ML20150C166

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1988
ML20150C166
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/29/1988
From: Alden W, Middleton L
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8803180052
Download: ML20150C166 (14)


Text

_

1 PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A, PA.19101 1215)841 4000 March 15, 1988 Docket Mos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

SUBJECT:

Peach Botton Atomic Power Station Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of February,1988 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly yours, f

?

W. M. Alden l

Director Licensing Section Nuclear Support Division i

I Attachment cc:

W. T. Russell, Administrator, Region I, USNRC T. P. Johnson, PBAPS Resident Inspector S. P. Mangi, Dept. of Envir. Resources P. A. Ross, NRC (2 copies)

R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting IMP 0 Records Center i

h7N 8803180052 880229 j

DR ADOCK 0500 7

l l

l

e NRC Monthly Operations Sumary Peach Bottom Atomic Power Station February,1988 UNIT 2 Unit 2 remained shut down throughout the report period in compliance with the March 31, 1987 Shutdown Order, with maintenance and restart activities in progress. Reactor Pressure Vessel hydrostatic testing began on February 19, 1988 and continued through the end of the month.

UNIT 3 Unit 3 remained shut down throughout the report period in compliance with the March 31,1987 Shutdown Order, with recirculation system pipe replacement activities in progress.

1

a Docket No. 50-277 Attachment to Monthly Operating r

Report for February,1988

-UNIT 2 REFUEllNG INFORMATION 1.

Name of f acility:

Peach Bottom Unit E 2.

Scheduled date for next refueling shutdown:

Reload 7 completed 3.

Scheduled date for restart following refueling:

Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

No If answer is yes, what, in general, will these be?

Not applicable 5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Not applicable 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating l

procedures:

Refueling completed.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

I a Core - 764 Fuel Assemblies b Fuel Pool - 1734 Fuel Assemblies, 58 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is l

planned, in number of fuel assemblies:

l The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l l

Docket No. 50-277 Attachment to Monthly Operating Report for February,1988 Page 2 UNIT 2 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September, 1998 (September 1995, with reserve full coredischarge) i i

l l

l l

o Docket No. 50-278 Attachment to Monthly Operating Report for February,1988 UNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Botton Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 7 in progress (Major Pipe Replacement Outage) 3.

Scheduled date for restart following refueling Indeterminate due to Shutdown Order 4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical Specifications to acconnodate reload fuel and revise reactor core operating limits. Revisions to reflect modification to the primary system piping.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Reload 7 License Amendment to be submitted May,1988.

Primary System Piping Amendment to be submitted March, 1988.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or perfomance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 0 Fuel Assemblies (764 asse211es offloadedduringoutage)

(b) Fuel Pool - 2260 Fuel Asse elies, 6 Fuel Rods

Docket No. 50-278 Attachment to Monthly Operating Report for February, 1988 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on February 20, 1987. The completion date for this modification has been rescheduled for February, 1989 to accosulodate the Unit 3 pipe replacement outage.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

March, 1993 (reserve full core discharge cannot be accommodated af ter the restart following the completion of the October,1937 refueling outage until the completion of the new fuel racks)

Installation of the new fuel racks will extend the projected date of the last refueling to September, 2000 (March, 1996, with reserve full core discharge)

  • 1 AyERAGE Dklly WIT mR LEM DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE MARCH 15, 1988 COMPANY PHILADELPHIA ELECTRIC COMPANY L. L. HIDDLETON TECHNICAL ASSISTANT LICENSING SECTION 14JCLEAR SUPPORT DEPARTNENT TELEPHONE (215) 841-6374 MONTH FEBRUARY 1988 OAY AVERAGE DAILY POHER LEVEL DAY AVERAGE DAILY PONER LEVEL l

( P94E-NET 1

( t94E-NE T )

1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

1 6

0 22 0

7 0

23 0

8 0

24 0

l l

i 9

0 25 0

10 0

26 0

11 0

27 0

l l

12 0

28 0

t 13 0

29 0

14 0

15 0

16 0

1

AVERAGE DAILY UNIT PCMER LEVEL DOCKET No. 50 - 278 LNIT PEACH BOTTOM UNIT 3 DATE MARCH 15, 1988 COMPAt# PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION MJCLEAR SUPPORT DEPARTMENT TELEPH0;JE 1215) 841-6374 HONTH FEBRUARf 1988 DAY AVERAGE DAILY POMER LEVEL DAY AVERAGE DAILY P0HER LEVEL (PNE-NET 1 (PNE-NETI 1

0 17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

tt 0

7 0

23 0

I I

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 C

13 0

29 0

14 0

15 0

l 16 0

l

OPERATING DATA REPORT

^

e DOCKET NO. 50 - 277 DATE MARCH 15, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-6374 OPERATING STATUS

1. UNIT NAME PEACH BOTTOM UNIT 2 l NOTES: UNIT 2 REMAINED SHUTDO>N l

1

2. REPORTING PERIOD FEBRUARY 1988 l

UNDER NRC ORDER HITH l

l l

3. LICENSED THERMAL POHER(MHT ):

3293 l

RESTART ACTIVITIES l

]

4. NAMEPLATE RATING IGROSS M ):

1152 l

CONTINUING.

l

[

g

5. DESIGN ELECTRICAL RATING INET MHE li 1065 l

l

[

j S. MAXIMUM DEDENDABLE CAPACITY IGROSS MHEls 1098 l

l

[

t

7. MAXIMUM DEPENDABLE CAPACITY (NET MHE ):

1051 l

l

8. IF CHAtGES DCCUR IN CAPACITY RATINGS (ITEMS PAk2ER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASOPGI
9. PDHER LEVEL TC HHICH RESTRICTED, IF ANY INET MHE):
10. RE ASotG FOR RESTRICTIOtG, IF ANY THIS NONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 696 1,440 119,712
12. NUMBER CF HOURS REACTOR HAS CRITICAL 0

0 74,196.8

13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0 l
14. HOURS GENERATOR ON-LINE 0.0 0.0 71,066.8
15. UNIT RESERVE SHUTDOHN HOURS 0.0 0.0 0.0 l

l

16. GIOSS THERMAL ENERGY GENERATED (MHH) 0 0

212,810,745 l

17. GROSS ELECTRICAL ENERGY GENERATED (MHH) 0 0

70,019,230

18. NET ELECTRICAL ENERGY GENERATED IMHH)

-4,828 e

-9,063 67,032,053 l

PAGE 1 OF 2 r

c..

., ~ -

s.

OPERATING DATA REPORT (CONTINUED)

DOCKET NO. 50 - 277

-a DATE.

ItARCH 15, 1984 THIS NONTH YR.TO-DATE CUHULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 60.0
20. UNIT AVAILABILITY FACTOR.

0.0 0.0 60.0

21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 53.3
22. UNIT CAPACITY FACTOR (USING CER NE)1 0.0 0.0 52.6
23. UNIT FORCED CUTAGE RATE 0.0 0.0 14.6
24. SHUTDC+NS SCHEDULED OVER NEXT 6 NONTHS ITYPE, DATE: AND DURATION OF EACHit REFUELING CUTAGE
25. IF SHUTDOHN AT END OF REPORT PERIOD. ESTIMATED DATE OF STAF.TUPI

'IO EE ".E'IT.TrC

26. UNITS IN TEST STAT 1JS IPRIOR TO CottiERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COtt1ERCIAL OPERATION 07/05/74 PAGE 2 0F 2 m. HEGATIVE VALUE REPORTED FOR CONSISTENCY HITH FECERAL ENERGY REGULATORY Cort 11SSION REPORTS.

^

OPERATING DATA REPORT DOCKET No. 50 - 278 DATE MARCH 15, 1988 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TELEPHONE ( 215) 841-6374 OPERATING STARJS

1. WIT NAME R PEACH BOTTOM UNIT 3 l NOTESI LNIT 3 REMAINED SHUTDO>N l

l l

2. REPORTING PERIOD FEBRUARY, 1068 l

UNDER NRC ORDER HITH l

l l

3. LICENSED THERMAL P0HERIMKT):

3293 l

REFUEL AND PIPE REPLACEMENT l

l l

4. NAMEPLATE RATING L GROSS MNE ):

1152 l

IN PROGRESS.

l l

l

5. DESIGN ELECTRICAL RATING INET MHEla 1065 l

l l

l

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 1098 l

l I

g

7. MAXIMUM DEPENDABLE CAPACITY INET MHE):

1035 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS IITEMS NUtSER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS
9. P0HER LEVEL TO HHICH RESTRICTkD, IF ANY LNET MHE):
10. RE ASONS FOR RESTRICTIONS, IF At#I THIS HONTH YR-TO-DATE Cl.HJLATIVE
11. HOURS IN REPORTING PERIOD 696 1,440 115,608
12. NUMBER OF HOURS REACTOR HAS CRITICAL 0

0 76,357

13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0 1%. HOURS GENERATOR DN-LINE 0.0 0.0 73 929.3
15. UNIT RESERVE SHUTDOHN HOURS 0.0 0.0 0.0
16. CROSS THERMAL ENERGY GENERATED (MHH) 0 0

215,278,901

17. GROSS ELECTRICAL ENERGY GENERATED IMHH1 0

0 70,611.432

18. NET ELECTRICAL ENERGY GENERATED (MHH)

-4,828 m

-9,063 67.693,092 PAGE 1 0F 2

~

L 4

OPFRATING DATA REPORT (CONTINUED)

DOCKET No. 50 276 i

DATE HARCH 15, 1988 THIS HONTH YR.TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 0.0 0.0 63.9
20. UNIT AVAILABILITY FACTOR 0.0

- 0.0 63.9

21. UNIT CAPACIW FACTOR (USING HOC NET) 0.0 0.0 56.6
22. UNIT CAPACITY FACTOR LUSING DER NET) 0.0 0.0 55.0
23. LNIT FORCED OUTAGE RATE 0.0 0.0 13.3
24. SHUTDO>NS SOMEDULED OVER NEXT 6 MONTHS LTYPE, DATE, AND DURATION OF EACH).

INDETERMINATE UNTIL NRC ORDER IS SATISFIED.

25. IF SHUTDokti AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP1

'IO EE CNTO

25. UNITS IN TEST STATUS (PRIOR TO CottiERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 C0ffiERCIAL CPERATION 12/23/74

...+....

PAGE 2 0F 2

'?

s UNIT SHUTDONS AND P0HER REDUCTIONS DOCKET NO. 50 - 277 LNIT NAME PEACM BOTTOM LMIT 2 DATE t1 ARCH 15, 1988 REPORT HONTH FEBRUARY, 1968 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING SECTION PAJCLEAR SUPPORT DEPARTHENT TELEPHONE ( 215) 841-6374 l

l l

l l METHOD OF l LICENGEE ISYSTEMICOMPONENTl CAUSE AND CORRECTIVE I

ITYPElDURATICNIREASONISHUTT1tc DOW I EVENT l CODE l CODE l ACTION TO 3.1 DATE l (111 IHOURS)I (2) l REACTOR (3) l REPORT 8 l (4) l (5) l PREVENT RECURRENCE 1

I I

I I

I I

I I

'7 1 680201 i S l 696.0 l C l 1

l N/A l RC l FUELXX l CONTINUATIDH CF RESTART ACTIVITIES.

I I

I ----- 1 I

I I

I I

i l 696.0 1 I

I I

I I

(1)

(2)

(3)

(4)

- FORCED REASON METHOD EXHIDIT G - INSTRUCTIONS

- SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR FREPARATION OF DATA B - MAINTENANCE OR TEST 2. HANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT ILER)

D - REGULATORY RESTRICTION 4

OTHER IEXPLAIN)

FILE INUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATICH F - ADMINISTRATIVE (5) l G - OPERATIONAL ERROR (EXPLAIN)

I H - OTHERIEXPLAIN)

EXHIBIT I. SAME SOURCE l

l l

l l

L _.

i.

=

c.

s.

+..

e 1

UNIT SHUTDOINS AND POHER REDUCTIONS DOCKET No. 50 - 278 WIT NAME PEACH 60TTON WIT 3 DATE PARCH 15, 1968 REPORF MONTH FEBRUARY,1968 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY

...........................a, L. 1. MIDDLETON TECINICAL ASSISTANT LICEtGING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (215) 641-6374 l

i l

l HETH30 0F l LICENSEE lSYSTEMICOMPONENTI CAUSE AND CORRECTIVE I

ITYPE l DURATION ! RE ASON I SHUTTING 00tN I EVENT l CODE I CODE l ACTION TO J.!

DATE l 11)l (HOURS)l (2) l RE ACTOR ( 3 ) l REPORT S I (4) l IS) l PREVENT RECURRENCE I

I I

I I

I I

I l

7 l 6802D1 1 S l 696.0 l C l 1

l N/A l RC l FUELXX l CONTINUATION CF REFUEL AND PIPE REPLACEMENT l

l l

l l

l l

l l ACTIVITY.

1 I

i ----- 1 I

I I

i i

i i

I 696.D 1 1

1 I

I I

(1)

(2)

(3)

(4)

- FORCED REAsoil HETH00 EXHIBIT G - INSTRUCTI0ttS

- SCHEDULED A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARATI0H OF DATA B - MAINTENANCE OR TEST 2. MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT ILER)

D. REGULATORY RESTRICTIDH 4 - OTHER IEXPLAIN)

FILE INUREG-D161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE 15)

G - OPERATIONAL ERROR E EXPLAIN)

H - OTHERt EXPLAIN)

EXHIBIT I - SAME SOURCE