Responds to Need for Addl Commitment Re Procurement Engineering Assessment Plan Noted in 880307-09 Insp.Smud Asl Verification Commitment Encl Will Provide Necessary Actions to Satisfy Issue Re Green Tag Validity Program
ML20150C483
Person / Time
Site: Rancho Seco
Issue date: 03/10/1988
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
References
GCA-88-166, NUDOCS 8803210009
Download: ML20150C483 (2)


Text

, __

~s .O

$SMUD SACHAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street. P.O. Box 15930, Sacramento CA 958521830.(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CAllFORNIA GCA 88-166 March 10, 1988 U. S. Nuclear Regulatory Commission Attn: Frank J. Miraglia, Jr.

Associate Director for Projects 11555 Rockville Pike Rockville. HD 20852 D'.cket No. 50-312

'an ho Seco Nuclear Generating Station License No. DPR-54 PROCUREMENT ENGINEERING ASSESSMENT PLAN - ASL VERIFICATION 00M4ITHENT

Dear Mr. Miraglia:

The NRC Procurement / Materials Control Inspection team has y st completed a follow-up inspection (March 7-9, 1988) at Rancho Seco, with specific emphasis on the information provided in the Procurement Engineering Assessment Plan (PEAP) "Interim Report," dated and transmitted to your office via letter GCA 88-135, March 1, 1988.

During the follow-up inspection it was determined by the PEAP team that an additional commitment was necessary. Specifically, the SHUD ASL Verification Commitment (attached) will provide the necessary actions to satisfy the issue regarding the Green Tag validity program. It should be noted that this commitment was presented to, and accepted by, the NRC Procurement Inspection Team at the exit meeting held on March 9, 1988.

Please contact me if you have any questions. Members of your staff with questions requiring additional information or clarification ray contact Gary J. Legner at (209) 333-2935, extension 4920.

Sincerely, w

A G. Carl Andognini

/ Chief Executive Officer, Nuclear Attachment cc: G. Kalman, NRC, Rockville (w/atch)

A. D'Angelo, NRC, Rancho Seco ( "" )

J.B. Martin, NRC, Region V ( ) 0[

l 8803210009 880310 PDR ADOCK 05000312 Q DCD RANCHO SECO NUCLEAR GENERATING STATION D 1444o Twin Cities Road, Herald. CA 95638 9799;(209) 333 2935

J ATTACHMENT SMUD ASL VERIFICATION COMMITMENT PROCUREMENT ENGINEERING ASSESSMENT PLAN 1

l i

)

Review 75 Green Tag Reverification Packages (Green Tag Program referenced in the Procurement Engineering Assessment Plan Interim Report, dated March 1, 1988) and obtain evidence that indicates that the suppliers' QA Program implementation had been verified during the approximate time period of purchase. Verification will be in one of the following forms:

o A SMUD QA Implementation Audit o An ASME Certificate o Listed in the CASE Register o obtaining a copy of an audit report from another nuclear utility or other acceptable source Implementation of this commitment is not a restart constraint. It should be noted that any reverification

package (associated stock code) not performed by restart will be placed on hold.