ML20150D092
| ML20150D092 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 11/27/1978 |
| From: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7812040196 | |
| Download: ML20150D092 (1) | |
Text
.
l GE Nf.R AL OF F ICL P, o, t3O X 499, COL UM BUS, N L B R ALK A 68601 l
Nebraska Publ.ic Power District Tou w om so m ensu 1
a w =waan=m:
:.w =
x,
+a
~-
=
=
oms November 27, 1978 I
Director, Nuclear Reactor Regulation Attention:
Mr. Thomas A. Ippolito, Chief Operating Reactors Branch No. 3 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
General Electric Report "NEDE-23898-P, j
Analytical Model for Computing Water Rise in a Safety / Relief Valve Discharge Line Following Valve Closure" Cooper Nuclear Station NRC Docket No. 50-298, DPR-46
Dear Mr. Ippolito:
The subject report was transmitted to the NRC by the General Electric Ca. by letter from L. J.
Sobon to V. Stello dated October 31, 1978.
This report describes an analytical model that computes the water rise in a safety / relief valve (SRV) discharge line subsequent to SRV closure and was provided as part of task 7.1.2.2 of the Mark I Containment Program.
Since portions of the subject report will be utilized in support of the Cooper Nuclear Station containment evaluation program, we would like to request that the subject report, NEDE-23898-P, be included on NRC Incket No. 50-298 for Cooper Nuclear Station.
Should you have any questions or comments relative to the above, please do not hesitate to contact me.
Sincerely, M
Jay el. Pilant Director of Licensing and Quelity Assurance
/cmk
/Y D
s@
mm