ML20150E164

From kanterella
Jump to navigation Jump to search
Advises That Mark I Containment Prog GE Rept, NEDE-23898-P, Analytical Model for Computing Water Rise in a Safety/Relief Valve Discharge Line Following Valve Closure Has Been Transmitted to Nrc.Should Be Included on Subj Facil Dkt
ML20150E164
Person / Time
Site: Pilgrim
Issue date: 11/30/1978
From: Andognini G
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
78-198, NUDOCS 7812110166
Download: ML20150E164 (1)


Text

~ '.

BOSTON EDISON COMPANY DENERAL orriCEs Boo BOYLSTON STREET B O ETO N. M AB B ACN U S ETTB D2199 G. CARL ANDDONINI MANADER NUCLEAR OPER ATIQNS DEPARTMENT November 30, 1978 BECo. Ltr. #78-198 Mr. Thomas A. Ippolito, Chief Operating R. actors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293 Mark I Conta..

rogram General Electric Report "NELw 23898-P, Analytical Model For Computing Water Rise In a Safety / Relief Valve Discharge Line Following Valve Closure"

Dear Sir:

The subject report has been transmitted to the NRC by General Electric via L. J. Sobon's letter to V. Stello dated October 31, 1978.

This report de-scribes an analytical model that computes the water rise in a safety / relief valve (SRV) discharge line subsequent to SRV closure and was provided as part of task 7.1.2.2 of the Mark I Containment Program.

The report NEDE-23898-P should be included on the Pilgrim Nuclear Power Station docket.

Very truly yours, l

Mt U

$*?

t 7812110166 hC