-power Reactor Licenses R-38 & R-67.Revised Triga Ts,Encl,For Review & Approval ML20206P9171999-05-10010 May 1999 Updates Some of Transmitted Data Points Provided in Data Point Library ERDS for Pbaps,Units 2 & 3.Data Point Info Format Consistent with Guidance Specified in NUREG-1394 ML20206K6581999-05-0404 May 1999 Forwards PBAPS Bases Changes Through Unit 2 Bases Rev 25 & Units 3 Bases Rev 25.Bases Reflect Change Through Apr 1999, Thereby Satisfying Frequency Requirements of 10CFR50.71 ML20206F4141999-05-0303 May 1999 Responds to Recent RAI Re Submittal of Decommissioning Plan & Request for Termination of Triga Mark & Mark F non-power Reactor Licenses R-38 & R-67.Decommissioning Plan,Encl ML20206D4651999-04-29029 April 1999 Forwards Rev 16 to UFSAR & Rev 11 to Fire Protection Program (Fpp), for Pbaps,Units 2 & 3.Page Replacement Instructions for Incorporating Rev 16 to UFSAR & Rev 11 to Fpp,Encl ML20207B8431999-04-23023 April 1999 Forwards Final Rept for 981117,plume Exposure Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific for Peach Bottom Atomic Power Station.One Deficiency & 27 Areas Requiring C/A Identified ML20205S1981999-04-22022 April 1999 Responds to NRC 990414 RAI Re General Atomics Submittal of Decommissioning Plan & Request for Termination of Triga Mark I & Mark F non-power Reactor Licenses R-38 & R-67 ML20206C5461999-04-20020 April 1999 Forwards Radioactive Effluent Release Rept 41 for Jan-Dec 1998 for Pbaps,Units 1 & 2. Revs Made to ODCM & Station Process Control Program (PCP) During Rept Period,Encl 1999-09-09 Category:VENDOR/MANUFACTURER TO NRC MONTHYEARML20055G9951990-07-19019 July 1990
[Table view]Responds to Re Results of NRC Review of 10CFR50.59 Safety Analysis. Safety Evaluation Under 10CFR50.59 Microprocessor-Based Instrumentation & Control Sys for Ga Co Triga Mark I Reactor, Encl ML20247J8441989-09-0808 September 1989 Requests That All Info Submitted Re 10CFR50.59 Review Be Considered General Atomics Proprietary Info & Afforded Requisite Protection as Provided Under 10CFR2.790 ML20235J3121989-02-15015 February 1989 Submits Supplemental Info Re Facility Personnel.W Wittemore Promoted from Physicist in Charge of Triga Reactors to Director,Irradiation Svcs.J Razvi Promoted from Associate physicist-in-charge to physicist-in-charge ML20235J0371989-02-13013 February 1989 Advises of Recent Transposition of Personnel Holding Positions of physicist-in-charge & Associate physicist-in-charge ML20206J3831988-08-30030 August 1988 Forwards Matl Already Faxed to NRC in Response to 880830 Telcon.Info Requested on Proposed Filter Listed ML20153G6301988-08-23023 August 1988 Responds to 880825 Request for Documentation Indicating That Easement Agreement on Land Required to Maintain Effective Site Boundary of 100 Meters from Triga Reactor Permits Total Exclusion of Public at All Times.Easement Agreement Encl ML20151R4951988-03-0909 March 1988 Advises That Company Name Changed to General Atomics ML20149G2451988-02-11011 February 1988 Informs That Conversion of Triga Flip Fuel Not Planned, Due to DOE Plans to Fund Conversion from Highly Enriched Fuel to Low Enriched Fuel Only for university-owned Reactors.Doe Encl ML20215L0591987-06-22022 June 1987 Responds to Request for Assurance That Facility Neutron Monitoring Sys Design Similar to Design of Other Plants.List of Plants W/Similar Design,Already Reviewed & Approved by Nrc,Encl ML20211B9551987-02-12012 February 1987 Forwards DOE Which Notifies That Federal Funding for Conversion of Reactor to Low Enriched U Will Not Be Available During FY87.Funding Available for Conversion of Univ Owned Reactors Only ML20212J0121987-01-22022 January 1987 Forwards Response to 861223 Request for Addl Info Re 860520 Application for Amend to License R-67.Info Supports Designation of Triga Low Enriched U,Containing 30 Weight Percent U,As Std Triga Fuel ML20206M2711986-08-15015 August 1986 Forwards Class III Fee for Revised Radiological Contingency Plan,Per 860806 Request ML20198J0001986-05-0202 May 1986 Forwards Comments on Reactor Operator Exam of Three Candidates.Written Exam & Answer Key Encl ML20141E1061986-02-21021 February 1986 Remits Fee for 10CFR55 Svcs,Including Replacement & Requalification Exams & Related Items.Requests More Rapid Billing Since Obligation of Outstanding Bills Required Before Yr End ML20080H4691983-09-16016 September 1983 Forwards Digitization of Data Presented in Figure 4.2 of Stability Evaluation of BWR Cores, (XN-NF-691(P)),per Ga Schwenk 830908 Request.Encl Withheld (Ref 10CFR2.790) ML20054L9401982-06-23023 June 1982 Consents to Ga Technologies,Inc Filing of Application for Transfer of Licenses R-38 & R-67 from Ga Co ML19209B6261979-10-0101 October 1979 Submits Design Criteria for Removeable Adge Absorber Rod Re Tab Stress Analysis for Alternate Absorber Matl Control Blade Test Program ML19249B5901979-08-27027 August 1979 Forwards Addl Clarification of Uncertainty Re Neutron Effective Void Correlation Discussed in 790430 & 0719 Ltrs ML19241A9541979-06-29029 June 1979 Submits Info Requested by NRC Re Control Sys Characteristics for Use in Transient Simulations.Control Sys Characteristics Not Required for Evaluation of Flux & Pressure Response for Turbine Trip Experiments ML18043B1451979-03-20020 March 1979 Forwards Proprietary Rept NEDE-23749-1-P, Comparison of Analytical Model for Computing Safety Relief Valve Discharge Line Transient Pressures & Forces to Monticello T-Quencher Test Data. Withheld (Ref 10CFR2.790) ML20150E4231978-12-15015 December 1978 Forwards Current Physical Security Plan in Compliance W/Regs,Classified as Natl Security Info Pursuant to Certain DOE Requirements.Requests That Earlier Copies Be Destroyed,And New Copies Be Withheld ML20062B3091978-10-19019 October 1978 Responds to NRC Re Benchmarking PTSBWR/2 Code Against Present Data & Verifying Transient & Stability Tests.Data to Be Supplied in Oct 1979 Will Satisfy Requests. GE Proprietary Info Must Be Provided ML20062E6851978-10-17017 October 1978 Provides Results of Test on Facility at End of Cycle 2 Conditions Using Proposed Licensing Basis Odyn Model ML20062E6901978-10-17017 October 1978 Transmits Calculational Results & Data Related to Staff'S Review of Odyn Transient Model.Info Incl Calculations Performed to Quanitfy Effects of Stuck Rod on Scram Reactivity & Series of Figures as Delta K Versus % Voids ML20062E6921978-10-17017 October 1978 Forwards Results of Studies Carried Out in Effort to Determine Reason Behind Apparent Discrepancy Between BNL & GE Void Reactivity Feedback Models ML20062B3011978-09-15015 September 1978 Forwards RO on 780831 ML20086K4981974-06-17017 June 1974 Suppls 740612 & 17 Telcons Re 740611 Radioactive Matl Lung Dispositions.Caused by Glove Failure in Pu Operations Glovebox.Individual Will Be Lung Counted No Later than 740628.Bioassay Samples Collected 1990-07-19 |
Text
_ _ _ - _ _ _ _ _ _ _ .
(\ G s t q t n - ' !r:
LJi .e;iu ..
.. .u . ~ . - z. ; z a _ _;;_ . u_ u _ u ;_.,x w u a .:
i GENERAL ATOMIC COMPANY P.o BOX B100e SAN DIEGo, CALFoRNIA 92138 In Rep 1Y (muss sooo -
December 15, 1978 Refer To: 696-1007 .
1 Director of Nuclear Reactor Regulation l U.S. Nuclear Regulatory Commission j 1
Washington, D.C. 20555 !
I~
Ref. a: General Atomic Letter ARL-482, dated 10/11/74 to Karl R. Goller, NRC.
l b: AEC Letter from Karl R. Goller, Docket Nos. 50-89, 50-163 and 50-227, dated 12/5/78, to General Atomic Company. ]
l
Subject:
Security Plan Transmittal (3 copies).
Gentlemen: l General Atomic Company submitted, ref. a, revised Security Plan covering its research reactor facilities. We were subsequently advised, ref. b, that the plan met the requirement of 10CFR50.34(c) and 10CFR73.40 and was approved. )
We were made aware that primary responsibility for the content and format of our plan rested with the office of Nuclear Material Safety & Safeguards. From this we believed that future changes, approvals, etc., were to be communicated with that office. With diligence the method was followed.
Following a recent inspection we have learned that the above practice is not i now judged adequate since we have not under separate cover notified NRR of changes to our Security Plan.
l l
To assure compliance with the re.gulation we have agreed to submit three copies j of the current Security Plan and will provide NRR with future changes and/or requests for changes to the plan.
Please note that the GAC Physical Security Plan is now classified as " National q Security information" pursuant to certain DOE requirements. We request there- 1 fore that you destroy all of the earlier plan versions submitted to you and i that you protect the enclosed plans accordingly. Please confirm to us of the disposition of the earlier plan versions.
Very truly yours is *! CW" William R. Howry Licensing Administrator Nuclear Materials Control Division g ;
Enclosure:
Security Plan (3 copie;} -
7812190IQ NATIONAL SECURITY
! When separated from en;bsures, handle ~ INFORMATION l this document as UNCLASSIMED, 7 d{ n,.
T-j L
n Unauthorized Disclosure crinwnal sanctions.