ML20150E246
| ML20150E246 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 11/22/1978 |
| From: | Boyer V PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-78-12, NUDOCS 7812110213 | |
| Download: ML20150E246 (2) | |
Text
_
M PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHIA, PA.19101 (215) e41 4 500 gg h,ovember 22, 1978 m, m..o n,,,
Mr. Boyce R.
Grier Director, Region I Office of Inspection & Enforcement U.
S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
SUBJECT:
NRC Region I Letter Rted November 29, 1978 i
RE: IE Bulletin No. 78-12 " Atypical Weld, l
Material in Reactor Pressure Vessel Welds l
Limerick Generating Station, Units 1 & 2 Docket Nos. 50-352 and 50-353 FILE:
GOVT 1-1 (IE Bulletin 78-12) l
Dear Mr. Grier:
l This is in response to you" letter of September 29, 1978, which forwarded I.
E. Bulletic 78-12.
This bulletin requests information concerning reactor vessel weld materials and reactor vessel fabrication and suggests that the information search be performed by the reactor pressure vessel manufacturer.
l l
l The licensee's source for the information requested is l
through General Electric Company, our nuclear steam system supplier.
The General Electric Company advises us this l
request is for a substantial amount of detailed shop infor:rtticn and estimates completion of this task will require six man months per vessel.
General Electric Company has proposed to the NRC staff, by a conference call on November 8, 1978 (W. Cohn GE, R.
Brugge GE, and E.
Jordan NRC, W. Rutherford NRC), that the most effective and expeditious method of providing the information is on a generic basis by vessel manufacturer.
We are actively involved in keeping ourselves abreast of the communications between General Electric Company and the NRC staff in order to resolve the request for i dormation in the most appropriate and expediticus manner.
7812110%I3
Mr. Boyce R.
Grier - (cont.)
Page 2 Our schedule for satisfying your request will be forwarded to you following resolution of the General Electric Company proposal.
If you have any questions on this matter, do not hesitate to contact us.
l l
l l
Very truly yours,
[/
,9 3 ~7J. c m
(
V.
S. Bover l
l PAT /dh17/1 Copy to:
United States Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D. C.
20555 l
1 l
l l