Requests 1 Wk Extension to Time Limit Imposed by 10CFR55 Re Annual Operating Exams for Licensed Operators
ML20150C480
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/02/1988
From: Fitzpatrick E
COMMONWEALTH EDISON CO.
To: Burdick T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8803210004
Download: ML20150C480 (1)


Text

__ - __. --

EEF/88.372

-- s Commonwealth Edison 5

7 N

Br:ldwood Nucint Power Station

~

l

/. Rout 91, Box 84 u

<\\,/a Braceville, Illinois 60407 s

'T {

- Telephone 815/458-2801 b c/( W go-yy&

March 2, 1988 Mr. Tom Burdick Chief, Operator Licensing Branch U.S. Nuclear Regulatory Commission 799 Roosevelt Rd., Bldg., #h Glen Ellyn, Il.

60337

Dear Mr. Burdick:

The Code of Federal Pegulations 10CFR55, as ammended 25 May 1987, require annual operating examinations for all licensed operators to be completed within one year of the effective date of the new rule.

Due to the nature of our Requalification Program, and scheduling conflicts caused by Braidwood and Byron Station both sharing the same simulator, Crew F will not complete their operating examinations until Wednesday, June 1, 1988.

In regards to these examinations, Braidwood Station requests a one week extension to the time limits imposed by the new 10CFR55 rule.

If you or your staff have any questions regerding this matter, please contact Mr. George Vanderheyden, extension 2878 at this facility.

Sincerely, l

U

h. E."E. Fitzpatrick l

(/

Station Manager l

Braidwood Station EEF/GV/srl cc: W. McGee G. Vanderheyden K. Gerlin P. Barnes 1

0) i

'MAb b j987 0

8803210004 880302 i

PDR ADOCK 05000456 l-V DCD 1

l.