ML20150D670

From kanterella
Jump to navigation Jump to search
Amend 16 to License NPF-43,revising Tech Spec 3.6.3-1 to Delete Isolation Valves T50-F406A & T50-F406A,from Primary Containment Monitoring Sys Used to Monitor Hydrogen & Oxygen Concentrations in Containment Dyrwell During LOCA
ML20150D670
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/21/1988
From: Virgilio M
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20150D673 List:
References
NUDOCS 8803250010
Download: ML20150D670 (5)


Text

,

a rewg'o m

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

3 3

E WASHING TON, D. C. 20555

/

DETROIT EDIS0N COMPANY

~

WOLVERINE POWER SUPPLY COOPERATIVE, INCORPORATED DOCKET N0. 50-341 FERMI-2 AMENDMENT 10 FACILITY OPERATING LICENSE e

Amendment No. 16 License No. NPF-43 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by the Detroit Edison Company (the licensee) dated February 4,1986, as supplemented June 7,1986, and July 13, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regalations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of j

the Commission's regulations and all applicable requirements have been l

satisfied.

l 2.

Accordingly, the license is amended by changes to the Technical Specifica-tions as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-43 is hereby amended to read as follows:

Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.16, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

DECO shall operate the facility in accordance with the Teconical Specifications and the Environmental Protection Plan.

8803250010 880321 PDR ADOCK 05000341 P

PDR

'l,a 3.

This license amendment'is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION q

/

Mart n J. Vir i M,

rector Pro' ct' Direc rat II

  • isiin of acto Projects - III, IV, V

& Spe '

Projects

Attachment:

Changes to the Technical Specifications Date of Issuance:

March 21, 1988 i

I ATTACHMENT TO LICENSE AMENDMENT NO.16 FACILITY OPERATING LICENSE N0. NPF-43 DOCKET N0. 50-341-Replace the following page of the Appendix "A" Technic &1' Specifications with the enclosed page.

The revised-page is identified by Amendment number and contains a vertical line indicating the area of change.

The. corresponding overleaf page is also provided to maintain document completeness.

REMOVE INSERT 3/4 6-31 3/4 6-31 t

l l

4 1

_ _.. -,, _,, ~,,,...,.

r l

g TABLE 3.6.3-1 (Continued)

E PRIMARY CONTAIME!n ISOLATION VALVES e

g MAXIMUM ISOLATION TIME VALVE FUNCTION AND NUMi?".

(Seconds)

I 8.

Remote-Minual Isolation Valves *) (Continued) 19.

Primary Containment Monitoring System Torus Suction Isolation Valves NA Division I:

T50-F407A Division II:

T50-F407B 20.

Drywell Atmosphere Sample Isolation Valves NA Division I:

T50-F401A T50-F402A T50-F403A R

T50-F404A

[

T50-F405A J

j Division II:

T50-F4018 e

T50-F4028 T50-F4033 T50-F404B T50-F4058 1

21.

Drywell to Suppression Chamber Vacuum Breakers N Supply Isolation Valves 2

T48-F416 g

T48-F417 T48-F418 3

g T48-F419 T48-F420 T48-F421 g

T48-F422 T48-F423 g

T48-F424 2

T48-F425 T48-F426 T48-F427 6.q i

TABLE 3.6.3-1 (Continued) n PRIMARY CONTAINMENT ISOLATION VALVES MAXIMUM cIf ISOLATION TIME

]

VALVE FUNCTION AND NUMBER (Seconds) 8.

Remote-Manual Isolation Valves ') (Continued)

I 22.

Drywell Pressure Instrumentation Isolation Valves NA Division I:

T50-F420A Division II:

T50-F4208 23.

Suppression Pool Level Instrumentation Isolation Valves NA Division I:

E41-F401(b)I) ti T50-F412A E41-F400 m

E41-F403(ff) l Division II:

T50-F412B E41-F402 24.

EECW Supply to Drywell Equipment Isolation valves NA Division I:

P44-F607A Division II:

P44-F606B 25.

EECW Return from Drywell Equipment Isolation Valves NA Division I:

P44-F606A P44-F616 Division II:

P44-F6078 P44-F615

-