ML20150B740

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Emergency Planning & Preparedness Requirements for Nuclear Power Plant Fuel Loading & Initial Low Power Operations
ML20150B740
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/22/1988
From: Geaghan D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-53FR16435, RULE-PR-50 53FR16435-01618, 53FR16435-1618, NUDOCS 8807120159
Download: ML20150B740 (1)


Text

000i2r :pj;.jgg gg NOPhO iPJLE I 8 N /* V35 c..m c ii.:

U5Ni.C 1B AN 27 P340e 22,1988

[g

  • FF ICE.-

.,*'.n-Secretary of the M' 2 N Attn: Docketing and e'iv ce Branch U.S. Nuclear Regulatory Commision Washington D.C.

20555 Daniel F. Geaghan 50 Taft Rd.

Portsmouth, NH 03801

Dear Sir,

As a citizen who sees the many advantages of Nuclear Electrical Generation, I am writing to voice my support for the Clarification of the Emergency Planning Requirements for Low Power Testing.

.My family and I live within the 10 mile EPZ of Seabrook Station, it is my hope this clean, safe and reliable energy will be available to this regign soon.

Si erely Daniel F.

e an Daniel F. Geaghan 50 Taft Rd Portsmouth NH 03801 8807120159 080622 PDR PR PDR 50 53FR16435 b.s / O

-