Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M8771999-10-25025 October 1999 Requests That Industry Studies on long-term Spent Fuel Pool Cooling Be Provided to R Dudley at Listed Mail Stop ML20217M4331999-10-19019 October 1999 Submits Rept 17, Requal Tracking Rept from Operator Tracking Sys. Rept Was Used by NRC to Schedule Requalification Exams for Operators & Record Requal Pass Dates ML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217C7321999-10-0808 October 1999 Forwards Copy of Seabrook Station Videotape Entitled, Completion of Seal Barrier Installation. Videotape Documents Process of Selecting,Designing & Installing Seal Deterrent Barrier to Preclude Entrapment of Seals ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212J8271999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Seabrook Station. Staff Conducted Reviews for All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility Over Next Six Months.Plant Issues Matrix & Insp Plan Encl ML20216J2381999-09-30030 September 1999 Responds to Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Nrc Expects All Licensees to Operate Nuclear Facilities Safety IAW NRC Regulations & Requirements ML20216J2421999-09-30030 September 1999 Responds to Card Received in Aug 1999,providing Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20216J2471999-09-30030 September 1999 Responds to Which Provided Comments on NRC Interim Enforcement Policy Re Enforcement Discretion for Nuclear Plants During Y2K Transition.Informs That Naesc Reported Seabrook as Y2K Ready Prior to 990701 ML20212K7921999-09-30030 September 1999 Confirms 990922 Telcon with J D'Antonio & T Grew Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Seabrook Facility ML20212J0301999-09-24024 September 1999 Forwards Insp Rept 50-443/99-10 on 990726-30 & 0809-13.No Violations Noted.Insp Discussed ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212C1881999-09-20020 September 1999 Ack Receipt of Which Raised Concerns Re NRC Enforcement Actions at Plant & Issuance of NCVs ML20212D1401999-09-17017 September 1999 Forwards SE Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20212B5021999-09-14014 September 1999 Forwards Licensee Responses to EPA Questions Re Plant Seal Deterrent Barrier.Util Completed Installation of Subject Barriers on All Three Station Offshore Intake Structures on 990818.Barriers Will Preclude Entrapment of Seals ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts DD-99-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 9909021999-09-0202 September 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-10) Expired.Commission Declined Review & Decision Became Final on 990830.With Certificate of Svc.Served on 990902 ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211J0401999-08-26026 August 1999 Responds to 990819 Request,On Behalf of Gr Pageau & Williams Power Corp,For Addl Time in Which to Reply to Nov,Issued on 990803.Response Due to NRC by 991008 ML20211H0651999-08-25025 August 1999 Forwards Insp Rept 50-443/99-05 on 990621-0801.One Violation Re Failure to Include Multiple Components within Scope of ISI Test Program Was Identified & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211F2681999-08-19019 August 1999 Discusses Former Chairman Jackson & 990602 Predecisional Enforcement Conference Re Findings of Ofc of Investigations Involving Allegations Raised by Contract Electrician.Determined That Allegations Not Supported ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20210T1601999-08-13013 August 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev,supp1 1, Reactor Vessel Structural Integrity, NRC Revised Info in Reactor Vessel Integrity Database & Is Releasing It as Rvid Version 2 ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S9611999-08-13013 August 1999 Informs That NRC Received Encl Ltr from Pb Johnston Expressing Concern About Certain Impacts on Shareholders of New England Electric Sys with Respect to Nees Proposed Merger with Natl Grid Group ML20210S9511999-08-13013 August 1999 Responds to to Collins Expressing Concerns with Certain Terms of Proposed Merger Between New England Electric Sys & National Grid Group.Nrc Has No Authority to Interject Itself in Nees Merger with National Grid Group ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210S7331999-08-11011 August 1999 Submits Third Suppl to 980423 Application to Renew NPDES Permit NH0020338 for Seabrook Station.Suppl Provides Addl Info on Input Streams & Requests Increased Permit Limit for Chemical Used in Makeup Water Treatment Sys ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210Q7441999-08-11011 August 1999 Forwards Order Approving Indirect Transfer of Control of Canal Interest in Seabrook Station Unit 1 as Requested in Application & SER ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210N9421999-08-0505 August 1999 Informs That North Atlantic Suggests Listed Revisions to 990730 Draft Revisions to Committee Rept & Order.Further Revs Consistent with What North Atlantic Proposed at 990608 Hearing ML20210N5721999-08-0303 August 1999 Discusses Investigations Rept 1-98-005 Conducted by OI at Naesco,Seabrook Station & Forwards NOV & Proposed Imposition of Civil Penalty - $55,000.Violation Re Failure to Promptly Correct Incorrectly Terminated Cables of Control Bldg Air ML20210P3361999-08-0303 August 1999 Discusses Investigation Rept 1-98-005 Conducted by Region I OI at Naesco,Seabrook Station & Forwards Nov.Violations Re Electrical Wiring in Control Panel for Control Bldg Air Conditioning Sys ML20210P3161999-08-0303 August 1999 Discusses Investigation Rept 1-98-005,conducted Between 980129 & 0527 at Seabrook Station & Forwards Nov.Violation Re Discrimination of Williams Power Corp,Contractor of Naesco,Against Electrician for Raising Safety Issues 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F5841999-10-13013 October 1999 Requests Revocation of License OP-11038-1 for GE Kingsley. Individual Has Been Reassigned to Position within Naesco ML20217F5811999-10-13013 October 1999 Forwards Insp Data & Naesco Evaluation of a EDG Exhaust Insp Conducted on 990407.Insp Ensured That Unacceptable Wall Thinning Will Not Occur During 40-year Design Lifetime of Sys ML20217B8621999-10-0505 October 1999 Forwards Rev 28,change 1 to EPIP Er 1.1, Classification & Emergencies, Per 10CFR50.54(q).Rev to Procedure Does Not Decrease Effectiveness of Seabrook Station Radiological Emergency Plan ML20217B7471999-10-0101 October 1999 Provides Notification of Change in PCT of More than 50 F,Per Requirements of 10CFR50.46(a)(3)(i),(ii).Tabulation of Large Break LOCA PCT Margin Utilization Applicable to Seabrook Station,Encl ML20212G5071999-09-21021 September 1999 Submits Complaint to NRC Re NRC Failure to Cite Seabrook Station NPP Operators for Failing to Periodically Calibrate & Establish Adequate Measures to Insure That Relay Equipment Met All Required Calibration Settings Prior to Installation ML20212B9511999-09-17017 September 1999 Forwards NRC Form 396 for MG Sketchley,License SOP-10685, Along with Supporting Medical Exam Info.Nrc Form 396 Has Been Superceded by Revised Version Dtd 971222,which Was Previously Submitted to NRC on 990812.Encl Withheld ML20212C3621999-09-15015 September 1999 Forwards Rev 34 to Seabrook Station Radiological Emergency Plan & Rev 85 to Seabrook Station Emergency Response Manual, Per 10CFR50,App E & 10CFR50.4 ML20211Q8521999-09-0808 September 1999 Informs That Rl Couture,License SOP-11027,terminated Employment at Naesco on 990907.Revocation of License Requested ML20211N8781999-09-0303 September 1999 Forwards Response to 990820 RFI Re NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211M3221999-09-0202 September 1999 Responds to NRC Re Violations Noted in Insp of License NPF-86 & Proposed Imposition of Civil Penalty. Corrective Actions:Conducted Prompt Review of Layoff Decision to Determine Relevant Facts ML20211J8411999-09-0101 September 1999 Forwards Updated NRC Form 396 for E Decosta,Nrc License OP-10655-1.Without Encl ML20211J8811999-09-0101 September 1999 Forwards Comments on Seabrook Station Review of Reactor Vessel Integrity Database (Rvid)(Version 2).Minor Discrepancies Were Noted.Proposed Changes Are Encl in Order to Correct Discrepancies ML20211G9191999-08-27027 August 1999 Informs NRC That Name of New Company, Ref in Order Approving Application Re Corporate Merger Is Nstar Which Is Massachusetts Business Trust ML20211G7761999-08-24024 August 1999 Expresses Great Concern Re Lack of Enforcement Actions Against Seabrook Station Despite Citations NRC Has Issued for Violations of Seabrook Operating License ML20211J2171999-08-23023 August 1999 Expresses Disappointment with Lack of Enforcement Action Against Seabrook Station Despite Repeated Safety Violations ML20211J4971999-08-21021 August 1999 Submits Comments Re Violations Cited in Early Mar & 990509 Insps ML20211H8361999-08-19019 August 1999 Submits Concerns Re Violations at Seabrook Station ML20211J3241999-08-15015 August 1999 Expresses Disappointment in Apparent Failure of NRC to Cite Seabrook Station NPP for Recent Violations of Safety Regulations Uncovered During Recent Insps in Mar & May ML20211J1831999-08-15015 August 1999 Submits Concerns Over Serious Deficiencies at Seabrook Station That NRC Has Declined to Take Enforcement Actions Against ML20211J2071999-08-13013 August 1999 Expresses Concerns Re Violations Occurring Recently at Seabrook Nuclear Power Station.Requests Effort to See That Measures Taken to Stop Flagrant,Continuing Violations That Hold Danger to Workers & Community ML20210S2001999-08-12012 August 1999 Forwards NRC Forms 398 & 396 in Support of Applications for Renewal of Operator Licenses for Individuals Listed Below. Without Encls ML20210R8401999-08-11011 August 1999 Forwards Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves ML20210R9581999-08-11011 August 1999 Forwards ISI Exam Rept of Seabrook Station, for RFO 6, Period 3,for Insps Conducted Prior to & During Sixth Refueling Outage Concluded on 990510 ML20210R7931999-08-10010 August 1999 Forwards Cycle 7 Startup Rept for Seabrook Station, IAW Requirements of TS 6.8.1.1 ML20210K3281999-07-30030 July 1999 Forwards Response to NRC RAI Re License Amend Request 98-17. North Atlantic Concurs with Staff That Bases Should State That Maintaining ECCS Piping Full of Water from RWST to Reactor Coolant Sys Ensures Sys Will Perform Properly ML20210H8991999-07-27027 July 1999 Forwards Tabulation of Current LBLOCA & SBLOCA Peak Clad Temp Margin Utilization Tables Applicable to Seabrook Station ML20210H0921999-07-27027 July 1999 Forwards Naesc Semi-Annual Fitness-for-Duty Rept,Jan-June 1999, Per 10CFR26.71(d).Rept Includes Data from 990101- 0610 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options ML20210A2521999-07-15015 July 1999 Forwards Rev 33 to Seabrook Station Radiological Emergency Plan & Rev 84 to Seabrook Station Emergency Response Manual ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1351999-07-0909 July 1999 Forwards Relief Request Re Repair Welding on SA-351 Matl to Be Installed in Seabrook Station SW Pumps & SW Cooling Tower Pumps ML20209D2871999-07-0606 July 1999 Submits Response to NRC AL 99-02,re Numerical Estimate of Licensing Actions Expected to Be Submitted in Fy 2000 & 2001.Schedule Does Not Include Activities Which Meet AL Definition of Complex Review ML20209C9021999-06-30030 June 1999 Provides Revised Distribution List for Seabrook Station Correspondence to Reflect Current Organization ML20196G2391999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant Encl ML20196G3381999-06-23023 June 1999 Forwards LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20195J0981999-06-17017 June 1999 Forwards Responses to Questions Posed in Re Application of New England Power Co for Transfer of Control of Licenses NPF-49 & NPF-86.Copy of 1998 Schedule 13G, Included,As Requested ML20196D0561999-06-16016 June 1999 Forwards Certified Copy of Endorsements 77 & 78 to Nelia to Policy NF-0296 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195J1221999-06-15015 June 1999 Forwards Addl Clarifying Info to Suppl Info Provided at 990602 Predecisional Enforcement Conference at Region I. Proprietary Declarations by Util Employees to Correct Inaccuracies Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210K4971999-06-15015 June 1999 Forwards Copy of Ltr from Concerned Constitutent AC Menninger from Franconia,Nh to Senator Smith Re Seabrook Nuclear Power Station Y2K Readiness ML20195E9731999-06-0707 June 1999 Forwards Rev 32 to Seabrook Station Radiological Emergency Plan & Rev 83 to Emergency Response Manual ML20206T4201999-05-20020 May 1999 Forwards Certified Copies of Resolution Adopted by Shareholders of National Grid Group Approving Acquisition of New England Electric Sys & Vote of New England Electric Sys Shareholders Approving Merger with National Grid Group ML20196L2001999-05-0707 May 1999 Forwards Rev 01-07-00 to RE-21, Cycle 7 COLR, Per TS 6.8.1.6.c ML20206K4301999-05-0707 May 1999 Forwards Copy of Corrective Order of Notice by State of Nh Nuclear Decommissioning Financing Committee ML20206J3321999-05-0505 May 1999 Forwards Tabulation of Number of Tubes Plugged in Each of Two SGs Inspected During Sixth Isi,Per Plant TS SR 4.4.5.5a. Sixth ISI Was Completed on 990420 ML20206J3341999-05-0505 May 1999 Informs That on 990501,ISO New England & New England Power Pool Implemented Restructured Wholesale Electricity Market. Summary of Util Action as Result of Implementation of Subject Market,Encl ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206G4371999-04-30030 April 1999 Forwards 1998 Annual Environ Operating Rept for Seabrook Station.Encl Rept Is Summary of Implementation of EPP for Period of Jan-Dec 1998 ML20206H4801999-04-30030 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Seabrook Station. Listed Info Provided in Encls 1999-09-08
[Table view] Category:VENDOR/MANUFACTURER TO NRC
MONTHYEARML20246E0451989-06-23023 June 1989 Requests That Proprietary WCAP-12305, Evaluation of Thermal Stratification for Seabrook Unit 1 Pressurizer Surge Line, Be Withheld,Per 10CFR2.790(b)(4) ML20244D2091989-04-0707 April 1989 Requests That Encl Proprietary Suppl 1 to WCAP-12151, Addl Info in Support of Assessment of Thermal Stratification for Seabrook Unit 1 Pressurizer Surge Line Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20150C5661988-03-11011 March 1988 Forwards Nonproprietary Version of WCAP 11765 Re Steam Generator Tube Plugging Margin Analysis,In Response to New England Coalition on Nuclear Pollution Motion Seeking Production & Disclosure of Rept.W/Certificate of Svc ML20236W3451987-10-26026 October 1987 Forwards Ltr Sent to Plant Requesting Mr Moe'S Package Store Be Removed from List of Potential Shelters in Beach Areas Near Plant.Discrepancies Author Found Listed in Encl Ltr. Served on 871026 ML20235Y0871987-10-14014 October 1987 Forwards Revised Correcting Date in First Paragraph ML20154R9651986-01-29029 January 1986 Authorizes Utilization of Accompanying Affidavit by Public Svc of New Hampshire Re Request for Withholding Proprietary Info from Public Disclosure (Ref 10CFR2.790) Per Ltr Dtd Feb 1986 ML20100A8751984-11-13013 November 1984 Requests Withholding of Proprietary Response to NRC Request for Addl Info Re RCS Flow Measurement Uncertainty (Ref 10CFR2.790) ML20094N7451984-06-0707 June 1984 Requests Withholding of Stated Proprietary Rept from Public Disclosure (Ref 10CFR2.790).Affidavit CAW-83-80 Encl ML20065A7931983-02-17017 February 1983 Forwards Responses to Containment Sys Branch Open Item SRP 6.2.8,per TMI Action Items II.E.4.2 & II.F.1.2.Responses Will Be Incorporated in OL Application,Amend 49 1989-06-23
[Table view] |
Text
Y
\g.62ff ECKERT SEAMANS CHERIN & MELLOTT 3 ATTORNEYS AT LAW 00f KEif 0 600 CRANT STREET. MTTSBURGH. PA 15219. dppo6*X)0 mEconus.m u-, m seu -,
g.
g _. ==,
:= == """'*88 ftAR 15 P3 l2EI:,== =:
:= === = = - =t
= : ~"""' =.- =:", llll:43':::;.
= 6" =:ellll"" - m E . .E i
./ ll".".".'="""* ll:=t =
.::"J % = ,"ll':ll'.
,,,, ", ,00CHE!)% '.c M ht "9 " n1. *::",'=.',. ==
. "4.':"ll'
. =l l."g::", "".".: ".". h ='.T
= * :lll"". "lllll".'.lllll. -m =ll't """ ".2,=,<.,
'",a" "O:'l
- ti'.:="
. =
',',
"" ===*==n " ' " " " "
~.
- l' ".=
=.=, = = -
"C
__.=.
- "',",t3ll"'
=_.~
=J .'".,4, =""""""" n'."i::::: lllllllt.'"lllll" ll=".'h"l'"'
llllll".t ". ',#. . O f' = r
. -- lll" *::llll" :""::".'.*::::'
C'M:ll". . :l" ".c."ll? J ,~.-- M'.:llllr :::';"= r' "
=.l,".'."."- - -
=
'.=* J .;-l L ll"J. llgl" 'lll"",""2:"::
gg March 11, 1988 Administrative Judge Sheldon J. Wolfe, Esq.
l Judge Emmeth A. Luebke Dr. Jerry Harbour Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washing ton , D.C. 20555 l
Gentlemen:
1 1 Re: In the Matter of Public Service Company of New Hampshire, et al. (Seabrook Station, Docket No. 50-443OL-1-[M, Units 1 and 2):
Onsite Emergency Planning & Technical Issues -
Westinghouse Proprietary Document As you are aware, the New England Coalition on Nuclear Pollution (NECNP) filed a motion in this proceeding against the Applicants seeking production and disclosure of a Westinghouse proprietary document, identified as Villasor, A. P., Jr. "Steam Generator Tube Plugging Margin Analysis for Seabrook Nos. 1& 2 i
Nuclear Power Plants", WCAP 10413 (Proprietary), Westinghouse Nuclear Energy Systems, Pittsburgh, Pennsylvania, November 1983. Westinghouse is furnishing a non-proprietary version of this report to the Applicants who, in turn, will provide a copy l
of that non-proprietary version to representatives of NECNP. For the convenience of the Board, we are enclosing with this letter for each Board member a copy of the non-proprietary version which bears the designation WCAP 11765.
8803210095 880311 PDR ADOCK 05000443 G PDR omtts s 18:e N STREET N h LN1VIR5 TTY OF NTTSBURCH ,' )
NORTN M ARkET SQUARE BUILDING APPL:ED RE5E ARCH CLNTER h A5H:NCTON D* C 2Nw t )l' 122 k!NG BOULEVARD HARRI> BURG PA 17101 %C2' 4521C. 4 140 nlLLIW NTT h Ai nTT5PL RGH PA Inas
]3y mn2nna i 412 ' s:6- 54 x
Messrs. Wolfe, Luebke and Harbour Atomic Safety and Licensing Board Panel March 11, 1988 .
At the time the proprietary document (WCAP 10413) was written in 1983, Westinghouse identified those portions of the document which were proprietary. Since no copy of the document, either proprietary or non-proprietary, was being furnished to the Nuclear Regulatory Commission or to anyone with whom Westinghouse did not have a non-disclosure agreement, a non-proprietary version of the document was not prepared at that time. After Westinghouse became aware of the Motion to Compel filed by NECNP seeking production of this document, Westinghouse re-reviewed the document to determine whether, and to what extent, the informa-tion previously identified in 1983 as proprietary in the document remained proprietary as of early 1988. That review was made against the standards and in accordance with the procedures long-established by Westinghouse for making determinations as to what constitutes proprietary information. As a result of this review, it was determined that approximately twenty-five percent of the information in the origina.1 document which had been identified as proprietary no longer was proprietary as of March 1988. Thus, the non-proprietary version (WCAP 11765) of the report which is being provided to NECNP and the Board reflects the results of this current review and assessment by Westinghouse.
As we stated in the Motion of Westinghouse Electric Corporation, Appearing Specially, for an Extension of Time dated February 22, 1988, the Applicants and Westinghouse remain willing to provide the proprietary version of the document to NECNP upon the signing of an appropriate non-disclosure agreement by NECNP. Signing such an agreement would be without prejudice to NECNP to contest before the Commission any questions which it seeks to raise as to production and disclosure of the document.
For the Board's information, we also are enclosing with this letter a copy of the proposed non-disclosure agreement which will be furnished by Westinghouse, through the Applicants, to NECNP.
As we understand the Board Order, which was read to us on the telephone on Wednesday, March 9, 1988, by the secretary to Judge Wolfe, there currently is no motion outstanding to compel production of the proprietary version of the Westinghouse report. We are hopeful that by furnishing the non-proprietary version of the report, NECNP will not have a need to seek the proprietary version. We also are hopeful that if NECNP still desires to review the proprietary version of the report after it has reviewed the non-proprietary version, its representatives will be willing to sign the non-disclosure agreement which would enable us to furnish the document to them without further delay. However, if NECNP subsequently decides to file a motion
Messrs. Wolfe, Luebke and Harbour Atomic Safety and Licensing Board Panel March 11, 1988 to compel against Westinghouse, we will, of course, respond at that time with the appropriate pleadings.
We also want to make the Board aware of the fact that if a Motion to Compel is filed, Westinghouse is prepared to verify by affidavit its proprietary determinationa with regard to the information identified in the report as confidential.
That affidavit will review the criteria which Westinghouse uses in making proprietary determinations, and will discuss .he appli-cation of those criteria to identify proprietary information in the report.
A copy of this letter is being served on the entire service list in this proceeding. Copies of the enclosures, however, are being furnished only to the Board, the NRC Staff, the Applicants, and through the Applicants to NECNP.
Very truly yours, l Barton Z. Cowan Counsel for Westinghouse Electric Corporation BZC:BB i Enclosures l cc: Service List
00LMEIEi:
UWkt Te Wa 15 P3 :27 CERTIFICATE OF SERVICE
.. I- '
OFF K . .
00CKEIN >'L'M I, Barton Z. Cowan, one of the attorneys forMWestinghouse Electric Corporation, hereby certify that on March 10, 1988, I made service of the within documents by mailing copies thereof, first class postage prepaid, to:
- Administrative Judge Sheldon J. Stephen E. Merrill, Esq.
Wolfe, Esq., Chairman Attorney General Atomic Safety and Licensing George Dana Bisbee, Esq.
Board Panel Assistant Attorney General U.S. Nuclear Regulatory Commission Office of the Attorney General Washington, D.C. 20555 25 Capitol Street Concord, NH 03301-6397
- Judge Emmeth A. Luebke Atomic Safety and Licensing *Dr. Jerry Harbour Board Panel Atomic Safety and Licensing 5500 Friendship Boulevard Board Panel Apartment 1923N U.S. Nuclear Regulatory Chevy Chase, Maryland 20815 Commission Washington, D.C. 20555
- Thomas G. Dignan, Jr., Esq.
Kathryn A. Selleck, Esq.
Deborah S. Steenland, Esq. Andrea C. Ferster, Esq.
Ropes & Gray Harmon & Weiss 225 Franklin Street Suite 430 Boston, MA 02110 2001 S Street, N.W.
Washington, D.C. 20009 Robert Carigg, Chairman Board of Selectman *Sherwin E. Turk, Esq.
Town Office Office of the Executive Legal Atlantic Avenue Director North Hampton, NH 03862 U.S. Nuclear Regulatory Washington, D.C. 20555 Atomic Safety and Licensing Board Panel Robert A. Backus, Esq.
U.S. Nuclear Regulatory Commission Backus, Meyer & Solomon Washington, D.C. 20555 116 Lowell Street P.O. Box 516 Atomic Safety and Licensing Manchester, NH 03105 Appeal Board Panel U.S. Nuclear Regulatory Commission Mr. J. P. Nadeau Washington, D.C. 20555 Selectman's Office 10 Central Road Philip Ahrens, Esq. Rye, NH 03870 Assistant Attorney General Department of the Attorney General Charles P. Graham, Esq.
Augusta, ME 04333 McKay, Murphy & Graham 100 Main Street Amesbury, MA 01913 i
)
Paul McEachern, Esq. Carol S. Sneider, Esq.
Matthew T. Brock, Esq. Assistant Attorney General Shaines & McEachern Department of the Attorney 25 Maplewood Avenue General P.O. Box 360 One Ashburton Place, 19th Fir.
Portsmouth, NH 03801 Boston, MA 02108 Mrs. Sandra Gavutis Mr. Calvin A. Canney Chairman, Board of Selectmen City Manager RFD 1 - Box 1154 City Hall Kensington, NH 03827 126 Daniel Street Portsmouth NH 03801 Senator Gordon J. Humphrey U.S. Senate Mr. Angie Machiros Washington, D.C. 20510 Chairman of the Board of (Attn: Tom Burack) Selectmen
. Town of Newbury Senator Gordon J. Humphrey Newbury, MA 01950 One Eagle Square, Suite 507 Concord, NH 03301 Mr. Peter S. Matthews Attn: Herb Boynton Mayor City Hall Newburyport, MA 01950 H. Joseph Flynn, Esq.
Office of General Counsel Mr. William S. Lord Federal Emergency Management Board of Selectmen Agency Town Hall - Friend Street 500 C Street, S.W. Amesbury, MA 01913 Washington, D.C. 20472 Brentwood Board of Selectmen Gary W. Holmes, Esq. RFD Dalton Road Holmes & Ells Brentwood, NH 03833 47 Winnacunnet Road Hampton, NH 03841 Richard A. Hampe, Esq.
Hampe & McNicholas Mr. Ed Thomas 35 Pleasant Street FEMA, Region I Concord, NH 03301 442 John W. McCormack Post Office & Court H;use Judith H. Mizner, Esq.
Post Office Square Silverglate, Ger*ner, Baker, Boston, MA 02109 Fine, Good & F :Ter 88 Broad Street l Mr. Thomas F. Powers, III Boston, MA 02110 l Town Manager, Town of Exeter l 10 Front Street l Exeter, NH 03833 1
P1
$W '
Barton 2. Cowgh 1
l l
1