ML20150E164
| ML20150E164 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 11/30/1978 |
| From: | Andognini G BOSTON EDISON CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| 78-198, NUDOCS 7812110166 | |
| Download: ML20150E164 (1) | |
Text
~ '.
BOSTON EDISON COMPANY DENERAL orriCEs Boo BOYLSTON STREET B O ETO N. M AB B ACN U S ETTB D2199 G. CARL ANDDONINI MANADER NUCLEAR OPER ATIQNS DEPARTMENT November 30, 1978 BECo. Ltr. #78-198 Mr. Thomas A. Ippolito, Chief Operating R. actors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License No. DPR-35 Docket No. 50-293 Mark I Conta..
rogram General Electric Report "NELw 23898-P, Analytical Model For Computing Water Rise In a Safety / Relief Valve Discharge Line Following Valve Closure"
Dear Sir:
The subject report has been transmitted to the NRC by General Electric via L. J. Sobon's letter to V. Stello dated October 31, 1978.
This report de-scribes an analytical model that computes the water rise in a safety / relief valve (SRV) discharge line subsequent to SRV closure and was provided as part of task 7.1.2.2 of the Mark I Containment Program.
The report NEDE-23898-P should be included on the Pilgrim Nuclear Power Station docket.
Very truly yours, l
Mt U
$*?
t 7812110166 hC