Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 ML20199B6301997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H5991997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20216H6071997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Vogtle Electric Generating Plant ML20210K5081997-07-31031 July 1997 Monthly Operating Repts for July 1997 for VEGP ML20140D7301997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Vogtle Electric Generating Plant ML20141D8531997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20137T6191997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Vogtle Electric Generating Plant ML20136G3471997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Vogtle Electric Generating Plant Units 1 & 2 ML20134H3481997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20133F6551996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Vogtle Electric Generating Plant,Unit 1 & 2 ML20132B9671996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20134K7361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20128N1541996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Vogtle Electric Generating Plant,Units 1 & 2 ML20117N1731996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20116J3461996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20115E9821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Vogtle Electric Generating Plant ML20112H6411996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20111B2461996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20101R0251996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Vogtle Electric Generating Plant ML20100R2701996-02-29029 February 1996 Monthly Operating Repts for Feb 1995 for Vogtle Electric Generating Plant ML20100F2071996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Vogtle Electric Generating Plant Units 1 & 2 ML20096C3051995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Vogtle Electric Generating Plant,Units 1 & 2 ML20095E0201995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Vogtle Electric Generating Plant ML20094J0741995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Vogtle Electric Generating Plant Units 1 & 2 ML20093F5031995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Vogtle Electric Generating Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
. .
. l
,t , . '-
- GEORGIA POWER COMPANY MONTHLY OPERATING DATA REPORT PLANT V0GTLE UNIT 1* l m
r_.g :. . - - ~ .A
= =- .
{
., o w, e .
j a&-%
\ c.; g M
i
,l , , ,
~.
y a' l , , ,g.;,, - ,
- .7 -
- Unit 1 only; Unit 2 under '[-
3 Construction.
\'
l pf333%s80 $s8S{jp
! a i
GeorgiaPower d ENCLOSURE 1 TABLE OF CONTENTS PLANT V0GTLE - UNIT 1 NRC DOCKET 50-424 OPERATING LICENSE NPF-68 MONTHLY OPERATING REPORT Februarv. 1988 NARRATIVE REPORT Page El-1 OPERATING DATA REPORT Page El-2 AVERAGE DAILY P0HER LEVEL Page El-3 UNIT SHUTD0HNS AND POWER REDUCTIONS Page El-4 0080m 700775
NARRATIVE REPORT DOCKET NO. 50-424 UNIT 1 DATE: MAR 3,[988 COMPLETED BY: 5.C. DILWORTH TELEPHONE: (404) 724-0114 m3370 FEBRUARY t 0000 PLANT STATUS IS MODE 4 CONTINUED FORCED OUTAGE DUE TO RHR CROSSOVER VALVE PROBLEMS.
FEBRUARY 2 09:50 ENTERED MODE 5 TO REPA!R AHR VALVES.
FEBRUARY 6 13:38 ENTERED MODE 4 CONTINUING PLANT WEATUP.
FEBRUARY 7 23:50 ENTERED MODE 3 CONT!NUING PLANT HEATUP.
FEBRUARY 9 04: 25 ENTERED MODE 2 STARTED ROD WITHDRAWAL.
FEBRUARY 9 10:07 REACTOR CR!TICAL.
FEBRUARY 10 08:09 ENTERED MODE 1.
FEBRUARY 10 !!:17 GENERATOR T!ED TO THE GRID.
FEBRUARY 12 15:00 REACTOR AT FULL POWER WITH NO OPERATIN8 PROBLEMS. -
FEBRUARY 15 16:55 REACTOR TRIP FROM FULL POWER, EICITER TRIP.
FEBRUARY 16 13:00 ENTERED MODE 2, STARTED ROD WITHDRAWAL.
FEBRUARY 1$ 13:31 REACTOR CRITICAL.
FEBRUARY 16 17:00 ENTERED MODE 1.
FEBRUARY 17 04:33 GENERATOR TIED TO THE GRID.
FEBRUARY 10 06:15 REACTOR AT FULL POWER WITH NO OPERATINS PROBLERS.
FEBRUARY 29 24:00 REACTOR OPERATING AT FULL POWER WITH NO OPERATING PROBLEMS.
I I
El-1 l
1
OPERATING DATA REPORT DOCKET NO. 50-424 DATE: MAR 3,1908 COMPLETED BY: S.C. DILWORTH TELEPHONEi (404) 724-8114 m3070 i
OPERATING GTATUS
!. UNIT NAME: A. W. V06TLE UNIT 1
- 2. REPORT PERIOD: FEB 90
- 3. LICENSED THERMAL POWER (MWt): 3411
- 4. NAMEPLATE RATING (GROSS MWe): 1157
- 5. DESIGN ELECTRICAL RATING (NET MWe): 1101
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1133
- 7. MA!! MUM DEPENDABLE CAPACITY (NET MWe): 1079
- 8. !F CHANGES OCCUF. IN CAFACITY RATINGS
(!TEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: N/A
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR 2ESTRICT!0N, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD: 696 1440 6577
- 12. NUMBEF. OF HOURS REACTOR WAS CRITICAL: 473.3 876.3 4929.2
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE: 433.1 836.1 4756.7
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH): 1387377 2752657 15413704.7
- 17. GROSS ELEC ENERGY GENERATED (MWH): 456710 915530 5099510
- 19. NET ELEC. ENER6Y SENERATED (MWH): 422900 846730 4760250 7,9. REACTOR SERV!CE FACTOR 60.0% 60.9% 74.9%
- 20. REACTOR AVAIL!BILITY FACTOR 60.0% 60.9% 74.9%
- 21. UNIT SERV!CE FACTOR: 62.2% 58.;% 72.3%
- 22. UN!T AVAILABILITY FACTOR: 62.2% 59.1% 72.3%
- 23. UNIT CAPACITY FACTOR (USING MDC NET): 56.3% 54.5% 67.2%
- 24. UNIT CAPACITY FACTOR (USINS DER NET): 55.2% 53.4% 65.8%
- 25. UNIT FORCED OUTAGE RATE: 37.8% 40.0% 24.0%
- 26. SHUTDOWNS SCHEDULED OVER THE NEIT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) REFUELING, SEPT 2,1999, 50 DAYS.
- 27. IF SHUTDOWN AT END OF REPORT PERIOD, EST! MATED DATE OF STARTUP: N/A
- 28. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION): N/A l
l El-2 l l
l
UNIT 1 AVERAGE 04!LY DOCKET NO. 50-424 POWER LEVEL DATE: MAR 3,1933 COMPLETED BY S. C. DILWORTH '
TELEPHONE: (404) 724-0114 m3070 ,
i DAY Net MN 1 ......... 0 2 ......... 0 3 ......... 0
. ......... 0 5 ......... 0 1 6 ......... 0 l 7 ......... 0 0 ......... 0 9 ......... 0 10 . ....... 67
., 11 ......... 611 l
12 ......... 1001 13 ......... 1072 14 ......... 1070 I
15 ......... 750 i 16 ......... 0 17 ......... 400 10 ......... 1044 19 ......... 1002 20 ......... 1005 {
21 ......... 1077 {
22 ......... 1075
)
23 ......... 1078 !
24 ......... 1080 25 ......... 1070 26 ......... 1001 l 27 ......... 1087 28 ......... 1086 29 ......... 1091 l
i I
i I
I 1
- I T
I
\
1 1
1 l
El-3 '
i
^
1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 424 DATE: MAR 3,1990 UNIT NAME: V06TLE UNIT 1 COMPLETED BY S. C. DILWORTH TELEPHONE: (404) 724-8114 v3870 REPORT MONTH FEB 80 7.......................................
1 I i 1 i EIEI 1Y I I 1 I i !TI 1A I T ILICENSEEl sci 1 1 I i 1Yl I S ! H I EVENT I T 0_lCOMPONENTI CAUSE & CORRECTIVE I I I I P IDURATIONI O I O I REPORT I E D I CODE ! ACTION TO I I NO. I DATE I E !(HOURS) !NIDl NUMBER I M E l(SUBCODE)! PREVENT RECURRENCE 1 3.......l......l...l........l...l...l........l.....l.........l.............................!
88-3 19801231 F l 227.29 i A 4 i N/A I EA I RLY21 ISEE DELON I I 88-4 1880215 Fl 35.63 1 6 1 3I N/A I EL I GEN ISEE BELOW l i i 1 1 1 1 I I I I I l.......l......l...l........I...l...l........l.....l.........I.............................!
88-3 CAUSE: THIS IS A CONTINUATION OF JANUARY'S OUTAGE WITH THE RHR CROSSOVER VALVES lHV-8716A AND B BEING THE CRITICAL ITEM.
98-3 CORRECTIVE ACTION: RHR CROSSOVER VALVES REPAIRED.
88 4 CAUSE: THE CAUSE OF THE EVENT WAS PERSONNEL ERROR. THE MAINTENANCE ELECTRICIAN TOOK COLLECTOR READINGS USING A STEEL DOWEL INSTEAD OF A WOODEN DOWEL CAUSING A SHORT TO GROUND.
88-4 CORRECTIVE ACTION: THE MAINTENANCE FOREMAN HAS BEEN COUNSELED, EMPHAS!!!NG THE IMPORTANCE OF UNDERSTANDING MWO WORK INSTRUCTIONS AND INSURING H!S WORKMEN UNDERSTAND HOW TO PROPERLY PERFORM THE ASSIGNED TASKS.
l l
l l
F FORCED REASON: METHOD: EVENTS REPORTED INVOLVE St SCHEDULED A-EQUIPMENT FAILURE (EIPLAIN) 1 - MANUAL A GREATER THAN 201 l B. MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AYERAGE l C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR !'
D-RESULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-OPERATOR TRAIN!NG & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EIPLAIN) 6-OPERATIONAL ERROR (EIPLAIN) !
H-0THER (EIPLAIN) l El-4 I