Describes Status of Actions Taken,Per Licensee Commitment Ltrs Attached to License NPF-75,including Completion of Stated re-tests & Diesel Generator 2A Tech Specs
ML20150C523
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 03/14/1988
From: Hunsader S
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
References
4350K, NUDOCS 8803210053
Download: ML20150C523 (2)


Text

Commonwealth Edison

...y e

One Firj Nabonal Plaza, Chicago, Enois Address Reply to: Post Office Box 767 Chicago, llhnois 60690 0767 March 14, 1988 Mr. T. B. Murley U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, DC.

20555 Attn: Document Centrol Desk

Subject:

Braidwood Station Unit 2 Facility Operating Licensing NPF-75 Attachment I NRC Docket No. SC 157

Dear Mr. Murley:

Facility Operating License NPF-75 for Braidwood Unit 2 included in Attachment I, four (4) licensee commitment letters that were required to be completed to the satisfaction of the NRC staff as described in each of those letters. The purpose of this letter is to give you the status of the actions taken for each case. This status is presented as follows:

1.

A December 16, 1987 S. C. Hunsader letter concerns the deferral of certain pre-operation test re-tests. Re-tests CV-50 2RO32; EM-50 2RO38, PS-50 2RO35 and VD-55, 2RO29 have been completed. The remaining re-test EM-52 2RO30 is on schedule and will be completed as indicated in Attachment A to that letter. Our commitment remains in place.

A December 17, 1987 S.C. Hunsader letter concerns deferral of a component demonstration test re-test of the carbon dioxide system. That rotest was completed prior to entering Mode 4, par our commitment.

2.

A November 23, 1987 S.C. Hunsader letter describes the schedule for completion of the Technical Specification surveillance for the 2A diesel generator. This surveillance was completed prior to entering Mode 4 as indicated in that letter.

3.

December 16, 1987 S.C. Hunsader letter concerns fire protection installation status. Attachment A to that letter provided the status of structural steel fire proofing.

Attachment B to that letter provided the status of completion of fired wral. As of March 14, 1988, all fire wrap work and all the structural steel fire proofing (except for the Lower Cable Spreading Room) is completed.

ol D

9803210053 680314 hJ 0 PDR ADOCK 05000457 li p

DCD

~

. As previously agreed upon with the NRC staff the completion of the fire proofing in the Lower Cable Spreading Room (LCSR) is scheduled to be done by March 30, 1988.

4.

A December 11, 1987 S.C. Hunsader letter concerns the deferral of the control room air in-leakage test from fuel loading to completion during the Unit 2 outage, prior to entering Mode 4.

This test was completed prior to entering Mode 4 as previously committed to with a air leakage value of 533 cfm obtained from Train A and 113 cfm obtained from Train B.

This is being provided for your information at the request of the NRC staff. Please address any questions concerning this matter to this office.

l Very truly yours,

/C./M A-S. C. Hunsader Nuclear Licensing Administrator klj cc: Braidwood Resident Inspector NRC Region III S. Sands-NRR 4350K

-