Summary of 880309 Meeting W/State of Nj Bureau of Nuclear Engineering (Njbne) & Div Re Enhancing Interface Between Njbne of Nuclear Facilities Sited in State of Nj & Appropriate Mgt
ML20150C433
Person / Time
Issue date: 03/10/1988
From: Anthony Mendiola
Office of Nuclear Reactor Regulation
To: Boger B
Office of Nuclear Reactor Regulation
References
NUDOCS 8803180243
Download: ML20150C433 (7)


Text

.

GAR 101988 i

MEMORANDtM FOR:

Bruce A. Boger, Assistant Director for Pegion I Reactors Division of Reactor Projects I/II FROM:

Anthony J. Mendiola, Technical Assistant for Recion I Reactors Division of Peactor Projects I/II

SUBJECT:

SUPWARY OF MEETING NOTES FPOM DRPR/NJBNE MEETING ON MARCH 9, 1988 A meeting was held on March 9, 1988 between members of the New Jersey Bureau of Nuclear Engineering (NJBNE) and the Division of Reactor Projects (OPPR).

The purpose of this meeting was to enhance the interface etween the tRBNE Project Maragers of nuclear facilities sited in New Je and appropriate NRR project manacement.

The meeting opened with brief opening statements by Bruce Boger, Assistant Director for Pegion I Reactors and Mr. Dave Scott, NJBNE Bureau Chief.

Working from a prepared presentation package, the NJBNE r,crbers discussed in detail how their organization functioned, knong the items discussed:

The chain of command up to the Governor of the State of New Jersey The interaction between the Radiation Protection Programs Element of the Division of Environmental Quality, of which the BNE is a part.

The specific functions of each bureau were discussed.

The interaction between the three groups in the BNE (Nuclear Engineering, Nuclear Emergency Preparedness, and Nuclear Environmental Engineering).

The charter of the FIE, along with how the BNE functions and their current goals of FY88.

The methodology and status of the State of New Jersey's evaluation of the ambient radiation levels around the state's nuclear power plants. Some sarple data available from their system was presented.

A brief presentation on the current protress to completion of an Issue Review Process was given. Members of OPPR gave guidance as to who was the best point of cor. tact for these issues, h

~,

gpggASiBSW[,

s0

16AR 1019HR Pruce A. Boger Upon completion of the presentation, Bruce Boger gave a description of the NRR reorganization and how the licensing process currently functions. He recomended that, wherever possible, the NJBNE Project Managers should comunicate with the DRPR Project Managers in all matters.

If any comunication difficulties should arise, they would be followed up to the DRPR Project Directorates, or if necessary, to Bruce himself. There was a brief discussion on the current status of the AE00's system of Perfomance Indicators and on the NRC's Backfit Rule.

One of the concerns of the NJBNE was an apparent inconsistency in the granting of exemptions by the NRC. They felt the NPC had granted numerous exemptions to one plant, but not another.

After brief closing remarks, which included the desire for more interaction between the two groups, the rceeting was adjourned.

/s Anthony J. Mendiola, Technical Assistant for Region i Reactors Division of Reactor Projects I/II

Enclosure:

Attendence t.ist ec w/ enclosure:

Mr. David M. Scott, Chief Pureau of Nuclear Engineering Department of Environmental Protection State of New Jersey Trenton, New Jersey 086?5 DRP :

RI:TA eitt'tola:ah r //o /88

' t 9.

ATTENPANCE LIST f

DRPR/NJPNE MEETING

(

PARCH 9, 1988

[

Dave Scott NJBNE i

i Leo Hamersky NJBNE Kent Tosch NJBNE Suren Singh NJBNE l

Walter Butler NRR i

Shirley Norris NRR Alexander Dromerick NRR Donald Fischer NRR John Stolz NRR Anthony Mendiola NRR r

i Rruce 9oger NRR Frederick Combs State Programs l

4 i

I f

i l

)

4 1

?

i I

l L

.._,.,, - _,_-..____ _..- ____ m _, _ - -

.. _ ~. _.,..., _. _,.

i l

DISTRIBUTION W ! J 588 C3iiMTTms-NRC PDR ADRI R/F 1

FJMiraglia SAYarga 4

j AJMendiola J0Thoma

)

W9utler SNorris 3

FCosss A0romerick 0Fischer JStolz RVirgilio MMiller, RI SCollins, RI I

i l

l l

Q.

,\\,

UNITED STATES NUCLEAR REGULATORY COMMISSION y

e 7.

I wAsweoTow, o. c. rosso 9,

j March 10,1933 MEMORANDUM FOR:

Bruce A. Boger, Assistant Director for Regien I Reactors Division of Reactor Projects I/II FROM:

Anthony J. Mendiola, Technical Assistant for Region I Reactors Division of Reactor Projects I/II

SUBJECT:

SUMMARY

OF MEETING NOTES FROM DRPR/NJBNE MEETING ON MARCH 9, 1988 A meeting was held on March 9,1988 between members of the New Jersev Bureau of Nuclear Engineering (NJBNE) and the Division of Reactor Projects (DRPR).

The purpose of this meeting was to enhance the interface between the NJBNE Project Managers of nuclear facilities sited in New Jersey and appropriate NRR project management.

The meeting opened with brief opening statements by Bruce Boger, Assistant Director for Region I Reactors and Mr. Dave Scott, NJPNE Rureau Chief.

Working from a prepared presentation package, the NJBNE members discussed in detail how their organization functioned. Among the items discussed:

The chain of comand up to the Governor of the State of New Jersey The interaction between the Padiation Protection Programs Element of the Division of Environmental Quality, of which the BNE is a part.

The specific functions of each bureau were discussed.

The interaction between the three groups in the BNE (Nuclear Engineering Nuclear Emergency Preparedness, and Nuclear Environmental Engineering).

The charter of the BNE, along with how the BNE functions and their current goals of FYB8.

The methodology and status of the State of New Jersey's evaluation of the ambient radiation levels around the state's nuclear power plants.

Some sample data available from their system was presented.

A brief presentation on the current progress to completion of an Issue Review Process was given. Menbers of DRPR gave guidance as to who was the best point cf contact for these issues.


.-,r

Q Bruce A. Roger

-?.

March 10,1983 Upon completion of the presentation, Bruce Roger gave a description of the NRR reorganization and how the licensing process currently functions.

He i

recommended that, wherever possible, the NJBNE Project Managers should cotmunicate with the DRPR Project Managers in all matters.

If any comunicatien difficulties should arise, they would be followed up to the DRPR Project Directorates, or if necessary, to Bruce himself. There was a brief discussion on the current status of the AE0D's system of Performance Indicators and on the NRC's Packfit Pule.

One of the concerns of the NJBNE was an apparent inconsistency in the granting of exemptions by the NRC. They felt the NPC had granted numerous exemptions l

to one plant, but not another.

1 After brief closiro remarks, which included the desire for more interaction between the two groups, the meeting was adjourned.

i 4{

a An

1. Mendiola, Technical Assistant for Region 1 Reactors i

Division of Reactor Projects 1/11

Enclosure:

Attendance t.ist cc w/ enclosure:

Mr. David M. Scott, Chief l

Rureau of Nuclear Enqireering

]

Departrient of Environrnental Protection State of New Jersey 3

j Trenton, New Jersey 0P625 i

i l

l I

l I

l i

I r

i l

i i

(

1 l

l

?

E s

ATTENPANCE LIST DRPR/NJPNE MEETING PARCH 9. 1988 Dave Scott NJBNE Leo Hamersky NJBNE Kent Tosch NJBNE Suren Singh NJBNE Walter Butler NRR Shirley Norris MRR Alexander Oromerick NRR Donald Fischer NRR John Stoir NRR Anthcny Mendiola NRR mruce Roger NRR Frederick Combs State Programs a

.