ML20150C585
| ML20150C585 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 06/13/1988 |
| From: | Lentine F COMMONWEALTH EDISON CO. |
| To: | Bradley Davis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 4790K, NUDOCS 8807120545 | |
| Download: ML20150C585 (5) | |
Text
..
N) Commonwealth Edison
[ '
One First National Plaza Chicago, IUinois
,}'u
] A33rass Reply to: Post Offc3 Box 767 n,/ Chicago, Illinois 60690 0767 June 13, 1988 Mr. A. Bert Davis:
Regional Administrator U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL. 60137
Subject:
Zion Nuclear Power Station Units 1 and 2 Response to IE Inspection Report Nos.
50-295/87-034 and 50-304/87-035 NRC Docket Nos. 50-295 and 50-304
Reference:
(a) May 25, 1988 letter from H.E. Bliss to A. Bert Davis (b) April 8, 1988 letter from H.J. Miller to Cordell Reed
Dear Mr. Davis:
This letter provides additional detail regarding the implementation schedules for certain corrective actions described in reference (a).
This information was discussed in a telephone call with Mr. J. Holmes of your staff en June 10, 1988.
(1)
Installation of NFPA approved fire pump controller.
A schedule of significant milestones for this project is provided in Attachment A.
The limiting factor in the overall schedule is the procurement of the approved controller.
(2)
Installation of additional emerger.cy lights.
A schedule of significant milestones is provided in Attachment B.
All design work associated with this project has been completed.
Installation will be prioritized as follows:
(a)
Areas for which no lighting had previously been provided (MS valve house).
(b)
Areas for which previously installed lighting requires enhancement.
8807120545 0
% 95 PDR ADOCK 0 PNU QUN t 51953]
[b
3 f
a c
. ~
(c)
Like-for like replacement of previously installed' lighting (for~the purposes of standardization and improved reliability).
It is expected that a significent portion of thIs work will be:
completed prior to the' Fall, 1988 Unit 2 outage.
- (3) ~
' Submittal of updated FHA /PSAR and technical specification
- changes, y
A schedule of significant milestones is providedlin Attachment c.
Although reference (a) indicated that the submittal would be provided as part of the June, 1989 annual PSAR update, it can be seen from Attachment c that a draft submittal will be available by December, 1988. Toj facilitate the review process, this draft willlbe provided to the imc at that time, prior to the completion of.the formal on-site and off-site reviews that are~ required by the technical specifications for such submittals.
please address questions regarding these items to this office.
Very truly yours, F. G. Lentine PWR Licensing Supervisor
/klj att.
cc: Zion Resident Inspector J. Norris (NRR) 4790K l
I
}
~
A TTMHistENT A Pfumer msauvrrm : (FIRE WMP O2TmOLLER)
DISIALL NFPA APPPOVED FIRE RNP CONEOLLER 'IO MEEP 1977 LICENSDC CCM41'IME27f IPQ7ECT f 7920-81 }OD # M-22-0-87-13 grA'Ius OtxPIzrIm nwis
- 2. ISSUED Plu7ECT PIRI (PP) I (PRELIMDERY) 03/04/88
- 3. KICK-OFF MEEPEG 03/23/88
- 4. PP I (FDaL) 04/08/88
- 6. ISSUE PP II (PRELIMDERY)
IATER*
- 7. CECD EURWASE OF FIRE EudP CDUIROLIE1 IATER
- 8. VDIDOR ISSUE EPAWHIGS 'IO S&L IATER*
- 9. ISSUE TAWHIGS FOR CONDE IATER*
- 13. RESOLVE CECD CDNDTTS IATER*
- 11. ISSUE TAWDGS FOR C0i'.SIEUCTICH & PP III IATER*
COMMENT.S W PAE VI'US
@g7ADLLEK VEdboA Mks )?EMeVED FADM ApppovED
/3/PPE/5 Lzsr NEW VEMDCA Hes PEEM L ocA RED,
PtifuMJE ORDEf 70 GE
.xssvEb By 4/30/99
//E W VENDOA
/M.S PR**risco g, - toEgg
- DElivspy, REs'OLv5D. AL7*E/?/WE j
- Et#,ravph,
i t
CDMI'INERIS 'ID 'IHE NRC :
{
- 1. }DDIFICATION WILL BE DISTALIED BY MARCH 1989, CDTTINGDir cN erra4Dir DEtIvERY l
1 i
i l
J l
~
A rrAc&uwr,e PinTECP IESuuFnOi : (EMERGDICY LIGfrDU)
DISIALL ADDITIGE IWITERY 10WERED DC EMERENCY LIGfIS PROJECP i 7920-58 POD f M22-0-87-24 E2GIlS.__I G3G'IEPIN IRIE
- 1. ISSUED PROJECT PINI (PP) II (PRELIMINARY) 02/26/88
- 2. ISSUED EEAWDES FOR CmMDir 03/25/88
- 3. ISSUE PP II (FDIAL) 04/15/88
- 3. RESOLVE CECO Cm MENIS 04/20/88
- 4. ISSUE ERAWDES FOR CDtISIEUCTICN 04/28/88
- 6. ISSUE PP III 05/11/88
- 7. DISTALIATICH WAIEOWN IATER COMENTS
/+90PIF/C1 M A/ /MS ggfg A Np0Vfp PR 3NS 74LLA770W.
AEfA3 /YAG B ffsf PaloR/7/2ED.
A fu,9sy:;9N774L. lbh'I/0^'
dF THE WDRK W/LL BE co.xPLE rrp psion To 7Hr FALL, /986
$UTAGE, CD9frIMENIS 'IO ' HIE NRC :
A1AgC// 3/j /98?'
- 1. IODIFICATIQi WILL BE DISTALIED BYN
- 2. VERIFICATIQi WAllTCHI WILL BE PERIGMED EDLINDE CmPIEPIGi OF STEP 1 (DISTAIIATICN)
,.r Y'.
'/
A TTAC///*1EN T*
C
\\
\\
\\
PY17ECP IESCRIPPION _: (E%)
UPDNrE 'DE FEA TO REEU:Cr ACIUAL PIANT CONDITImS AND/OR PREVICUSLY APPROVED CDNFIGURATICNS. DKDRPORATE APP.A FIRE AREA BJUNDARY DRAWHIGS & NFPA CDDE DEVIATICH REPORT l
i PFOJECP i 8054-04 CmPIEFICN srNIUS :
DNIE
- 1. DKEGORATE APP.A TIRE AREA TAWDiGS 05/30/88
- 2. PEREORM FIEID WAUCCRT 06/17/88
- 3. INCORBJRATE NFPA CDDE DEVIATICli 06/30/88
- 4. UPDNrE CHWSTIBIE ICADDIGS 08/31/88
- 5. ISSUE i<Elu<f FOR COMEtTPS 09/30/88 j
- 6. RESOLVE CI2EEtTPS 10/31/88
- 7. CECO SUNITIAL 'IO DE NRC 11/30/88 pg#T (CPMENTS PRAF T sveMITTAL witL. BE PAcv'IDSP FA/CK TO CDMPL ET10Al Df [CAbfAL OAlS/TE. /tA/D WfS/75 AfVISWO A'EQv/ RED A/
TELN SPEC's,
CmMrINENIS 10 UE NRC :
- 1. EEA UPDNTE SUNITIAL WILL BE PPOVIDED BY DECEMBER 1988 pgAfI j